City of Charlottetown Building Code Bylaw (PH-BC.3)

Charlottetown, Prince Edward Island · adopted 2020-12-17 · summary & facts

This is the exact embedded text of the captured official document. Snapshot 306440fb2907 · verified 2026-10-18 · original document · archived snapshot · unofficial consolidation, the official version is held by the municipal clerk.

Bylaw Name: Building Code Bylaw (PH-BC.3) Effective Date: December 17, 2020 Revision No: 000 Date amended: December 17, 2020 CITY OF CHARLOTTETOWN - BUILDING CODE BYLAW PH-BC.3 2 1. Scope 1.1. Authority 1.1.1. This bylaw is enacted under the authority of the Municipal Government Act R.S.P.E.I 1988, Cap. M-12.1 and Section 26 of the Building Codes Act, RSPEI 1988 Chapter B5.1. 1.1.2. This bylaw maybe cited as the City of Charlottetown Building Code Bylaw and may be referred to as the Building Code Bylaw. 1.2. Repeal 1.2.1. This Bylaw shall come into force effective the date of Council and the Minister's approval. 1.2.2. The City of Charlottetown Building Code Bylaw (November 01, 2018) is hereby repealed. 2. Provincial Act and Regulations and Administration 2.1. The PEI Building Code Act and Building Code Regulations 2.1.1. The PEI Building Codes Act & Regulations were adopted by the Province as of March 31, 2020 and are hereby adopted in the Municipality except as may otherwise or additionally be provided for herein. 2.1.2. This Bylaw utilizes the same numbering system and italicizing of definitions as the National Building Code of Canada, 2015. 2.2. Administration and Enforcement 2.2.1. The "authority having jurisdiction" shall administer and enforce this Bylaw. 3. Definitions 3.1. Definitions contained in the Zoning & Development Bylaw and the PEI Building Codes Act & Regulations and the National Building Code of Canada, 2015 also apply in this Bylaw, unless the context clearly otherwise requires. Building Permit means a building permit as required and/or obtained pursuant to the Zoning & Development Bylaw Council means the Mayor and Councilors of the City of Charlottetown. Municipality means the City of Charlottetown established pursuant to the Municipal Government Act R.S.P.E.I. 1988, Cap. M-12.1. CITY OF CHARLOTTETOWN - BUILDING CODE BYLAW PH-BC.3 3 4. Responsibilities and Obligations 4.1. Permit Application(s) 4.1.1. To obtain a building permit or demolition permit, an applicant must complete an application form which shall be provided by the Municipality. 4.1.2. All applicable drawings, documents and project details will be required at time of submission of application. 4.2. Fees 4.2.1. Permit application fees shall be set out in the Municipality's Fees Bylaw. 4.3. Abandoned Application 4.3.1. When the necessary documentation in support of an application for a building or demolition permit has not been provided in conformance with the requirements of this Bylaw within six (6) months after it is filed with the Municipality, the application shall be deemed to have been abandoned. 4.4. Plumbing and Electrical 4.4.1. The sole authority having jurisdiction respecting Plumbing and Electrical approvals and permits is the Province of Prince Edward Island. This is not the Municipality's responsibility. 4.5. Single Family homes exception 4.5.1. The one (1) year exception under 44. (3) of the Provincial Building Codes Regulations does not apply within the Municipality. 4.6. Decks 4.6.1. Decks attached to buildings and /or at a height of 600mm or greater above ground level will require frost protection and a Building Permit regardless of size. 4.6.2. Decks not attached to buildings up to 55m² (592sqft), and at a height less than 600mm to ground level do not require a Building permit, however a development permit would be required. 4.7. Relocated Buildings 4.7.1. Where the whole or any part of a building that is relocated within the area of jurisdiction of the authority having jurisdiction this Bylaw applies to the entire building and to the parts of the building that are being altered or constructed. CITY OF CHARLOTTETOWN - BUILDING CODE BYLAW PH-BC.3 4 4.8. Demolished Building 4.8.1. When the whole or any part of a building is demolished, this Bylaw applies to the work involved in the demolition and to the work required to any parts remaining after demolition to the extent that deficiencies occurring or remaining after demolition require correction. 4.9. Damaged Building 4.10.1 When a building is damaged by fire, earthquake or other cause, this Bylaw applies to the work necessary to reconstruct damaged portions of the building. 4.10. Suites of Residential Units Required to be Barrier Free 4.10.1. See Schedule B. 4.11. Withhold issuance until satisfied 4.11.1. The authority having jurisdiction may withhold the issuance of a Building permit until satisfied that any and all applicable laws, bylaws, regulations or requirements under the Planning Act, the Building Codes Act & Regulations and the Municipal Government Act, including the Municipality's Zoning & Development Bylaw, the Fire Prevention Bylaw, any lot grading plan and/or Development Agreement, have been complied with; and, all required permits have been issued by the Development Officer. 4.12. Notification for Inspection and Field Review of Construction 4.12.1. The owner of a building being constructed under the scope of Part 9 of the Code shall notify the authority having jurisdiction who may carry out inspection(s), at the following stage(s) of construction for compliance with the Building Code: i. Footings and Foundation, before commencing backfilling of the laterally supported foundation and before a superstructure is placed on the foundation. ii. Under slab insulation & vapour barrier, and Radon Pipe installation. iii. Framing and Mechanical. iv. Wall and Attic Insulation & vapour barrier before wall framing is covered, v. Final Inspection before Occupancy. 4.13. Schedule A documents - See attached documents. 4.13.1. The documents in Schedule A are incorporated herewith and form an integral part of this Bylaw. CITY OF CHARLOTTETOWN - BUILDING CODE BYLAW PH-BC.3 5 4.13.2. The applicable documents in Schedule A shall be completed and submitted at intervals appropriate to the stage of construction so as to satisfy the requirements of this Building Code and the Provincial Building Codes Act and Regulations which: i. requires professionals to design buildings in conformance with the minimum standards of the National Building Code and the National Energy Code with sufficient drawings and documents to show how these standards have been met; and, ii. enables the Municipality to determine whether or not there has been substantial compliance of construction with the design drawings and all revisions thereto accepted by the authority having jurisdiction. CITY OF CHARLOTTETOWN - BUILDING CODE BYLAW PH-BC.3 6 page 1 of 2 Schedule "A" - Letter of Undertaking Declaration of Commitment by Owner to the Municipal Authority Having Jurisdiction Field Review of Construction Preamble Whereas the Building Code Bylaw applies to the construction or demolition of a building; And whereas the Province has adopted the National Building Code and the National Energy Code with amendments as the Charlottetown Building Code, requiring compliance with it as adopted for the construction or demolition of buildings; And whereas architects, and professional engineers are required by their respective statutes, Bylaw, and Bylaws, to ensure the general public of competent standards and ethical conduct in the design of buildings; And whereas The Provincial Building Code Act and Regulations requires professionals to design buildings in conformance with the minimum standards of the National Building Code and National Energy Code with sufficient drawings and documents to show how these standards have been met; And whereas The Provincial Building Code Regulations, requires that these buildings shall be inspected at intervals appropriate to the stage of construction to determine substantial compliance with the design drawings accepted by the authority having jurisdiction and all revisions thereto; To: The authority having jurisdiction: Date: _____________ City of Charlottetown - Planning & Heritage Department 70 Kent Street, Charlottetown, PE, C1A 1M9 Att: __________________________________________ (Building Official) Re: __________________________________________________________ Address of project (print) __________________________________________________________ Name of Project and Description (print) I (the owner) submit this Letter of Undertaking to the authority having jurisdiction along with a completed application for a building permit. The undersigned has appointed an architect(s), professional engineer(s), or designer(s) as prime consultant(s) to coordinate the Field Review of Construction for the below listed disciplines and I have attached to this Letter of Undertaking (check appropriate boxes) Field Review of Construction Commitment Declarations completed by me or the prime consultant appointed by me to coordinate the Field Review of Construction. Field Review of Construction Commitment Declarations (identified below) completed by individual designers appointed by me to perform the Field Review of Construction for the applicable discipline(s). Shall forward Field Review of Construction Commitment Declarations for those not yet appointed. CITY OF CHARLOTTETOWN - BUILDING CODE BYLAW PH-BC.3 7 page 2 of 2 Schedule "A" - Letter of Undertaking (Initial the disciplines that apply to this project. All disciplines will not necessarily be employed on every project) _____ Building Design _____ Structural _____ Mechanical _____ Electrical _____ Geotechnical _____ Plumbing _____ Fire Suppression System I shall notify the authority having jurisdiction if the architect, or professional engineer named in the attached "Review of Construction Commitment "Declarations" ceases, for whatever reason, to provide the Field Review of Construction for this building and shall appoint another architect and professional engineer immediately so that the Field Review of Construction will continue uninterrupted. This notice and the necessary Field Review of Construction Commitment Declaration(s) shall be forwarded to the authority having jurisdiction as soon as practical, but not later than 3 business days. _________________________________________ Print Name __________________________ _________ Signature Initials Sample ________________________________________ Print Name of Firm or Company ________________________________________ Print Address _________________________________________ Mailing Address ________________________________________ Telephone Email (Affix below the seal of the licensed Architect or professional Engineer in accordance with provincial legislation.) CITY OF CHARLOTTETOWN - BUILDING CODE BYLAW PH-BC.3 8 page 1 of 2 Schedule "A-1" Prime Consultant Inspection Commitment Declaration Preamble Whereas the Building Code Bylaw applies to the construction or demolition of a building; And whereas the Province has adopted the National Building Code and the National Energy Code with amendments as the Charlottetown Building Code, requiring compliance with it as adopted for the construction or demolition of buildings; And whereas architects, and professional engineers are required by their respective statutes, Bylaw, and Bylaws, to ensure the general public of competent standards and ethical conduct in the design of buildings; And whereas The Provincial Building Code Regulations requires professionals to design buildings in conformance with the minimum standards of the National Building Code and National Energy Code with sufficient drawings and documents to show how these standards have been met; And whereas The Provincial Building Code Regulations, requires that these buildings shall be inspected at intervals appropriate to the stage of construction to determine substantial compliance with the design drawings accepted by the authority having jurisdiction and all revisions thereto; To: The authority having jurisdiction: Date: _____________ City of Charlottetown - Planning & Heritage Department 70 Kent Street, Charlottetown, PE, C1A 1M9 Att: __________________________________________ (Building Official) Re: ___________________________________________________________ Address of project (print) ___________________________________________________________ Name of Project and Description (print) This is to advise that I am the architect or professional engineer appointed by the owner as prime consultant to coordinate the Field Review of Construction for the following disciplines. I hereby declare as the Prime Consultant for this project that I will coordinate the Field Review of Construction for the following disciplines which I have initialed. _____ Building Design _____ Structural _____ Mechanical _____ Electrical _____ Geotechnical _____ Plumbing _____ Fire Suppression System I attach, for your review the Field Review of Construction Inspection Commitment Declarations for each above marked and initialed discipline completed by an appropriate professional for each discipline or shall forward the Field Review of Commitment Declaration for those not yet appointed. I, and professionals who have completed the various Field Review of Construction Inspection Commitment Declarations will perform the Field Review of Construction. CITY OF CHARLOTTETOWN - BUILDING CODE BYLAW PH-BC.3 9 page 2 of 2 Schedule "A-1" I also declare that 1) I will coordinate the review of shop drawings; 2) I will coordinate the review of changes to the design documents; and 3) When satisfied that the work substantially complies with the design drawings I will complete or have completed by the appropriate professional the Declaration of Field Review of Construction and return it to the authority having jurisdiction prior to requesting the occupancy permit. Please be advised that I may delegate some or all of my duties associated with the coordination of the Field Review of Construction to another person employed by me or my firm where it is consistent with prudent professional practice to do so. The functions will however be performed under my supervision in accordance with the Engineering Profession Act, or the Architects Act. The undersigned shall notify the authority having jurisdiction, in writing as soon as practical, but not later than 3 business days if the contract for Field Review of Construction is terminated at any time during construction. _________________________________________ Print Name __________________________ _________ Signature Initials Sample ________________________________________ Print Name of Firm or Company ________________________________________ Print Address _________________________________________ Mailing Address ________________________________________ Telephone Email (Affix below the seal of the licensed Architect or professional Engineer in accordance with provincial legislation.) CITY OF CHARLOTTETOWN - BUILDING CODE BYLAW PH-BC.3 10 Schedule "A-2" - Field Review of Construction Inspection Commitment Declaration Preamble Whereas the Building Code Bylaw applies to the construction or demolition of a building; And whereas the Province has adopted the National Building Code and the National Energy Code with amendments as the Charlottetown Building Code, requiring compliance with it as adopted for the construction or demolition of buildings; And whereas architects, and professional engineers are required by their respective statutes, Bylaw, and Bylaws, to ensure the general public of competent standards and ethical conduct in the design of buildings; And whereas the Provincial Building Code Regulations requires professionals to design buildings in conformance with the minimum standards of the National Building Code and National Energy Code with sufficient drawings and documents to show how these standards have been met; And whereas the Provincial Building Code Regulations, requires that these buildings shall be inspected at intervals appropriate to the stage of construction to determine substantial compliance with the design drawings accepted by the authority having jurisdiction and all revisions thereto; To: The authority having jurisdiction: Date: ________________ City of Charlottetown - Planning & Heritage Department 70 Kent Street, Charlottetown, PE, C1A 1M9 Att: __________________________________________ (Building Official) Re: __________________________________________________________ Address of project (print) ___________________________________________________________ Name of Project and Description (print) This is to advise that I am the Architect or professional Engineer appointed by the owner or prime consultant to perform the Field Review of Construction. I hereby declare for the Design Requirements for: _____ Building Design _____ Structural _____ Mechanical _____ Electrical _____ Geotechnical _____ Plumbing _____ Fire Suppression System 1) I will review the shop drawings to determine general compliance with the design documents, however, the party producing the shop drawings remains responsible for the design expressed therein; 2) I will coordinate the review of changes to the design drawings to determine that the changes conform to the Code; and 3) When satisfied that the work substantially complies with the design drawings, I will complete the Declaration of Field Review of Construction and return it to the authority having jurisdiction prior to requesting the occupancy permit. Please be advised that I may delegate some or all of my duties associated with the Field Review of Construction to another person employed by me or my firm where it is consistent with prudent professional practice to do so. The functions will however be performed under my supervision in accordance with the Engineering Profession Act. The undersigned shall notify the authority having jurisdiction, in writing as soon as practical, but not later than 3 business days if the contract for Field Review of Construction is terminated at any time during construction. ______________________ ______________________ Print Name Signature _____________________________________________ Print Name of Firm or Company _____________________________________________ Mailing Address _____________________ ______________________ Telephone Email (Affix below the seal of the professional engineer in accordance with provincial legislation.) CITY OF CHARLOTTETOWN - BUILDING CODE BYLAW PH-BC.3 11 Schedule "A-3" Declaration of Field Review of Construction Note: This letter must be signed by a Licensed Architect or Professional Engineer as appropriate in accordance with Provincial Legislation and must be submitted after completion of the project but before the occupancy permit is issued. A separate letter must be submitted by each architect, or professional engineer hired by the owner or prime consultant. To: The authority having jurisdiction: Date: ________________ City of Charlottetown - Planning & Heritage Department 70 Kent Street, Charlottetown, PE, C1A 1M9 Att: ___________________________________________(Building Official) Re: ________________________________________________________________ Address of project (print) ________________________________________________________________ Name of Project and Description (print) I hereby declare that I have fulfilled my obligations for Field Review of Construction as defined in the Letter of Undertaking and the Inspection Commitment Declaration and advise that I have reviewed the work at intervals appropriate, to determine substantial compliance with the design and all revisions thereto as accepted by the authority having jurisdiction for the following disciplines which I have initialed. _____ Building Design _____ Structural _____ Mechanical _____ Electrical _____ Geotechnical _____ Plumbing _____ Fire Suppression System _________________________________________ Print Name ______________________ _______________ Signature Initials Sample _________________________________________ Print Name of Firm or Company _________________________________________ Print Address _________________________________________ Print Municipality Postal Code _________________________________________ Telephone Fax (Affix below the seal of the licensed Architect or professional Engineer in accordance with provincial legislation.) CITY OF CHARLOTTETOWN - BUILDING CODE BYLAW PH-BC.3 12 page 1 of 2 Schedule B SUITES OF RESIDENTIAL OCCUPANCIES REQUIRED TO BE BARRIER-FREE 1. Buildings from 12 Units up to and including 35 Units (Includes Apartments, Condominiums, hotel, motel and lodging/boarding homes.) At least one unit of twelve units (1:12) or part thereof (0.5 or greater require an extra unit) in a new Group C building of up to 35 shall conform to Section 3.8 (Part 3, Division B, Volume 1) of the National Building Code of Canada, for a barrier free unit and shall conform to the requirements as listed below. 2. Buildings of 36 Residential Units and over (Includes Apartments, Condominiums, hotel, motel and lodging/boarding homes.) (At least one unit in eighteen units (1:18) or part thereof (0.5 or greater require an extra unit) in a new Group C building of 36 units and over shall conform to Section 3.8 (Part 3, Division B, Volume 1) of the National Building Code of Canada, for a barrier free unit and shall conform to the requirements as listed below. REQUIREMENTS 1. General 1.1. Where a suite of residential occupancy is required to provide barrier free access, it shall be served by: a) Entrances in accordance with Article 3.8.2.2. NBC 2015, b) Barrier-free path of travel to, into, and throughout each required suite in accordance with Article 3.8.2.3. NBC, c) An accessible balcony if required in accordance with 3.3.1.7. (1) (c) NBC, and d) Barrier free controls for the operation of building services or safety devices, including electrical switches, thermostats and intercom switches, shall be accessible to a person in a wheelchair, operable with one hand, and mounted not more than 1 200 mm above the floor and electrical receptacles shall be located between 400 mm and 550 mm above the finished floor, except as required by clause (3)(f) (bathroom). 2. Sleeping Area 2.1. Where a suite of residential occupancy is required to provide barrier free access, it shall contain at least one sleeping area with: a) a minimum floor area 12.25 m² (131.85sqft) b) at least one horizontal room dimension not less than 3.35 m, and c) at least one closet that provides: (i) a minimum clear opening of 900 mm, (ii) clothes hanger rods located at a height of 1 200 mm, and (iii) at least one shelf located at a height of 1 370 mm. CITY OF CHARLOTTETOWN - BUILDING CODE BYLAW PH-BC.3 13 page 2 of 2 Schedule B 3. Bathroom 3.1. Where a suite of residential occupancy is required to provide barrier free access, a minimum of one accessible bathroom shall be provided with: a) a water closet conforming to Article 3.8.3.13. NBC, and be equipped with Grab Bars, conforming to 3.8.3.11 NBC (e&f); b) a clear space of 900mm wide that is parallel and adjacent to the open side of the water closet conforming to 3.8.3.12 NBC (d); c) a lavatory conforming to Article 3.8.3.15. NBC; d) a shower (If provided instead of tub), it shall conform to Article 3.8.3.16. NBC; e) a tub (If provided instead of shower), it shall conform to Article 3.8.3.17. NBC; and f) a GFI razor outlet located not more than 1 200 mm above the floor; and g) a floor space of not less than 3.7 m2 with no dimension less than 1 700 mm when the door swings out and 4.0 m2 with no dimension less than 1 800 mm when the door swings in (In a bathroom that does not have a bathtub.). 4. Kitchen 4.1. Where a suite of residential occupancy is required to provide barrier free access the kitchen shall have: a) a minimum 1200 mm clearance between counters and all opposing base cabinets, counter tops, appliances; b) a kitchen sink: i. located with the centerline at least 460mm from the side wall; ii. to have a Rim Height located between 810 and 860mm from the floor; iii. to have a knee clearance centered on the sink at least 750mmwide x 200 deep x 680mm high, with an additional toe space at least 750mm wide x230mm deep x 230mm high; iv. to have a clear floor area of at least 750mm x 1200mm, which may extend up to 480mm underneath the sink; v. to have facets that are either handles of the lever type, that are operable with a closed fist or automatically activated; vi. to not have sharp or abrasive surfaces under it; and vii. to have hot water drain pipes offset to the rear and not about the clear space. c) a minimum of one work surface that: i. is 760 mm wide x 600 mm deep and between 810 mm to 860 mm above the floor; ii. has a clear floor area 760 mm 1 200 mm which may extent [extend] 480 mm under the work surface; iii. has a knee space a minimum of 750 mm wide, 480 mm deep, and 680 high; and iv. has a minimum of one electrical receptacle shall be located at the front or side of the work surface. CITY OF CHARLOTTETOWN - BUILDING CODE BYLAW PH-BC.3 14 APPENDIX A. BYLAW REVISION HISTORY Amendment No First Reading Second Reading Adoption of Bylaw References: Details: 000 12/14/2020 12/17/2020 12/17/2020 Bylaw Amendment # PH-BC.3 Repeal of old Building Code Bylaw PH-BC.2 to and adoption of New Building Code Bylaw PH- BC.3 Bylaw