| permit required for | Permit required for: change Use; commence Development; construct/replace Structure or Deck; structural alterations; water/sewer connection; underground installation; move/demolish Structure; excavation pit; construct Street; fill; subdivide/consolidate; fence over 4 ft | s. 4.1 |
| exemptions | paving patios/sidewalks; fences under 4 ft; clotheslines, poles, radio/TV antennae (except satellite dishes over 24"); gardens; crops; landscaping/ornamental structures under 64 sq ft; routine maintenance | s. 4.1(2) |
| fees location | A schedule of fees shall be established by resolution of Council | s. 4.3 |
| authority | Development Officer; inspections by officer or agent of the Town | s. 1.4; s. 4.24 |
| fine range | first/subsequent offence: fine not exceeding $2000 plus costs; continuing offence: not exceeding $400 per day plus costs | s. 22.2(1)-(2) |
scout note
Primary: no separate building bylaw found; this Zoning and Subdivision Control Bylaw is what requires a Council development permit (application form and fee) to erect or alter a structure. Note provincial Building Codes Act permit is separate. Town page says these are the maps/bylaw in effect since 2014.