In the City of Swift Current, Saskatchewan, water & sewer rules are set by Swift Current Rural Water Pipeline Connection Bylaw No. 3-2023 and 1 other bylaw, verified 2026-10-18. Billing period: monthly. Billing basis: metered.
Swift Current Rural Water Pipeline Connection Bylaw No. 3-2023
adopted bylaw
billing basis
metered
s. 4.6
billing period
monthly
s. 4.6
scout note
Sets procedures for connecting to the Swift Current Rural Water Pipeline: application/approval process, construction timelines, water-quality standards, fee structure, customer private-service-line and storage responsibilities, and City infrastructure/billing obligations.
Water & Wastewater Utility Bylaw No. 17-2001
adopted bylaw
Governs water/wastewater connections: owners must maintain infrastructure, meet discharge/cross-connection standards, and connect within 60 days of notice; sets tiered monthly rates by meter size and consumption (higher rural rates; per-m3 for commercial/industrial).
City and Rural Water Rates (PDF)
Linked rates PDF; not opened (403).
Water and Electric Rates (City of Swift Current utility billing page)
rates page: links 'City and Rural Water Rates' PDF (showpublisheddocument/23837/639093548132170000). Rate values not read; PDF blocked.