BYLAW NO. 3 - 2023
A BYLAW of the City of Swift Current, in the Province of Saskatchewan, to
establish an application and connection process, rates, and any other information
pertaining to the Swift Current Rural Water Pipeline.
NOW THEREFORE, COUNCIL FOR THE CITY OF SWIFT CURRENT IN
COUNCIL ASSEMBLED ENACTS AS FOLLOWS:
1. Short Title
This Bylaw will be known as the "Swift Current Rural Water Pipeline
Connection Bylaw".
2. Purpose
The Swift Current Rural Water Pipeline (SCRWP) exists to deliver potable
water to rural residents and businesses (Customer) in accordance with defined
standards. This bylaw provides information on connecting to the SCRWP as
well as the regulations and criteria that govern its design.
3. Application Process
3.1 Customers wanting to connect to the SCRWP must submit a completed
application form to the City of Swift Current (City) requesting the
installation of a new connection. The City will review and evaluate
applications based on there being a suitable location for the connecting
facilities and available system capacity.
3.2 Approval must be granted by both the City and the RM of Swift Current
No.137 (RM) prior to making any new connection. Applicants should not
make development arrangements under the assumption that a connection
will be permitted without written approval.
3.3 Following approval, the City will notify the applicant and provide a cost for
the connection fee and construction of the service. The City will submit a
quote to the customer who will then review, sign, and return it to the City.
Once payment is received, construction of the connecting facilities will be
scheduled.
3.4 Quotes provided by the City to connect to the SCRWP will remain viable
for a period of 60 days.
Bylaw No. 3 - 2023
Page 2 of 5
4. Construction Process
4.1 Connecting facilities will be installed between May 1st and October 31st of
each year. Connections outside of this period may be approved but are
subject to additional charges.
4.2 All extensions to the existing pipeline mains are to be maintained by the
City and become City property at the conclusion of construction and
testing. Maintenance and repairs of the SCRWP will be the responsibility
of the City.
4.3 The City will arrange the construction of the water pipeline from the
connecting facility at the water main to the customer's property line. The
network will be isolated from individual services via a curb stop valve
installed at the property line. Connections to the main and curb stop valve
will be inspected by a Certified Operator from the City Water Distribution
department.
4.4 Service lines on private land will remain the property of the Customer and
shall be constructed and maintained at their cost.
4.5 The Customer is required to install water storage of sufficient capacity to
contain a two (2) day supply of water. Storage tanks shall be assembled
in such a manner as to maintain an air gap. Independent pressure
systems are also required.
4.6 The City will meter the water consumption at the predetermined point of
delivery and will invoice the Customer for water consumed. All Customers
will be invoiced on a monthly basis.
4.7 The City will use reasonable efforts to minimize any disruptions and
provide advanced notice to the Customer of any activities that will affect
service to the Customer.
4.8 The City reserves the right to retain the services of the contractor they see
fit to maintain or extend the SCRWP. Any work to be performed by
contractors will be inspected by a Certified Operator from the City Water
Distribution department.
5. Water Quality
5.1 The City will ensure that all potable water supplies are suitable for human
consumption and will be in accordance with all federal and provincial
regulations.
Bylaw No. 3 - 2023
Page 3 of 5
6. Permits
6.1 Saskatchewan Health is responsible for administering the Saskatchewan
Plumbing and Drainage Regulations. The Customer is required to contact
the Regional Health Authority regarding the plumbing regulations and a
permit must be obtained by the Customer prior to receiving a meter
assembly and connecting to the SCRWP.
6.2 The City will be responsible for obtaining all permits necessary for
construction of the SCRWP. Permits will vary depending on the
circumstances of construction. Any cost associated with obtaining
permits shall be charged to the Customer.
7. Connection Charges
7.1 Connection Fees: A fee for the connection to the SCRWP is required to
cover the cost of existing infrastructure and future improvements. This is a
fixed fee of $10,000 for new connections.
7.2 RM of Swift Current No.137 Allotment Fee: The RM charges an allotment
fee of $2,600 added to the cost of construction for any new Customers of
the SCRWP.
7.3 Construction Fees: A charge for the installation of the connecting facility
is required to cover the cost of construction. This fee will vary depending
on the distance of the connection from the point of delivery as well as site
conditions. The point of delivery is the customer's property line,
connection from the property line to the house is the responsibility of the
property owner. A quote will be provided and will be based on cost
recovery from the main to the property line.
7.4 Engineering Fee: In circumstances where the design for connecting a
Customer requires the services of a professional engineer or when a
permit to extend from Water Security Agency is required, there will be a
fee associated with the cost of engineering.
7.5 Crossing Permit Fee: Crossing permits may be required for some
underground crossings (e.g. CP Rail). In some cases, crossing permits
may involve a yearly renewal fee to cover administration and inspection
costs. Before finalizing design, the City shall meet with all parties involved
to determine costs and obtain approvals.
7.6 Meter Deposit: At the time of connection, subscribers will be required to
file a meter request with Customer Service at City Hall. All services are
subject to a deposit as provided within the Water and Wastewater Utility
Bylaw No.17 - 2001.
Bylaw No. 3 - 2023
Page 4 of 5
8. Billing, Rates and Payment
8.1 Terms of Payment: Payment for service is due upon receipt of the bill.
Payment must be processed by the City of Swift Current on or before the
due date shown on your utility bill to avoid a late payment fee.
8.2 Water Supply Rate: Water rates will be based on the current water rates
provided within the City of Swift Current Water and Wastewater Utility
Bylaw No.17 - 2001 with any applicable rate surcharges added.
8.3 Interest Charges: Interest charges will be applied to any past due balance.
8.4 Disconnection for Non-Payment: All overdue accounts are subject to
collection notification and may be charged an administrative fee. Any
accounts with balances past due may be subject to a disruption of
services without notification.
9. Pipeline Design Criteria, Construction Methods, and Materials
9.1 Please refer to the SCRWP construction standard.
10. Coming into Force
10.1 THIS BYLAW shall come into force and have effect from the date of final
passing.
"Al Bridal"
"Jackie Schlamp"
______________________ MAYOR ____________________ CITY CLERK
INTRODUCED AND READ a first time this 15th day of May, 2023.
READ a second time this 15th day of May, 2023.
READ a third time and finally passed this 15th day of May, 2023
Bylaw No. 3 - 2023
Page 5 of 5
Schedule "A"
Swift Current Rural Water Pipeline Bylaw
City of Swift Current - Connection Fee ................................................... $10,000