Town-wide lot standards for Appleton, which has no zoning districts. Minimum 1-acre lot, 150 ft frontage on public ways, 25 ft front/side/rear setbacks (60 ft from road centre), 34 ft height cap. A building permit from the CEO is required. Adopted 2010-06-09, amended to 2018-06-13.
Zoning & land use — Appleton, Maine
What can I build? Do I need a development permit?
The Town of Appleton, Maine has 2 adopted ordinances on file: Lot Specification and Building Permit Ordinance of the Town of Appleton, Maine; Shoreland Zoning Ordinance for the Town of Appleton, Maine, verified 2026-09-22.
State-mandated shoreland zoning ordinance regulating land use and setbacks near Appleton's water bodies (2019 version).
Regulates the siting, design, and operation of mobile home parks in Appleton; adopted 2007-06-13.
Requires site plan review for commercial development in Appleton; adopted 1986-11-04, amended 2016.
Governs review, standards and approval process for land subdivisions in Appleton.
Regulates siting, setbacks and permitting of wind energy facilities within the Town of Appleton.
Regulates siting, height and permitting of wireless communications towers/facilities; adopted 2002-06-11.