TOWN OF APPLETON, MAINE
WIRELESS TELECOMMUNICATIONS
FACILITY SITING ORDINANCE
June 11, 2002
Adopted by the Town of Appleton
CONTENTS
Section 1 Title.......................................................................................................................2
Section 2 Authority.................................................................................................................2
Section 3 Purpose....................................................................................................................2
Section 4 Applicability..............................................................................................................2
4.1 Exemptions.............................................................................................................3
Section 5 Review and Approval Authority.....................................................................................3
5.1 Approval Required....................................................................................................3
5.2 Approval Authority...................................................................................................3
Section 6 Approval Process
6.1 Pre-Application Conference........................................................................................3
6.2 Application.............................................................................................................3
6.3 Submission Waiver...................................................................................................6
6.4 Fees ......................................................................................................................6
6.5 Notice of Complete Application ...................................................................................6
6.6 Public Hearing .......................................................................................................7
6.7 Approval ...............................................................................................................7
Section 7 Standards of Review ...................................................................................................7
7.1 Planning Board Approval Standards ............................................................................7
7.2 Standard Conditions of Approval ................................................................................9
Section 8 Amendment to an Approved Application .........................................................................9
Section 9 Abandonment ..........................................................................................................9
Section 10 Appeals ..................................................................................................................9
Section 11 Administration and Enforcement ...............................................................................10
Section 12 Penalties ...............................................................................................................10
Section 13 Conflict and Severability ...........................................................................................10
13.1 Conflicts with other Ordinances ..............................................................................10
13.2 Severability .........................................................................................................10
Section 14 Definitions ............................................................................................................10
Section 15 Certificate of Adoption ............................................................................................12
WIRELESS TELECOMMUNICATIONS FACILITIES SITING ORDINANCE
Section 1. Title
This Ordinance shall be known and cited as the "Wireless Telecommunications Facilities Siting Ordinance" of
Appleton, Maine, (hereinafter referred to as the "ordinance").
Section 2. Authority
This ordinance is adopted pursuant to the enabling provisions of Article VIII, Part 2, Section 1 of the Maine
Constitution; the provisions of Title 30-A M.R.S.A. Section 3001 (Home Rule), and the provisions of the Planning and Land
Use Regulation Act, Title 30-A M.R.S.A. Section 4312 et seq.
Section 3. Purpose
The purpose of this ordinance is to provide a process and a set of standards for the construction of wireless
telecommunications facilities in order to: Implement a municipal policy concerning the provision of wireless
telecommunications services, and the siting of their facilities;
Establish clear guidelines, standards and time frames for the exercise of municipal authority to regulate wireless
telecommunications facilities;
Encourage competition in telecommunications service;
Encourage the provision of advanced telecommunications services to the largest number of businesses, institutions
and residents of Appleton;
Permit and manage reasonable access to the public rights of way of Appleton for telecommunications purposes on a
competitively neutral basis;
Ensure that all telecommunications carriers providing facilities or services within Appleton comply with the
ordinances of Appleton;
Ensure that Appleton can continue to fairly and responsibly protect the public health, safety and welfare;
Encourage the colocation of wireless telecommunications facilities, thus helping to minimize adverse visual impacts
on the community;
Enable Appleton to discharge its public trust consistent with rapidly evolving federal and state regulatory policies,
industry competition and technological development;
Further the goals and policies of the comprehensive plan, while promoting orderly development of the town with
minimal impacts on existing uses; and
Protect the scenic and visual character of the community.
Section 4. Applicability
This local land use ordinance applies to all construction and expansion of wireless telecommunications facilities,
except as provided in section 4.1.
4.1. Exemptions
The following are exempt from the provisions of this ordinance:
A. Emergency Wireless Telecommunications Facility. Temporary wireless communication facilities for emergency
communications by public officials.
B. Amateur (ham) radio stations. Amateur (ham) radio stations licensed by the Federal Communications Commission
(FCC).
C. Parabolic antenna. Parabolic Antennas less than fourteen (14) feet in diameter, that are an accessory use of the
property.
D. Maintenance or repair. Maintenance, repair or reconstruction of a wireless telecommunications facility and related
equipment, provided that there is no change in the height or any other dimension of the facility.
E. Temporary wireless telecommunications facility. Temporary wireless telecommunications facility, in operation for
a maximum period of one hundred eighty (180) days.
F. Antennas as Accessory Uses. An antenna that is an accessory use to a residential dwelling unit.
Section 5. Review and Approval Authority
5.1. Approval Required
No person or corporation shall construct or expand a wireless telecommunication facility without approval from the
Planning Board as follows:
A. Expansion of an Existing Facility and Colocation. Approval by the Planning Board is required for any expansion of
an existing wireless telecommunications facility that increases the height of the facility by no more than 20 feet; accessory use
of an existing wireless telecommunications facility; or colocation on an existing wireless telecommunications facility.
B. New Construction. Approval of the Planning Board is required for construction of a new wireless
telecommunications facility; and any expansion of an existing wireless telecommunications facility that increases the height of
the facility by more than 20 feet.
5.2 Approval Authority
In accordance with Section 5.1 above, the Planning Board shall review applications for wireless telecommunications
facilities, and make written findings on whether the proposed facility complies with this Ordinance.
Section 6. Approval Process
6.1. Pre-Application Conference
All persons seeking approval of the Planning Board under this ordinance shall meet with the Planning Board no less
than thirty (30) days before filing an application. At this meeting, the Planning Board shall explain to the applicant the
ordinance provisions, as well as application forms and submissions that will be required under this ordinance.
6.2. Application
All persons or corporation seeking approval of the Planning Board under this ordinance shall submit an application as
provided below. The Planning Board shall be responsible for ensuring that the applicant has posted notice of the application
and has been published in a newspaper of general circulation in the community.
An application for approval must be submitted to the Planning Board. The application must include the following materials
and information:
1. Documentation of the applicant's right, title, or interest in the property where the facility is to be sited, including
name and address of the property owner and the applicant.
2. A copy of the FCC license for the facility or a signed statement from the owner or operator of the facility attesting
that the facility complies with current FCC regulations.
3. Identification of: sites, buildings, structures or objects, significant in American history, architecture, archaeology,
engineering or culture, that are listed, or eligible for listing, in the National Register of Historic Places (see 16 U.S.C. 470w(5);
36 CFR 60 and 800).
4. Location map and elevation drawings of the proposed facility and any other proposed structures, showing color, and
identifying structural materials.
5. For proposed expansion of a facility, a signed statement that commits the owner of the facility, and his or her
successors in interest, to:
a. respond in a timely, comprehensive manner to a request for information from a potential colocation applicant, in
exchange for a reasonable fee not in excess of the actual cost of preparing a response;
b. negotiate in good faith for shared use by third parties;
c. allow shared use if an applicant agrees in writing to pay reasonable charges for colocation;
d. require no more than a reasonable charge for shared use, based on community rates and generally accepted
accounting principles. This charge may include but is not limited to a pro rata share of the cost of site selection, planning
project administration, land costs, site design, construction and maintenance, financing, return on equity, depreciation, and all
of the costs of adopting the tower or equipment to accommodate a shared user without causing electromagnetic interference.
6. A USGS 7.5 minute topographic map showing the location of all structures and wireless telecommunications
facilities above 150 feet in height above ground level, except antennas located on roof tops, within a five (5) mile radius of the
proposed facility, unless this information has been previously made available to the municipality. This requirement may be met
by submitting current information (within thirty days of the date the application is filed) from the FCC Tower Registration
Database.
7. A site plan:
a. prepared and certified by a professional engineer registered in Maine indicating the location, type, and height of
the proposed facility, antenna capacity, on-site and abutting off-site land uses, means of access, setbacks from property lines,
and all applicable American National Standards Institute (ANSI) technical and structural codes;
b. certification by the applicant that the proposed facility complies with all FCC standards for radio emissions is
required; and
c. a boundary survey for the project performed by a land surveyor licensed by the State of Maine.
8. A scenic assessment, consisting of the following:
a. Elevation drawings of the proposed facility, and any other proposed structures, showing height above ground
level;
b. A landscaping plan indicating the proposed placement of the facility on the site; location of existing structures,
trees, and other significant site features; the type and location of plants proposed to screen the facility; the method of fencing,
the color of the structure, and the proposed lighting method.
c. Photo simulations of the proposed facility taken from perspectives determined by the Planning Board, or their
designee, during the pre-application conference. Each photo must be labeled with the line of sight, elevation, and with the date
taken imprinted on the photograph. The photos must show the color of the facility and method of screening.
d. A narrative discussing:
i. the extent to which the proposed facility would be visible from or within a designated scenic resource,
ii. the tree line elevation of vegetation within 100 feet of the facility, and
iii. the distance to the proposed facility from the designated scenic resource's noted viewpoints.
9. A written description of how the proposed facility fits into the applicant's telecommunications network. This
submission requirement does not require disclosure of confidential business information.
10. Evidence demonstrating that no existing building, site, or structure can accommodate the applicant's proposed
facility, the evidence for which may consist of any one or more of the following:
a. Evidence that no existing facilities are located within the targeted market coverage area as required to meet the
applicant's engineering requirements,
b. Evidence that existing facilities do not have sufficient height or cannot be increased in height at a reasonable cost
to meet the applicant's engineering requirements,
c. Evidence that existing facilities do not have sufficient structural strength to support applicant's proposed antenna
and related equipment. Specifically:
i. Planned, necessary equipment would exceed the structural capacity of the existing facility, considering the
existing and planned use of those facilities, and these existing facilities cannot be reinforced to accommodate the new
equipment.
ii. The applicant's proposed antenna or equipment would cause electromagnetic interference with the antenna
on the existing towers or structures, or the antenna or equipment on the existing facility would cause interference with
the applicant's proposed antenna.
iii. Existing or approved facilities do not have space on which planned equipment can be placed so it can
function effectively.
d. For facilities existing prior to the effective date of this ordinance, the fees, costs, or contractual provisions required
by the owner in order to share or adapt an existing facility are unreasonable. Costs exceeding the pro rata share of a new
facility development are presumed to be unreasonable. This evidence shall also be satisfactory for a tower built after the
passage of this ordinance;
e. Evidence that the applicant has made diligent good faith efforts to negotiate colocation on an existing facility,
building, or structure, and has been denied access;
11. Identification of districts, sites, buildings, structures or objects, significant in American history, architecture,
archaeology, engineering or culture, that are listed, or eligible for listing, in the National Register of Historic Places (see 16
U.S.C. 470w(5); 36 CFR 60 and 800).
12. A signed statement stating that the owner of the wireless telecommunications facility and his or her successors and
assigns agree to:
a. respond in a timely, comprehensive manner to a request for information from a potential colocation applicant, in
exchange for a reasonable fee not in excess of the actual cost of preparing a response;
b. negotiate in good faith for shared use of the wireless telecommunications facility by third parties;
c. allow shared use of the wireless telecommunications facility if an applicant agrees in writing to pay reasonable
charges for colocation;
d. require no more than a reasonable charge for shared use, based on community rates and generally accepted
accounting principles. This charge may include but is not limited to a pro rata share of the cost of site selection, planning
project administration, land costs, site design, construction, financing, return on equity, depreciation, and all of the costs of
adapting the tower or equipment to accommodate a shared user without causing electromagnetic interference. The amortization
of the above costs by the facility owner shall be accomplished at a reasonable rate, over the useful life span of the facility.
13. A form of surety approved by the Planning Board to pay for the costs of removing the facility if it is abandoned.
14. Evidence that a notice of the application has been published in a local newspaper of general circulation in the
community.
6.3. Submission Waiver
The Planning Board may waive any of the submission requirements based upon a written request of the
applicant submitted at the time of application. A waiver of any submission requirement may be granted only if the
Planning Board finds in writing that due to special circumstances of the application, the information is not
required to determine compliance with the standards of this Ordinance.
The Planning Board shall limit the extent of any submission waiver granted in order to insure conformance
with the purposes and provisions of this Ordinance to the greatest extent possible, and in doing so may impose
such conditions to a submission waiver as it deems necessary. The party receiving the submission waiver shall
comply with any additional conditions imposed concerning the submission waiver to the review and approval of
the application.
6.4. Fees
A. Planning Board Application Fee
An application for Planning Board approval shall include payment of an application fee of $100.00. The application
shall not be considered complete until this fee is paid. An applicant is entitled to a refund of the application portion of fee if the
application is withdrawn within fifteen (15) days of date of filing, less all expenses incurred by the town of Appleton to review
the application.
B. Planning Board Review Fee
An applicant submitting an application for approval by the Planning Board shall pay all reasonable and customary fees
incurred by the municipality that are necessary to review the application. The review fee shall be paid in full prior to issuance
of a permit.
That portion of the review fee not used shall be returned to the applicant within fourteen (14) days of the Planning
Board's decision.
6.5. Notice of Complete Application
Upon receipt of an application, the Planning Board shall provide the applicant with a dated receipt. Within forty (40)
working days of receipt of an application, the Planning Board shall review the application and determine if the application
meets the submission requirements. The Planing Board shall review any requests for a waiver from the submission
requirements and shall act on these requests prior to determining the completeness of the application.
If the application is complete, the Planning Board shall notify the applicant in writing of this determination and
require the applicant to provide a sufficient number of copies of the application to the: Planning Board, Code Enforcement
Officer, Select Men, Road Commissioner, and Fire Department.
If the application is incomplete, the Planning Board shall notify the applicant in writing, specifying the additional
materials or information required to complete the application.
If the application is deemed to be complete, and requires Planning Board review, the Planning Board with letters
prepared by the applicant shall notify all abutters to the site as shown on the Assessor's records, by first-class mail, that an
application has been accepted. This notice shall contain a brief description of the proposed activity and the name of the
applicant, give the location of a copy of the application available for inspection, and provide the date, time, and place of the
Planning Board meeting at which the application will be considered. Failure on the part of any abutter to receive such notice
shall not be grounds for delay of any consideration of the application nor denial of the project.
6.6. Public Hearing
For applications for Planning Board approval under Section 5.1(B), a public hearing shall be held within forty (40)
days of the notice of the complete application.
6.7. Approval
Planning Board Approval. Within ninety (90) days of receiving a complete application for approval under section
5.1(B), the Planning Board shall approve, approve with conditions, or deny the application in writing, together with the
findings on which that decision is based. However, if the Planning Board has a waiting list of applications that would prevent
the Planning Board from making a decision within the required ninety (90) day time period, then a decision on the application
shall be issued within sixty (60) days of the public hearing, if necessary, or within 60 days of the completed Planning Board
review. This time period may be extended upon agreement between the applicant and the Planning Board.
Section 7. Standards of Review
To obtain approval from the Planning Board, an application must comply with the standards in this section.
7.1. Planning Board Approval Standards
A. An application for approval by the Planning Board under Section 5.1 A must meet the following standards.
1. The proposed facility is an expansion, accessory use, or colocation to a structure existing at the time the
application is submitted.
2. The applicant has sufficient right, title, or interest to locate the proposed facility on the existing structure.
3. The proposed facility increases the height of the exiting structure by no more than twenty (20) feet.
4. The proposed facility will be constructed with materials and colors that match or blend with the surrounding
natural or built environment, to the maximum extent practicable.
5. The proposed facility, to the greatest degree practicable, shall have no unreasonable adverse impact upon districts,
sites, buildings, structures or objects, significant in American history, architecture, archaeology, engineering or culture, that are
listed, or eligible for listing, in the National Register of Historic Places (see 16 U.S.C. 470w(5); 36 CFR 60 and 800).
B. An application for approval by the Planning Board under Section 5.1 B must meet the following standards
1.The applicant has sufficient right, title, or interest to locate the proposed facility at the proposed location.
2. The applicant has adequate liability insurance and other provisions to safeguard the public rights and interests.
3. Priority of Locations. New wireless telecommunications facilities must be Colocated on an existing wireless
telecommunications facility or other existing structure if at all possible. The applicant shall demonstrate that a facility
of a higher priority cannot reasonably accommodate the applicant's proposed facility.
4. Design for Colocation. A new wireless telecommunications facility and related equipment must be designed and
constructed to accommodate expansion for future colocation of at least three additional wireless telecommunications facilities
or providers. However, the Planning Board may waive or modify this standard.
5. Height. A new wireless telecommunications facility must be no more than one hundred ninety five (195) feet in
height.
6. Setbacks. A new or expanded wireless telecommunications facility must comply with the set back requirements
of one hundred five percent (105%) of its height from all property lines. The setback may be satisfied by including the areas
outside the property boundaries if secured by an easement.
7. Landscaping. A new wireless telecommunications facility and related equipment must be screened with plants
from view by abutting properties, to the maximum extent practicable. Existing plants and natural land forms on the site shall
also be preserved to the maximum extent practicable.
8. Fencing. A new wireless telecommunications facility must be fenced to discourage trespass on the facility and to
discourage climbing on any structure by trespassers.
9. Lighting. A new wireless telecommunications facility must be illuminated only as necessary to comply with FAA
or other applicable state and federal requirements. However, security lighting may be used as long as it is shielded to be down-
directional to retain light within the boundaries of the site, to the maximum extent practicable.
10. Color and Materials. A new wireless telecommunications facility must be constructed with materials and colors
that match or blend with the surrounding natural or built environment, to the maximum extent practicable. Unless otherwise
required, muted colors, earth tones, and subdued hues shall be used.
11. Structural Standards. A new wireless telecommunications facility must comply with the current Electronic
Industries Association/ Telecommunications Industries Association (EIA/TIA) 222 Revision Standard entitled "Structural
Standards for Steel Antenna Towers and Antenna Supporting Structures."
12. Visual Impact. The proposed wireless telecommunications facility will have no unreasonable adverse impact
upon designated scenic resources within the Town, as identified either in the municipally adopted comprehensive plan, or by a
State or federal agency. In determining the potential unreasonable adverse impact of the proposed facility upon the designated
scenic resources, the Planning Board shall consider the following factors:
a. The extent to which the proposed wireless telecommunications facility is visible above tree line, from
the viewpoint(s) of the impacted designated scenic resource;
b. the type, number, height, and proximity of existing structures and features, and background features
within the same line of sight as the proposed facility;
c. the extent to which the proposed wireless telecommunications facility would be visible from the
viewpoint(s);
d. the amount of vegetative screening;
e. the distance of the proposed facility from the viewpoint and the facility's location within the designated
scenic resource; and
f. the presence of reasonable alternatives that allow the facility to function consistently with its purpose.
13. Noise. During construction, repair, or replacement, operation of a back-up power generator at any time during a
power failure, and testing of a back-up generator between 8 a.m. and 6 p.m. is exempt from existing municipal noise standards.
14. Historic & Archaeological Properties. The proposed facility, to the greatest degree practicable, will have no
unreasonable adverse impact upon a historic district, site or structure which is currently listed on or eligible for listing on the
National Register of Historic Places.
7.2 Standard Conditions of Approval
The following standard conditions of approval shall be a part of any approval or conditional approval issued by the
Planning Board. Where necessary to ensure that an approved project meets the criteria of this ordinance, the Planning Board
can impose additional conditions of approval. Reference to the conditions of approval shall be clearly noted on the final
approved site plan, and shall include:
1. The owner of the wireless telecommunications facility and his or her successors and assigns agree to:
a. respond in a timely, comprehensive manner to a request for information from a potential colocation applicant, in
exchange for a reasonable fee not in excess of the actual cost of preparing a response;
b. negotiate in good faith for shared use of the wireless telecommunications facility by third parties;
c. allow shared use of the wireless telecommunications facility if an applicant agrees in writing to pay reasonable
charges for colocation.
d. require no more than a reasonable charge for shared use of the wireless telecommunications facility, based on
community rates and generally accepted accounting principles. This charge may include, but is not limited to, a pro rata share
of the cost of site selection, planning project administration, land costs, site design, construction and maintenance, financing,
return on equity, depreciation, and all of the costs of adapting the tower or equipment to accommodate a shared user without
causing electromagnetic interference. The amortization of the above costs by the facility owner shall be accomplished at a
reasonable rate, over the life span of the useful life of the wireless telecommunications facility.
2. Upon request by the Planning Board, the applicant shall certify compliance with all applicable FCC radio frequency
emissions regulations.
Section 8. Amendment to an Approved Application
Any changes to an approved application must be approved by the Planning Board, in accordance with Section 5.
Section 9. Abandonment
A wireless telecommunications facility that is not operated for a continuous period of twenty-four (24) months shall
be considered abandoned. The Planning Board shall notify the owner of an abandoned facility in writing and order the removal
of the facility within one hundred eighty (180) days of receipt of the written notice. The owner of the facility shall have forty
(40) days from the receipt of the notice to demonstrate to the planning board that the facility has not been abandoned.
If the Owner fails to show that the facility is actively being operated, the owner shall have one hundred forty (140)
days to remove the facility. If the facility is not removed within this time period, the municipality may remove the facility at
the owner's expense. The owner of the facility shall pay all site reclamation costs deemed necessary and reasonable to return
the site to its pre-construction condition, including the removal of roads, and reestablishment of vegetation.
If a surety has been given to the municipality for removal of the facility, the owner of the facility may apply to the
Planning Board for release of the surety when the facility and related equipment are removed to the satisfaction of the Planning
Board.
Section 10. Appeals
Any person aggrieved by a decision of the Planning Board under this ordinance may appeal the decision to the Board
of Appeals. Written notice of an appeal must be filed with the Board of Appeals within thirty (30) days of the decision. The
notice of appeal shall clearly state the reasons for the appeal.
Section 11. Administration and Enforcement
The CEO, as appointed by the Board of Selectmen, shall enforce this ordinance. If the CEO finds that any provision
of this ordinance has been violated, the CEO shall notify in writing the person responsible for such violation, indicating the
nature of the violation, and ordering the action necessary to correct it. The CEO shall order correction of the violation and may
take any other legal action to ensure compliance with this ordinance.
The Selectmen, or their authorized agent, are authorized to enter into administrative consent agreements for the
purpose of eliminating violations of this ordinance and recovering fines without court action. Such agreements shall not allow
a violation of this ordinance to continue unless: there is clear and convincing evidence that the violation occurred as a direct
result of erroneous advice given by an authorized municipal official upon which the applicant reasonably relied to its detriment
and there is no evidence that the owner acted in bad faith; the removal of the violation will result in a threat to public health
and safety or substantial environmental damage.
Section 12. Penalties
Any person who owns or controls any building or property that violates this ordinance shall be fined in accordance
with Title 30-A M.R.S.A. § 4452. Each day such violation continues after notification by the CEO shall constitute a separate
offense.
Section 13. Conflict and Severability
13.1 Conflicts with other Ordinances
Whenever a provision of this ordinance conflicts with or is inconsistent with another provision of this ordinance or of
any other ordinance, regulation, or statute, the more restrictive provision shall apply.
13.2 Severability
The invalidity of any part of this ordinance shall not invalidate any other part of this ordinance.
Section 14. Definitions
The terms used in this ordinance shall have the following meanings:
"Antenna" means any system of poles, panels, rods, reflecting discs or similar devices used for the transmission or reception of
radio or electromagnetic frequency signals.
"Antenna Height" means the vertical distance measured from the base of the antenna support structure at grade to the highest
point of the structure, even if said highest point is an antenna. Measurement of tower height shall include antenna, base pad,
and other appurtenances and shall be measured from the finished grade of the facility site. If the support structure is on a sloped
grade, then the average between the highest and lowest grades shall be used in calculating the antenna height.
"Colocation" means the use of a wireless telecommunications facility by more than one wireless telecommunications provider.
"Expansion" means the addition of antennas, towers, or other devices to an existing structure.
"FAA" means the Federal Aviation Administration, or its lawful successor.
"FCC" means the Federal Communications Commission , or its lawful successor.
"Height" means the vertical measurement from a point on the ground at the mean finish grade adjoining the foundation as
calculated by averaging the highest and lowest finished grade around the building or structure, to the highest point of the
building or structure. The highest point shall exclude farm building components, flagpoles, chimneys, ventilators, skylights,
domes, water towers, bell towers, church spires, processing towers, tanks, bulkheads, or other building accessory features
usually erected at a height greater than the main roofs of buildings.
"Historic or Archaeological Resources" means resources that are:
1. Listed individually in the National Register of Historic Places or eligible for listing on the National Register;
2. Certified or preliminarily determined by the Secretary of the Interior as contributing to the historical
significance of a registered historic district or a district preliminarily determined by the Secretary of the Interior to qualify as a
registered historic district;
3. Individually listed on a state inventory of historic places in states with historic preservation programs approved by
the Secretary of the Interior;
4. Individually listed on a local inventory of historic places in communities with historic preservation programs that
have been certified by Secretary of the Interior through the Maine Historic Preservation Commission; or
5. Areas identified by a governmental agency such as the Maine Historic Preservation Commission as having
significant value as an historic or archaeological resource and any areas identified in the municipality's comprehensive plan,
which have been listed or are eligible to be listed on the National Register of Historic Places.
"Historic District" means a geographically definable area possessing a significant concentration, linkage or continuity of sites,
buildings, structures or objects united by past events or aesthetically by plan or physical development and identified in the
municipality's comprehensive plan, which is listed or is eligible to be listed on the National Register of Historic Places. Such
historic districts may also comprise individual elements separated geographically, but linked by association or history.
"Historic Landmark" means any improvement, building or structure of particular historic or architectural significance to the
Town relating to its heritage, cultural, social, economic or political history, or which exemplifies historic personages or
important events in local, state or national history identified in the municipality's comprehensive plan, which have been listed
or are eligible to be listed on the National Register of Historic Places.
"Line of sight" means the direct view of the object from the designated scenic resource.
"Parabolic Antenna" (also known as a satellite dish antenna) means an antenna which is bowl-shaped, designed for the
reception and or transmission of radio frequency communication signals in a specific directional pattern.
"Principal Use" means the use other than one which is wholly incidental or accessory to another use on the same premises.
"Public Recreational Facility" means a regionally or locally significant facility, as defined and identified either by State statute
or in the municipality's adopted comprehensive plan, designed to serve the recreational needs of municipal property owners.
"Designated Scenic Resource" means that specific location, view, or corridor, as identified as a scenic resource in the
municipally adopted comprehensive plan or by a State or federal agency, that consists of:
1. a three dimensional area extending out from a particular viewpoint on a public way or within a public recreational
area, focusing on a single object, such as a mountain, resulting in a narrow corridor, or a group of objects, such a downtown
skyline or mountain range, resulting in a panoramic view corridor; or
2. lateral terrain features such as valley sides or woodland as observed to either side of the observer, constraining the
view into a narrow or particular field, as seen from a viewpoint on a public way or within a public recreational area.
"Targeted Market Coverage Area" means the area which is targeted to be served by this proposed telecommunications facility.
"Unreasonable Adverse Impact" means that the proposed project would produce an end result which is:
1. excessively out-of-character with the designated scenic resources affected, including existing buildings structures
and features within the designated scenic resource, and
2. would significantly diminish the scenic value of the designated scenic resource.
"Viewpoint" means that location which is identified either in the municipally adopted comprehensive plan or by a federal or
State agency, and which serves as the basis for the location and determination of a particular designated scenic resource.
"Wireless Telecommunications Facility" or "Facility" means any structure, antenna, tower, or other device which provides
radio/television transmission, commercial mobile wireless services, unlicensed wireless services, cellular phone services,
specialized mobile radio communications (SMR), common carrier wireless exchange phone services, common carrier wireless
exchange access services, and personal communications service (PCS) or pager services.
Section 15. Certificate of Adoption
I hereby attest that this is a true copy of the Wireless Telecommunications Facility Siting Ordinance for the Town of
Appleton, Maine duly adopted on June 11, 2002.
______________________
Appleton Town Clerk
__________________________________ ______________________
Appleton Town Seal Date