Regulates land within 250 ft of great ponds/rivers/coastal or freshwater wetlands and 75 ft of streams; districts, setbacks, non-conforming structures. Adopted under 38 M.R.S.A. Sections 435-448; requires DEP Commissioner approval per Section 4.
Zoning & land use — Milbridge, Maine
What can I build? Do I need a development permit?
The Town of Milbridge, Maine has 2 adopted ordinances on file: Shoreland Zoning Ordinance for the Municipality of Milbridge; Town of Milbridge Land Use Ordinance, verified 2026-09-22.
Milbridge's town-wide land use ordinance: districts, dimensional/setback requirements, use table, nonconforming structures, Planning Board review and Board of Appeals. Enacted 2009-11-16 per Town Clerk certification; amended 2017, 2018, 2022 and twice in 2025 (May 19 and October 5).
Planning Board permitting of ground- and roof-mounted solar systems: 25-ft height cap, 50-ft setbacks, screening/security, performance guarantee, decommissioning within 180 days of abandonment. 'Effective Date: July 12, 2023, Approved by the voters,' certified by Town Clerk.
Governs subdivision review: preapplication/sketch plan, minor vs. major subdivision procedure, conformance with zoning, water quality/wetlands/floodplain review criteria. Scanned copy with a signed/dated attestation page (exact date not legible via OCR); filename indicates a 2006 copy.
Planning Board conditional-use review of wind turbines: siting/setback, 75-ft height cap (35 ft in Shoreland Zone), fencing/warning signage, 18-month abandonment/removal rule. Town Clerk attestation dated 'Aug. 2013' (day illegible on scan).