Wind Energy Conversion Systems Ordinance
Milbridge, Maine
· summary & facts
This is the exact embedded text of the captured official document.
Snapshot 48b0d2f49609 · verified 2026-09-22 ·
original document ·
archived snapshot ·
unofficial consolidation, the official version is held by the municipal clerk.
0 CCTM =" ™«
3 ? ;
& Town of Milbridge
WIND ENERGY CONVERSION SYSTEMS ORDINANCE
SECTION 1. PURPOSE
The purpose of this ordinance is to provide standards for wind energy conversion systems that are used to
produce electrical power.
SECTION 2. AUTHORITY
The Milbridge Planning Board is vested with the authority to review and approve, conditionally approve
or reject any application for wind energy conversion systems.
SECTION 3. SEVERABILITY
Should any section or provision of this ordinance be declared by the courts to be invalid, such decision
shall not invalidate any other section or provision of the ordinance.
SECTION 4. DEFINITIONS.
(a) FAA --- Federal Aviation Administration
(b) Site -- The parcel of land where a wind energy conversion system is to be placed. The site can be
privately or publicly owned and is a single lot or may include adjacent lots.
(c) Wind Energy Conversion System -- a wind energy conversion consisting of a wind turbine, a
tower, footings, electrical infrastructure, fence and any other associated equipment of structures,
which is intended to produce electrical power.
(d) Tower height -- The vertical distance measured from the finished grade of the fixed portion of the
tower to the highest point of the blade in full vertical position.
(e) Viewshed map -- A map that shows the geographic area from which a Wind Energy Conversion
System may be seen.
SECTION 5. APPLICATION.
Applicants shall complete the Conditional Use Application and pay an application fee. Applicant shall
also submit:
© (a) Evidence of applicant's right, title or interest in the property site.
(b) A scaled representation showing the total height.
e (c) obra ae the proposed height does not exceed the recommended height by the manufacturer,
(d) The p aay wanes of each System, property lines, setback lines, fencing, access roads, right-
ol-way soraeie ane the layout of all structures within the setback area.
(e) A viewshed map, location of existing trees, and any visual screening incorporated to lessen the
System's prominence,
(f) List of all abutting property owners with their mailing address.
SECTION 6. DIMENSIONAL REQUIREMENTS
(a) ari site area -- The minimum site area for a single Wind Energy Conversion System shall be
acres,
(b) setbacks -- All Wind Energy Conversion Systems shall be set back a minimum horizontal distance
sot : times the total height of the system from property lines, roads, easements and habitable
buildings. New habitable buildings shall not be constructed within the setback area after a System
is constructed and operating.
(c) Height ~ The total height shall not exceed 75 feet, except in Shoreland Zone where the total height
Is 35°. The allowed height may be reduced if necessary to comply with FAA.
( SECTION 7. DEVELOPMENT STANDARDS
(a) The system's tower and blades shall be a non-reflective color that blends the System and its
components into the surrounding landscape to the greatest extent possible.
(b) Exterior lighting on any tower or turbine shall not be allowed except that which is required by
FAA,
(c) System shall have a locked fence at least six (6) feet in height that encloses the tower.
(d) At least two signs shall be posted on the tower at a height of five (5) feet warning of electrical
shock or high voltage and harm from revolving machinery.
|
SECTION 8. ABANDONMENT OF USE
A Wind Energy Conversion System which is not used for eighteen (18) consecutive months shall be
deemed abandoned and shall be dismantled and removed from the property at the expense of the property
owner if the system is deemed a hazard.
SECTION 9. BOARD REVIEW
The applicant shall notify all abutting property owners by certified mail, return receipt requested. If two
| or more abutters of the:Town object in writing, the Board shall schedule a public hearing within 30 days
| \ ( of acceptance of a complete application. The Board may attach conditions to approvals to ensure
| conformity with the purpose of the ordinance. If the application concerns property within the Shoreland :
zone, the criteria included in the Shoreland Ordinance shall also be reviewed. All approvals expire within
= one year of date of issuance.
SECTION 10. ENFORCEMENT
This Ordinance shall be enforced, and any violations hereof abated, by the municipal officers of the Town
of Milbridge or their duly authorized designees, and shall be enforceable by and under, and subject to all
the terms, fines and penalties of 30A MRSA 445] and 4452, as amended, which are incorporated herein
by reference.
SECTION 11. NO RETROACTIVE EFFECT
This Ordinance does not render illegal any structure, facility or use which legally existed or was under
active construction at the effective date of this Ordinance. Permits issued prior to the adoption of this
Ordinance remain valid for a period of one year from the initial date of issuance.
|
SECTION 12. AMENDMENT
E This Ordinance may be amended by a vote of Town Meeting.
SECTION 13. EFFECTIVE DATE
This Ordinance takes effect and is in force as of the date of its enactment by a duly called annual or
special Town Meeting.
|
|
|
Attest: A true copy of an ordinance entitled "Wind Energy Conversion Systems Ordinance" as certified
to me by the municipal officers of Milbridge, Maine on the - )_ day of ay AQ 252013
= Fraser
Town Clerk