Sets minimum lot sizes, setbacks and other dimensional requirements under 30-A M.R.S.A. §§3001-3014 and §4312 et seq. Cover page's '(Proposed)' label is struck through with a handwritten 'Vot'd 3/7/15' confirming adoption at that town meeting.
Zoning & land use — New Sharon, Maine
What can I build? Do I need a development permit?
The Town of New Sharon, Maine has 2 adopted ordinances on file: Town of New Sharon Minimum Lot Size Ordinance; Town of New Sharon Shoreland Zoning Ordinance, verified 2026-09-22.
New Sharon's Shoreland Zoning Ordinance (state model under 38 M.R.S.), regulating land use, setbacks and permits within the shoreland zone of great ponds, rivers, streams and wetlands. Adopted March 3, 2007; passed as amended at town meeting March 1, 2008.
Regulates siting/operation of mobile home parks, administered by the Planning Board; complies with state manufactured-housing law. No adoption date legible on the scanned copy checked.
Siting/design standards for solar energy systems. Cover page 'True Copy' attest stamp states 'Enacted 11/02/2021.'
Development/site-plan review process for significant commercial, multi-family, campground and mobile-home-park development. Text states it was 'adopted and effective by vote of the Town Meeting March 6, 2010; revised by vote of the Town Meeting March 12, 2016,' handwritten-dated to match.
Subdivision review standards under Title 23 §704 and Title 30-A. Document states 'Its effective date shall be March 3, 2007.'