TOWN OF NEW SHARON
SHORELAND ZONING
ORDINANCE
March 1, 2008
Proposed Amendments
Note: Delete text on page 4
[Alternatively to Appendix A.]
Page 46 - 47 Delete Appendix A
Passed as amended 3/1/2008
Rose Mary Eller, Town Clerk
1
NEW SHARON SHORELAND ZONING ORDINANCE
TABLE OF CONTENTS
Page
1. Purposes ............................................................................................................................... 1
2. Authority ................................................................................................................................ 1
3. Applicability ........................................................................................................................... 1
4. Effective Date ........................................................................................................................ 1
A. Effective Date of Ordinance and Ordinance Amendments ................................................ 1
B. Repeal of Municipal Timber Harvesting Regulation ........................................................... 2
5. Availability ............................................................................................................................. 2
6. Severability............................................................................................................................ 2
7. Conflicts with Other Ordinances ............................................................................................ 2
8. Amendments ......................................................................................................................... 2
9. Districts and Zoning Map ....................................................................................................... 2
A. Official Shoreland Zoning Map ........................................................................................ 2
B. Scale of Map ................................................................................................................... 2
C. Certification of Official Shoreland Zoning Map ................................................................. 2
D. Changes to the Official Shoreland Zoning Map ............................................................... 3
10. Interpretation of District Boundaries ...................................................................................... 3
11. Land Use Requirements........................................................................................................ 3
12. Non-conformance.................................................................................................................. 3
A. Purpose ........................................................................................................................... 3
B. General ........................................................................................................................... 3
C. Non-conforming Structures.............................................................................................. 3
D. Non-conforming Uses ...................................................................................................... 6
E. Non-conforming Lots ....................................................................................................... 6
13. Establishment of Districts ...................................................................................................... 7
A. Resource Protection District ............................................................................................ 7
B. Limited Residential District .............................................................................................. 8
C. Limited Commercial District ............................................................................................. 8
D. General Development I District ........................................................................................ 8
E. General Development II District ....................................................................................... 9
F. Stream Protection District ............................................................................................... 9
14. Table of Land Uses ............................................................................................................. 11
15. Land Use Standards ......................................................................................................... 12
A. Minimum Lot Standards ................................................................................................. 12
B. Principal and Accessory Structures ............................................................................... 12
C. Piers, Docks, Wharves, Bridges and Other Structures and Uses Extending Over or
Beyond the Normal High-Water Line of a Water body or Within a Wetland ................... 15
D. Campgrounds ................................................................................................................ 16
E. Individual Private Campsites ........................................................................................ 16
F. Commercial and Industrial Uses .................................................................................... 17
2
G. Parking Areas ................................................................................................................ 17
H. Roads and Driveways ................................................................................................... 18
I. Signs ............................................................................................................................. 20
J. Storm Water Runoff .................................................................................................... 20
K. Septic Waste Disposal ................................................................................................. 21
L. Essential Services ........................................................................................................ 21
M. Mineral Exploration and Extraction ............................................................................... 22
N. Agriculture ..................................................................................................................... 23
O. Timber Harvesting ........................................................................................................ 23
P. Clearing or Removal of Vegetation for Activities Other than Timber Harvesting ........... 25
Q. Erosion and Sedimentation Control .............................................................................. 28
R. Soils .............................................................................................................................. 29
S. Water Quality ................................................................................................................ 29
T. Archaeological Site ....................................................................................................... 29
16. Administration ..................................................................................................................... 29
A. Administering Bodies and Agents ................................................................................. 29
B. Permits Required ........................................................................................................... 30
C. Permit Application ......................................................................................................... 30
D. Procedure for Administering Permits ........................................................................... 30
E. Special Exceptions ........................................................................................................ 31
F. Expiration of Permit ....................................................................................................... 32
G. Installation of Public Utility Service ............................................................................... 32
H. Appeals ......................................................................................................................... 32
J. Enforcement .................................................................................................................. 36
17. Definitions .......................................................................................................................... 37
Appendix A:
Alternative to 30% Expansion Rule pursuant to 38 M.R.S.A. section 439-A, subsection 4-A ... 46
Appendix B:
38 M.R.S.A section 437. Significant rivers segments identified ................................................ 48
1
New Sharon Shoreland Zoning Ordinance
1. Purposes. The purposes of this Ordinance are to further the maintenance of safe and
healthful conditions; to prevent and control water pollution; to protect fish spawning
grounds, aquatic life, bird and other wildlife habitat; to protect buildings and lands from
flooding and accelerated erosion; to protect archaeological and historic resources; to protect
freshwater wetlands; to control building sites, placement of structures and land uses; to
conserve shore cover, and visual as well as actual points of access to inland waters; to
conserve natural beauty and open space; and to anticipate and respond to the impacts of
development in shoreland areas.
2. Authority. This Ordinance has been prepared in accordance with the provisions of Title 38
sections 435-449 of the Maine Revised Statutes Annotated (M.R.S.A.).
3. Applicability. This Ordinance repeals and supersedes all previous Shoreland Ordinances
for the Municipality of New Sharon
This Ordinance applies to all land areas within 250 feet, horizontal distance, of the
-
normal high-water line of any great pond or river, or
-
upland edge of a freshwater wetland,
and all land areas within 75 feet, horizontal distance, of the normal high-water line of a
stream.
This Ordinance also applies to any structure built on, over or abutting a dock, wharf or pier,
or other structure extending or located below the normal high-water line of a water body or
within a wetland.
4. Effective Date
A. Effective Date of Ordinance and Ordinance Amendments. This Ordinance, which was
adopted by the municipal legislative body on March 3, 2007 shall not be effective unless
approved by the Commissioner of the Department of Environmental Protection. A certified
copy of the Ordinance, or Ordinance Amendment, attested and signed by the Municipal
Clerk, shall be forwarded to the Commissioner for approval. If the Commissioner fails to act
on this Ordinance or Ordinance Amendment, within forty-five (45) days of his/her receipt of
the Ordinance, or Ordinance Amendment, it shall be automatically approved.
Any application for a permit submitted to the municipality within the forty-five (45) day period
shall be governed by the terms of this Ordinance, or Ordinance Amendment, if the
Ordinance, or Ordinance Amendment, is approved by the Commissioner.
B. Repeal of Municipal Timber Harvesting Regulation. The municipal regulation of timber
harvesting activities is repealed on the statutory date established under 38 M.R.S.A. section
438-A(5), at which time the State of Maine Department of Conservation's Bureau of
Forestry shall administer timber harvesting standards in the shoreland zone. On the date
2
established under 38 M.R.S.A section 438-A(5), the following provisions of this Ordinance
are repealed:
-
Section 14. Table of Land Uses, Column 3 (Forest management activities except
for timber harvesting) and Column 4 (Timber harvesting);
-
Section 15(O) in its entirety; and
-
Section 17. Definitions, the definitions of "forest management activities" and
"residual basal area".
-
5. Availability. A certified copy of this Ordinance shall be filed with the Municipal Clerk and
shall be accessible to any member of the public. Copies shall be made available to the
public at reasonable cost at the expense of the person making the request. Notice of
availability of this Ordinance shall be posted.
6. Severability. Should any section or provision of this Ordinance be declared by the courts to
be invalid, such decision shall not invalidate any other section or provision of the Ordinance.
7. Conflicts with Other Ordinances. Whenever a provision of this Ordinance conflicts with or is
inconsistent with another provision of this Ordinance or of any other ordinance, regulation or
statute administered by the municipality, the more restrictive provision shall control.
8. Amendments. This Ordinance may be amended by majority vote of the legislative body.
Copies of amendments, attested and signed by the Municipal Clerk, shall be submitted to
the Commissioner of the Department of Environmental Protection following adoption by the
municipal legislative body and shall not be effective unless approved by the Commissioner.
If the Commissioner fails to act on any amendment within forty-five (45) days of his/her
receipt of the amendment, the amendment is automatically approved. Any application for a
permit submitted to the municipality within the forty-five (45) day period shall be governed
by the terms of the amendment, if such amendment is approved by the Commissioner.
9. Districts and Zoning Map
A. Official Shoreland Zoning Map. The areas to which this Ordinance is applicable are
hereby divided into the following districts as shown on the Official Shoreland Zoning
Map(s) which is (are) made a part of this Ordinance:
(1) Resource Protection
(2) Limited Residential
(3) Limited Commercial
(4) General Development I
(5) General Development II
(6) Stream Protection
B Scale of Map. The Official Shoreland Zoning Map shall be drawn at a scale of not less
than: 1 inch = 2000 feet. District boundaries shall be clearly delineated and a legend
indicating the symbols for each district shall be placed on the map.
C. Certification of Official Shoreland Zoning Map. The Official Shoreland Zoning Map shall
be certified by the attested signature of the Municipal Clerk and shall be located in the
3
municipal office. In the event the municipality does not have a municipal office, the
Municipal Clerk shall be the custodian of the map.
D. Changes to the Official Shoreland Zoning Map. If amendments, in accordance with
Section 8, are made in the district boundaries or other matter portrayed on the Official
Shoreland Zoning Map, such changes shall be made on the Official Shoreland Zoning
Map within thirty (30) days after the amendment has been approved by the
Commissioner of the Department of Environmental Protection.
10. Interpretation of District Boundaries. Unless otherwise set forth on the Official Shoreland
Zoning Map, district boundary lines are property lines, the centerlines of streets, roads and
rights of way, and the boundaries of the shoreland area as defined herein. Where
uncertainty exists as to the exact location of district boundary lines, the Board of Appeals
shall be the final authority as to location.
11. Land Use Requirements. Except as hereinafter specified, no building, structure or land
shall hereafter be used or occupied, and no building or structure or part thereof shall
hereafter be erected, constructed, expanded, moved, or altered and no new lot shall be
created except in conformity with all of the regulations herein specified for the district in
which it is located, unless a variance is granted.
12. Non-conformance.
A. Purpose. It is the intent of this Ordinance to promote land use conformities, except that
non-conforming conditions that existed before the effective date of this Ordinance or
amendments thereto shall be allowed to continue, subject to the requirements set forth
in Section 12. Except as otherwise provided in this Ordinance, a non-conforming
condition shall not be permitted to become more non-conforming.
B. General
(1) Transfer of Ownership. Non-conforming structures, lots, and uses may be
transferred, and the new owner may continue the non-conforming use or continue to
use the non-conforming structure or lot, subject to the provisions of this Ordinance.
(2) Repair and Maintenance. This Ordinance allows, without a permit, the normal
upkeep and maintenance of non-conforming uses and structures including repairs or
renovations that do not involve expansion of the non-conforming use or structure,
and such other changes in a non-conforming use or structure as federal, state, or
local building and safety codes may require.
NOTE: See Section 17 for the definitions of non-conforming structures, non-conforming uses
and non-conforming lots.
C. Non-conforming Structures
(1) Expansions. A non-conforming structure may be added to or expanded after
obtaining a permit from the same permitting authority as that for a new structure, if
such addition or expansion does not increase the non-conformity of the structure
and is in accordance with subparagraphs (a) and (b) below.
4
[Alternatively, a municipality may, by local ordinance, regulate expansions of non-
conforming structures in accordance with Appendix A, Alternative to 30% Expansion
Rule Pursuant to 38 M.R.S.A Section 439-A. In adopting the alternative provisions
contained in Appendix A, a municipality may choose not to include the "special
expansion allowance" provision contained in paragraphs (1-A), (1-B), and (1-C) of
Appendix A.]
(a) After January 1, 1989 if any portion of a structure is less than the required
setback from the normal high-water line of a water body or tributary stream or
the upland edge of a wetland, that portion of the structure shall not be expanded,
as measured in floor area or volume, by 30% or more, during the lifetime of the
structure. If a replacement structure conforms with the requirements of Section
12(C)(3), and is less than the required setback from a water body, tributary
stream or wetland, the replacement structure may not be expanded if the original
structure existing on January 1, 1989 had been expanded by 30% in floor area
and volume since that date.
(b) Whenever a new, enlarged, or replacement foundation is constructed under a
non-conforming structure, the structure and new foundation must be placed such
that the setback requirement is met to the greatest practical extent as
determined by the Planning Board or its designee, basing its decision on the
criteria specified in Section 12(C)(2) Relocation, below. If the completed
foundation does not extend beyond the exterior dimensions of the structure,
except for expansion in conformity with Section 12(C)(1)(a) above, and the
foundation does not cause the structure to be elevated by more than three (3)
additional feet, as measured from the uphill side of the structure (from original
ground level to the bottom of the first floor sill), it shall not be considered to be an
expansion of the structure.
(2) Relocation. A non-conforming structure may be relocated within the boundaries of
the parcel on which the structure is located provided that the site of relocation
conforms to all setback requirements to the greatest practical extent as determined
by the Planning Board or its designee, and provided that the applicant demonstrates
that the present subsurface sewage disposal system meets the requirements of
State law and the State of Maine Subsurface Wastewater Disposal Rules (Rules), or
that a new system can be installed in compliance with the law and said Rules. In no
case shall a structure be relocated in a manner that causes the structure to be more
non-conforming.
In determining whether the building relocation meets the setback to the greatest
practical extent, the Planning Board or its designee shall consider the size of the lot,
the slope of the land, the potential for soil erosion, the location of other structures on
the property and on adjacent properties, the location of the septic system and other
on-site soils suitable for septic systems, and the type and amount of vegetation to be
removed to accomplish the relocation. When it is necessary to remove vegetation
within the water or wetland setback area in order to relocate a structure, the
Planning Board shall require replanting of native vegetation to compensate for the
destroyed vegetation. In addition, the area from which the relocated structure was
removed must be replanted with vegetation. Replanting shall be required as follows:
5
(a) Trees removed in order to relocate a structure must be replanted with at least
one native tree, three (3) feet in height, for every tree removed. If more than five
trees are planted, no one species of tree shall make up more than 50% of the
number of trees planted. Replaced trees must be planted no further from the
water or wetland than the trees that were removed.
Other woody and herbaceous vegetation, and ground cover, that are removed or
destroyed in order to relocate a structure must be re-established. An area at
least the same size as the area where vegetation and/or ground cover was
disturbed, damaged, or removed must be reestablished within the setback area.
The vegetation and/or ground cover must consist of similar native vegetation
and/or ground cover that was disturbed, destroyed or removed.
(b) Where feasible, when a structure is relocated on a parcel the original location of
the structure shall be replanted with vegetation which may consist of grasses,
shrubs, trees, or a combination thereof.
(3) Reconstruction or Replacement. Any non-conforming structure which is located less
than the required setback from a water body, tributary stream, or wetland and which
is removed, or damaged or destroyed, regardless of the cause, by more than 50% of
the market value of the structure before such damage, destruction or removal, may
be reconstructed or replaced provided that a permit is obtained within eighteen (18)
months of the date of said damage, destruction, or removal, and provided that such
reconstruction or replacement is in compliance with the water body, tributary stream
or wetland setback requirement to the greatest practical extent as determined by the
Planning Board or its designee in accordance with the purposes of this Ordinance.
In no case shall a structure be reconstructed or replaced so as to increase its non-
conformity. If the reconstructed or replacement structure is less than the required
setback it shall not be any larger than the original structure, except as allowed
pursuant to Section 12(C)(1) above, as determined by the non-conforming floor area
and volume of the reconstructed or replaced structure at its new location. If the total
amount of floor area and volume of the original structure can be relocated or
reconstructed beyond the required setback area, no portion of the relocated or
reconstructed structure shall be replaced or constructed at less than the setback
requirement for a new structure. When it is necessary to remove vegetation in order
to replace or reconstruct a structure, vegetation shall be replanted in accordance
with Section 12(C)(2) above.
Any non-conforming structure which is located less than the required setback from a
water body, tributary stream, or wetland and which is removed by 50% or less of the
market value, or damaged or destroyed by 50% or less of the market value of the
structure, excluding normal maintenance and repair, may be reconstructed in place if
a permit is obtained from the Code Enforcement Officer within one year of such
damage, destruction, or removal.
In determining whether the building reconstruction or replacement meets the
setback to the greatest practical extent the Planning Board or its designee shall
consider, in addition to the criteria in Section 12(C)(2) above, the physical condition
and type of foundation present, if any.
6
(4) Change of Use of a Non-conforming Structure. The use of a non-conforming
structure may not be changed to another use unless the Planning Board, after
receiving a written application, determines that the new use will have no greater
adverse impact on the water body, tributary stream, or wetland, or on the subject or
adjacent properties and resources than the existing use.
In determining that no greater adverse impact will occur, the Planning Board shall
require written documentation from the applicant, regarding the probable effects on
public health and safety, erosion and sedimentation, water quality, fish and wildlife
habitat, vegetative cover, visual and actual points of public access to waters, natural
beauty, floodplain management, archaeological and historic resources, and
functionally water-dependent uses.
D. Non-conforming Uses
(1) Expansions. Expansions of non-conforming uses are prohibited, except that non-
conforming residential uses may, after obtaining a permit from the Planning Board,
be expanded within existing residential structures or within expansions of such
structures as allowed in Section 12(C)(1)(a) above.
(2) Resumption Prohibited. A lot, building or structure in or on which a non-conforming
use is discontinued for a period exceeding one year, or which is superseded by a
conforming use, may not again be devoted to a non-conforming use except that the
Planning Board may, for good cause shown by the applicant, grant up to a one year
extension to that time period. This provision shall not apply to the resumption of a
use of a residential structure provided that the structure has been used or
maintained for residential purposes during the preceding five (5) year period.
(3) Change of Use. An existing non-conforming use may be changed to another non-
conforming use provided that the proposed use has no greater adverse impact on
the subject and adjacent properties and resources than the former use, as
determined by the Planning Board. The determination of no greater adverse impact
shall be made according to criteria listed in Section 12(C)(4) above.
E. Non-conforming Lots
(1) Non-conforming Lots: A non-conforming lot of record as of the effective date of this
Ordinance or amendment thereto may be built upon, without the need for a variance,
provided that such lot is in separate ownership and not contiguous with any other lot
in the same ownership, and that all provisions of this Ordinance except lot area, lot
width and shore frontage can be met. Variances relating to setback or other
requirements not involving lot area, lot width or shore frontage shall be obtained by
action of the Board of Appeals.
(2) Contiguous Built Lots: If two or more contiguous lots or parcels are in a single or
joint ownership of record at the time of adoption of this Ordinance, if all or part of the
lots do not meet the dimensional requirements of this Ordinance, and if a principal
use or structure exists on each lot, the non-conforming lots may be conveyed
separately or together, provided that the State Minimum Lot Size Law (12 M.R.S.A.
7
sections 4807-A through 4807-D) and the State of Maine Subsurface Wastewater
Disposal Rules are complied with.
If two or more principal uses or structures existed on a single lot of record on the
effective date of this ordinance, each may be sold on a separate lot provided that the
above referenced law and rules are complied with. When such lots are divided each
lot thus created must be as conforming as possible to the dimensional requirements
of this Ordinance.
(3) Contiguous Lots - Vacant or Partially Built: If two or more contiguous lots or parcels
are in single or joint ownership of record at the time of or since adoption or
amendment of this Ordinance, if any of these lots do not individually meet the
dimensional requirements of this Ordinance or subsequent amendments, and if one
or more of the lots are vacant or contain no principal structure the lots shall be
combined to the extent necessary to meet the dimensional requirements.
This provision shall not apply to 2 or more contiguous lots, at least one of which is
non-conforming, owned by the same person or persons on the effective date of this
Ordinance and recorded in the registry of deeds if the lot is served by a public sewer
or can accommodate a subsurface sewage disposal system in conformance with the
State of Maine Subsurface Wastewater Disposal Rules; and
(a) Each lot contains at least 100 feet of shore frontage and at least 20,000 square
feet of lot area; or
(b) Any lots that do not meet the frontage and lot size requirements of Section
12(E)(3)(a) are reconfigured or combined so that each new lot contains at least
100 feet of shore frontage and 20,000 square feet of lot area.
13. Establishment of Districts
A. Resource Protection District. The Resource Protection District includes areas in which
development would adversely affect water quality, productive habitat, biological
ecosystems, or scenic and natural values. This district shall include the following areas
when they occur within the limits of the shoreland zone, exclusive of the Stream
Protection District, except that areas which are currently developed and areas which
meet the criteria for the Limited Commercial or General Development I Districts need
not be included within the Resource Protection District.
(1) Areas within 250 feet, horizontal distance, of the upland edge of freshwater
wetlands, and wetlands associated with great ponds and rivers, which are rated
"moderate" or "high" value waterfowl and wading bird habitat, including nesting and
feeding areas, by the Maine Department of Inland Fisheries and Wildlife (MDIF&W)
that are depicted on a Geographic Information System (GIS) data layer maintained
by either MDIF&W or the Department as of May 1, 2006. For the purposes of this
paragraph "wetlands associated with great ponds and rivers" shall mean areas
characterized by non-forested wetland vegetation and hydric soils that are
contiguous with a great pond or river, and have a surface elevation at or below the
8
water level of the great pond or river during the period of normal high water.
"Wetlands associated with great ponds or rivers" are considered to be part of that
great pond or river.
(2) Floodplains along rivers and floodplains along artificially formed great ponds along
rivers, defined by the 100 year floodplain as designated on the Federal Emergency
Management Agency's (FEMA) Flood Insurance Rate Maps or Flood Hazard
Boundary Maps, or the flood of record, or in the absence of these, by soil types
identified as recent floodplain soils.
(3) Areas of two or more contiguous acres with sustained slopes of 20% or greater.
(4) Areas of two (2) or more contiguous acres supporting wetland vegetation and hydric
soils, which are not part of a freshwater wetland as defined, and which are not
surficially connected to a water body during the period of normal high water.
NOTE: These areas usually consist of forested wetlands abutting water bodies and
non-forested wetlands.
(5) Land areas along rivers subject to severe bank erosion, undercutting, or river bed
movement.
B. Limited Residential District. The Limited Residential District includes those areas
suitable for residential and recreational development. It includes areas other than those
in the Resource Protection District, or Stream Protection District, and areas which are
used less intensively than those in the Limited Commercial District or the General
Development Districts.
C. Limited Commercial District. The Limited Commercial District includes areas of mixed,
light commercial and residential uses, exclusive of the Stream Protection District, which
should not be developed as intensively as the General Development Districts. This
district includes areas of two or more contiguous acres in size devoted to a mix of
residential and low intensity business and commercial uses. Industrial uses are
prohibited.
D. General Development I District. The General Development I District includes the
following types of existing, intensively developed areas:
(1) Areas of two or more contiguous acres devoted to commercial, industrial or intensive
recreational activities, or a mix of such activities, including but not limited to the
following:
(a) Areas devoted to manufacturing, fabricating or other industrial activities;
(b) Areas devoted to wholesaling, warehousing, retail trade and service activities, or
other commercial activities; and
(c) Areas devoted to intensive recreational development and activities, such as, but
not limited to amusement parks, race tracks and fairgrounds.
9
(2) Areas otherwise discernible as having patterns of intensive commercial, industrial or
recreational uses.
E. General Development II District. The General Development II District includes the same
types of areas as those listed for the General Development I District. The General
Development II District, however, shall be applied to newly established General
Development Districts where the pattern of development at the time of adoption is
undeveloped or not as intensively developed as that of the General Development I
District.
Portions of the General Development District I or II may also include residential
development. However, no area shall be designated as a General Development I or II
District based solely on residential use.
In areas adjacent to great ponds classified GPA and adjacent to rivers flowing to great
ponds classified GPA, the designation of an area as a General Development District
shall be based upon uses existing at the time of adoption of this Ordinance. There shall
be no newly established General Development Districts or expansions in area of existing
General Development Districts adjacent to great ponds classified GPA, and adjacent to
rivers that flow to great ponds classified GPA.
F. Stream Protection District. The Stream Protection District includes all land areas within
seventy-five (75) feet, horizontal distance, of the normal high-water line of a stream,
exclusive of those areas within two-hundred and fifty (250) feet, horizontal distance, of
the normal high-water line of a great pond, or river, or within two hundred and fifty (250)
feet, horizontal distance, of the upland edge of a freshwater wetland. Where a stream
and its associated shoreland area are located within two-hundred and fifty (250) feet,
horizontal distance, of the above water bodies or wetlands, that land area shall be
regulated under the terms of the shoreland district associated with that water body or
wetland.
14. Table of Land Uses. All land use activities, as indicated in Table 1, Land Uses in the
Shoreland Zone, shall conform with all of the applicable land use standards in Section 15.
The district designation for a particular site shall be determined from the Official Shoreland
Zoning Map.
Key to Table 1:
Yes - Allowed (no permit required but the use must comply with all applicable land use
standards.)
No -
Prohibited
PB -
Allowed with permit issued by the Planning Board.
CEO - Allowed with permit issued by the Code Enforcement Officer
LPI -
Allowed with permit issued by the Local Plumbing Inspector
10
Abbreviations:
RP -
Resource Protection
GD General Development I and General Development II
LR -
Limited Residential
LC -
Limited Commercial
SP -
Stream Protection
11
TABLE 1. LAND USES IN THE SHORELAND ZONE
LAND USES
DISTRICT
SP
RP
LR
LC
GD
1. Non-intensive recreational uses not requiring structures such as
hunting, fishing and hiking
yes
yes
yes
yes
yes
2. Motorized vehicular traffic on existing roads and trails
yes
yes
yes
yes
yes
3. Forest management activities except for timber harvesting
yes
yes
yes
yes
yes
4. Timber harvesting
yes
CEO
yes
yes
yes
5. Clearing or removal of vegetation for activities other than timber harvesting
CEO
CEO1
yes
yes
yes
6. Fire prevention activities
yes
yes
yes
yes
yes
7. Wildlife management practices
yes
yes
yes
yes
yes
8. Soil and water conservation practices
yes
yes
yes
yes
yes
9. Mineral exploration
no
yes2
yes2
yes2
yes2
10. Mineral extraction including sand and gravel extraction
no
PB3
PB
PB
PB
11. Surveying and resource analysis
yes
yes
yes
yes
yes
12. Emergency operations
yes
yes
yes
yes
yes
13. Agriculture
yes
PB
yes
yes
yes
14. Aquaculture
PB
PB
PB
yes
yes
15. Principal structures and uses
A. One and two family residential, including driveways
PB4
PB9
CEO
CEO
CEO
B. Multi-unit residential
no
no
PB
PB
PB
C. Commercial
no
no10
no10
PB
PB
D. Industrial
no
no
no
no
PB
E. Governmental and institutional
no
no
PB
PB
PB
F.Small non-residential facilities for educational, scientific, or nature
interpretation purposes
PB4
PB
CEO
CEO
CEO
16. Structures accessory to allowed uses
PB4
PB
CEO
CEO
yes
17.
Piers, docks, wharfs, bridges and other structures and uses extending over or
below the normal high-water line or within a wetland
a. Temporary
b. Permanent
CEO11
PB
CEO11
PB
CEO11
PB
CEO11
PB
CEO11
PB
18. Conversions of seasonal residences to year-round residences
LPI
LPI
LPI
LPI
LPI
19. Home occupations
PB
PB
PB
CEO
yes
20. Private sewage disposal systems for allowed uses
LPI
LPI
LPI
LPI
LPI
21. Essential services
PB6
PB6
PB
PB
PB
A. Roadside distribution lines (34.5kV and lower)
CEO6
CEO6
yes12
yes12
yes12
B. Non-roadside or cross-country distribution lines involving ten poles or less in the
shoreland zone
PB6
PB6
CEO
CEO
CEO
C. Non-roadside or cross-country distribution lines involving eleven or more poles in the
shoreland zone
PB6
PB6
PB
PB
PB
D. Other essential services
PB6
PB6
PB
PB
PB
22. Service drops, as defined, to allowed uses
yes
yes
yes
yes
yes
23. Public and private recreational areas involving minimal structural development
PB
PB
PB
CEO
CEO
24. Individual, private campsites
CEO
CEO
CEO
CEO
CEO
25. Campgrounds
no
no7
PB
PB
PB
26. Road construction
PB
no8
PB
PB
PB
27. Parking facilities
no
no7
PB
PB
PB
28. Marinas
PB
no
PB
PB
PB
29. Filling and earth moving of <10 cubic yards
CEO
CEO
yes
yes
yes
30. Filling and earth moving of >10 cubic yards
PB
PB
CEO
CEO
CEO
31. Signs
yes
yes
yes
yes
yes
32. Uses similar to allowed uses
CEO
CEO
CEO
CEO
CEO
33. Uses similar to uses requiring a CEO permit
CEO
CEO
CEO
CEO
CEO
34. Uses similar to uses requiring a PB permit
PB
PB
PB
PB
PB
1In RP not allowed within 75 feet horizontal distance, of the normal high-water line of great ponds, except to remove safety hazards.
2Requires permit from the Code Enforcement Officer if more than 100 square feet of surface area, in total, is disturbed.
3In RP not allowed in areas so designated because of wildlife value.
4Provided that a variance from the setback requirement is obtained from the Board of Appeals.
6See further restrictions in Section 15( L)(2).
7Except when area is zoned for resource protection due to floodplain criteria in which case a permit is required from the PB.
8Except as provided in Section 15(H)(4).
9Single family residential structures may be allowed by special exception only according to the provisions of Section 16(E), Special Exceptions. Two-
family residential structures are prohibited.
10Except for commercial uses otherwise listed in this Table, such as marinas and campgrounds, that are allowed in the respective district.
11Excluding bridges and other crossings not involving earthwork, in which case no permit is required.
12Permit not required, but must file a written "notice of intent to construct" with CEO.
NOTE: Item 17, in its entirety, should be deleted from Table 1 if a municipality elects not to regulate "piers, docks, wharfs, bridges and other structures and
uses extending over or below the normal high-water line or within a wetland".
12
NOTE: A person performing any of the following activities shall require a permit from the Department of Environmental Protection, pursuant to 38 M.R.S.A.
section 480-C, if the activity occurs in, on, over or adjacent to any freshwater wetland, great pond, river, stream or brook and operates in such a
manner that material or soil may be washed into them:
A.
Dredging, bulldozing, removing or displacing soil, sand, vegetation or other materials;
B.
Draining or otherwise dewatering;
C.
Filling, including adding sand or other material to a sand dune; or
D.
Any construction or alteration of any permanent structure.
15. Land Use Standards. All land use activities within the shoreland zone shall conform with the
following provisions, if applicable.
A. Minimum Lot Standards
Minimum Lot
Minimum
Area (sq. ft.)
Shore
Frontage (ft.)
(1)
(a) Residential per dwelling unit
40,000
200
(b) Governmental, Institutional, Commercial
or Industrial per principal structure
60,000
300
(c) Public and Private Recreational Facilities
40,000
200
(2) Land below the normal high-water line of a water body or upland edge of a wetland
and land beneath roads serving more than two (2) lots shall not be included toward
calculating minimum lot area.
(3) Lots located on opposite sides of a public or private road shall be considered each a
separate tract or parcel of land unless such road was established by the owner of land
on both sides thereof after September 22, 1971.
(4) The minimum width of any portion of any lot within one hundred (100) feet, horizontal
distance, of the normal high-water line of a water body or upland edge of a wetland
shall be equal to or greater than the shore frontage requirement for a lot with the
proposed use.
(5) If more than one residential dwelling unit, principal governmental, institutional,
commercial or industrial structure or use, or combination thereof, is constructed or
established on a single parcel, all dimensional requirements shall be met for each
additional dwelling unit, principal structure, or use.
B. Principal and Accessory Structures
(1) All new principal and accessory structures shall be set back at least one hundred
(100) feet, horizontal distance, from the normal high-water line of great ponds
classified GPA and rivers that flow to great ponds classified GPA, and seventy-five
(75) feet, horizontal distance, from the normal high-water line of other water bodies,
tributary streams, or the upland edge of a wetland, except that in the General
Development I District the setback from the normal high-water line shall be at least
twenty five (25) feet, horizontal distance. In the Resource Protection District the
13
setback requirement shall be 250 feet, horizontal distance, except for structures,
roads, parking spaces or other regulated objects specifically allowed in that district in
which case the setback requirements specified above shall apply.
In addition:
(a) The water body, tributary stream, or wetland setback provision shall neither apply
to structures which require direct access to the water body or wetland as an
operational necessity, such as piers, docks and retaining walls, nor to other
functionally water-dependent uses.
(b) All principal structures along Significant River Segments as listed in 38 M.R.S.A.
section 437 (see Appendix B), shall be set back a minimum of one hundred and
twenty-five (125) feet, horizontal distance, from the normal high-water line and
shall be screened from the river by existing vegetation. This provision does not
apply to structures related to hydropower facilities.
(c) On a non-conforming lot of record on which only a residential structure exists, and
it is not possible to place an accessory structure meeting the required water body,
tributary stream or wetland setbacks, the code enforcement officer may issue a
permit to place a single accessory structure, with no utilities, for the storage of
yard tools and similar equipment. Such accessory structure shall not exceed
eighty (80) square feet in area nor eight (8) feet in height, and shall be located as
far from the shoreline or tributary stream as practical and shall meet all other
applicable standards, including lot coverage and vegetation clearing limitations. In
no case shall the structure be located closer to the shoreline or tributary stream
than the principal structure.
(2) Principal or accessory structures and expansions of existing structures which are
permitted in the Resource Protection, Limited Residential, Limited Commercial, and
Stream Protection Districts, shall not exceed thirty-five (35) feet in height. This
provision shall not apply to structures such as transmission towers, windmills,
antennas, and similar structures having no floor area.
(3) The lowest floor elevation or openings of all buildings and structures, including
basements, shall be elevated at least one foot above the elevation of the 100 year
flood, the flood of record, or in the absence of these, the flood as defined by soil types
identified as recent flood-plain soils. In those municipalities that participate in the
National Flood Insurance Program and have adopted the April 2005 version, or later
version, of the Floodplain Management Ordinance, accessory structures may be
placed in accordance with the standards of that ordinance and need not meet the
elevation requirements of this paragraph.
(4) The total footprint area of all structures, parking lots and other non-vegetated
surfaces, within the shoreland zone shall not exceed twenty (20) percent of the lot or
a portion thereof, located within the shoreland zone, including land area previously
developed, except in the General Development District adjacent to rivers that do not
flow to great ponds classified GPA, where lot coverage shall not exceed seventy
(70) percent.
14
(5) Retaining walls that are not necessary for erosion control shall meet the structure
setback requirement, except for low retaining walls and associated fill provided all of
the following conditions are met:
(a) The site has been previously altered and an effective vegetated buffer does not
exist;
(b) The wall(s) is(are) at least 25 feet, horizontal distance, from the normal high-
water line of a water body, tributary stream, or upland edge of a wetland;
(c) The site where the retaining wall will be constructed is legally existing lawn or is
a site eroding from lack of naturally occurring vegetation, and which cannot be
stabilized with vegetative plantings;
(d) The total height of the wall(s), in the aggregate, are no more than 24 inches;
(e) Retaining walls are located outside of the 100-year floodplain on rivers, streams,
and tributary streams, as designated on the Federal Emergency Management
Agency's (FEMA) Flood Insurance Rate Maps or Flood Hazard Boundary Maps,
or the flood of record, or in the absence of these, by soil types identified as
recent flood plain soils.
(f) The area behind the wall is revegetated with grass, shrubs, trees, or a
combination thereof, and no further structural development will occur within the
setback area, including patios and decks; and
(g) A vegetated buffer area is established within 25 feet, horizontal distance, of the
normal high-water line of a water body, tributary stream, or upland edge of a
wetland when a natural buffer area does not exist. The buffer area must meet
the following characteristics:
(i)
The buffer must include shrubs and other woody and herbaceous
vegetation. Where natural ground cover is lacking the area must be
supplemented with leaf or bark mulch;
(ii) Vegetation plantings must be in quantities sufficient to retard erosion and
provide for effective infiltration of stormwater runoff;
(iii) Only native species may be used to establish the buffer area;
(iv) A minimum buffer width of 15 feet, horizontal distance, is required, measured
perpendicularly to the normal high-water line or upland edge of a wetland;
(v) A footpath not to exceed the standards in Section 15(P)(2)(a), may traverse
the buffer;
NOTE: If the wall and associated soil disturbance occurs within 75 feet, horizontal
distance, of a water body or tributary stream, a permit pursuant to the Natural
Resource Protection Act is required from the Department of Environmental
Protection.
15
(6) Notwithstanding the requirements stated above, stairways or similar structures may be
allowed with a permit from the Code Enforcement Officer, to provide shoreline access
in areas of steep slopes or unstable soils provided: that the structure is limited to a
maximum of four (4) feet in width; that the structure does not extend below or over the
normal high-water line of a water body or upland edge of a wetland, (unless permitted
by the Department of Environmental Protection pursuant to the Natural Resources
Protection Act, 38 M.R.S.A. section 480-C); and that the applicant demonstrates that
no reasonable access alternative exists on the property.
C. Piers, Docks, Wharves, Bridges and Other Structures and Uses Extending Over or Below
the Normal High-Water Line of a Water Body or Within a Wetland.
(1) Access from shore shall be developed on soils appropriate for such use and
constructed so as to control erosion.
(2) The location shall not interfere with existing developed or natural beach areas.
(3) The facility shall be located so as to minimize adverse effects on fisheries.
(4) The facility shall be no larger in dimension than necessary to carry on the activity and
be consistent with the surrounding character and uses of the area. A temporary pier,
dock or wharf shall not be wider than six feet for non-commercial uses.
(5) No new structure shall be built on, over or abutting a pier, wharf, dock or other
structure extending beyond the normal high-water line of a water body or within a
wetland unless the structure requires direct access to the water body or wetland as an
operational necessity.
(6) New permanent piers and docks shall not be permitted unless it is clearly
demonstrated to the Planning Board that a temporary pier or dock is not feasible, and
a permit has been obtained from the Department of Environmental Protection,
pursuant to the Natural Resources Protection Act.
(7) No existing structures built on, over or abutting a pier, dock, wharf or other structure
extending beyond the normal high-water line of a water body or within a wetland shall
be converted to residential dwelling units in any district.
(8) Except in the General Development Districts, structures built on, over or abutting a
pier, wharf, dock or other structure extending beyond the normal high-water line of a
water body or within a wetland shall not exceed twenty (20) feet in height above the
pier, wharf, dock or other structure.
NOTE:
New permanent structures, and expansions thereof, projecting into or over water
bodies shall require a permit from the Department of Environmental Protection
pursuant to the Natural Resources Protection Act, 38 M.R.S.A. section 480-C.
Permits may also be required from the Army Corps of Engineers if located in
navigable waters.
16
D. Campgrounds. Campgrounds shall conform to the minimum requirements imposed
under State licensing procedures and the following:
(1) Campgrounds shall contain a minimum of five thousand (5,000) square feet of land,
not including roads and driveways, for each site. Land supporting wetland
vegetation, and land below the normal high-water line of a water body shall not be
included in calculating land area per site.
(2) The areas intended for placement of a recreational vehicle, tent or shelter, and utility
and service buildings shall be set back a minimum of one hundred (100) feet,
horizontal distance, from the normal high-water line of a great pond classified GPA
or a river flowing to a great pond classified GPA, and seventy-five (75) feet,
horizontal distance, from the normal high-water line of other water bodies, tributary
streams, or the upland edge of a wetland.
E. Individual Private Campsites. Individual private campsites not associated with
campgrounds are allowed provided the following conditions are met:
(1) One campsite per lot existing on the effective date of this Ordinance, or thirty
thousand (30,000) square feet of lot area within the shoreland zone, whichever is
less, may be permitted.
(2) Campsite placement on any lot, including the area intended for a recreational vehicle
or tent platform, shall be set back one hundred (100) feet, horizontal distance, from
the normal high-water line of a great pond classified GPA or river flowing to a great
pond classified GPA, and seventy-five (75) feet, horizontal distance, from the normal
high-water line of other water bodies, tributary streams, or the upland edge of a
wetland.
(3) Only one recreational vehicle shall be allowed on a campsite. The recreational
vehicle shall not be located on any type of permanent foundation except for a gravel
pad, and no structure except a canopy shall be attached to the recreational vehicle.
(4) The clearing of vegetation for the siting of the recreational vehicle, tent or similar
shelter in a Resource Protection District shall be limited to one thousand (1000)
square feet.
(5) A written sewage disposal plan describing the proposed method and location of
sewage disposal shall be required for each campsite and shall be approved by the
Local Plumbing Inspector. Where disposal is off-site, written authorization from the
receiving facility or land owner is required.
(6) When a recreational vehicle, tent or similar shelter is placed on-site for more than
one hundred and twenty (120) days per year, all requirements for residential
structures shall be met, including the installation of a subsurface sewage disposal
system in compliance with the State of Maine Subsurface Wastewater Disposal
Rules unless served by public sewage facilities.
17
F. Commercial and Industrial Uses. The following new commercial and industrial uses are
prohibited within the shoreland zone adjacent to great ponds classified GPA, and rivers
and streams which flow to great ponds classified GPA:
(1) Auto washing facilities
(2) Auto or other vehicle service and/or repair operations, including body shops
(3) Chemical and bacteriological laboratories
(4) Storage of chemicals, including herbicides, pesticides or fertilizers, other than
amounts normally associated with individual households or farms
(5) Commercial painting, wood preserving, and furniture stripping
(6) Dry cleaning establishments
(7) Electronic circuit assembly
(8) Laundromats, unless connected to a sanitary sewer
(9) Metal plating, finishing, or polishing
(10)
Petroleum or petroleum product storage and/or sale except storage on same
property as use occurs and except for storage and sales associated with marinas
(11)
Photographic processing
(12)
Printing
G. Parking Areas
(1) Parking areas shall meet the shoreline and tributary stream setback requirements
for structures for the district in which such areas are located. The setback
requirement for parking areas serving public boat launching facilities in Districts
other than the General Development I District shall be no less than fifty (50) feet,
horizontal distance, from the shoreline or tributary stream if the Planning Board finds
that no other reasonable alternative exists further from the shoreline or tributary
stream.
(2) Parking areas shall be adequately sized for the proposed use and shall be designed
to prevent stormwater runoff from flowing directly into a water body, tributary stream
or wetland and where feasible, to retain all runoff on-site.
(3) In determining the appropriate size of proposed parking facilities, the following shall
apply:
(a) Typical parking space: Approximately ten (10) feet wide and twenty (20) feet long,
except that parking spaces for a vehicle and boat trailer shall be forty (40) feet
long.
18
(b) Internal travel aisles: Approximately twenty (20) feet wide.
H. Roads and Driveways. The following standards shall apply to the construction of roads
and/or driveways and drainage systems, culverts and other related features.
(1) Roads and driveways shall be set back at least one-hundred (100) feet, horizontal
distance, from the normal high-water line of a great pond classified GPA or a river that
flows to a great pond classified GPA, and seventy-five (75) feet, horizontal distance
from the normal high-water line of other water bodies, tributary streams, or the upland
edge of a wetland unless no reasonable alternative exists as determined by the
Planning Board. If no other reasonable alternative exists, the road and/or driveway
setback requirement shall be no less than fifty (50) feet, horizontal distance, upon
clear showing by the applicant that appropriate techniques will be used to prevent
sedimentation of the water body, tributary stream, or wetland. Such techniques may
include, but are not limited to, the installation of settling basins, and/or the effective
use of additional ditch relief culverts and turnouts placed so as to avoid sedimentation
of the water body, tributary stream, or wetland.
On slopes of greater than twenty (20) percent the road and/or driveway setback shall
be increased by ten (10) feet, horizontal distance, for each five (5) percent increase in
slope above twenty (20) percent.
Section 15 (H)(1) does not apply to approaches to water crossings or to roads or
driveways that provide access to permitted structures and facilities located nearer to
the shoreline or tributary stream due to an operational necessity, excluding temporary
docks for recreational uses. Roads and driveways providing access to permitted
structures within the setback area shall comply fully with the requirements of Section
15(H)(1) except for that portion of the road or driveway necessary for direct access to
the structure.
(2) Existing public roads may be expanded within the legal road right of way regardless of
their setback from a water body, tributary stream or wetland.
(3) New permanent roads are not allowed within the shoreland zone along Significant
River Segments except:
(a) To provide access to structures or facilities within the zone; or
(b) When the applicant demonstrates that no reasonable alternative route exists
outside the shoreland zone. When roads must be located within the shoreland
zone they shall be set back as far as practicable from the normal high-water line
and screened from the river by existing vegetation.
(4) New roads and driveways are prohibited in a Resource Protection District except that
the Planning Board may grant a permit to construct a road or driveway to provide
access to permitted uses within the district. A road or driveway may also be approved
by the Planning Board in a Resource Protection District, upon a finding that no
reasonable alternative route or location is available outside the district. When a road
or driveway is permitted in a Resource Protection District the road and/or driveway
19
shall be set back as far as practicable from the normal high-water line of a water body,
tributary stream, or upland edge of a wetland.
(5) Road and driveway banks shall be no steeper than a slope of two (2) horizontal to one
(1) vertical, and shall be graded and stabilized in accordance with the provisions for
erosion and sedimentation control contained in Section 15(Q).
(6) Road and driveway grades shall be no greater than ten (10) percent except for
segments of less than two hundred (200) feet.
(7) In order to prevent road and driveway surface drainage from directly entering water
bodies, tributary streams or wetlands, roads and driveways shall be designed,
constructed, and maintained to empty onto an unscarified buffer strip at least (50)
feet plus two times the average slope, in width between the outflow point of the ditch
or culvert and the normal high-water line of a water body, tributary stream, or upland
edge of a wetland. Surface drainage which is directed to an unscarified buffer strip
shall be diffused or spread out to promote infiltration of the runoff and to minimize
channelized flow of the drainage through the buffer strip.
(8) Ditch relief (cross drainage) culverts, drainage dips and water turnouts shall be
installed in a manner effective in directing drainage onto unscarified buffer strips
before the flow gains sufficient volume or head to erode the road, driveway, or ditch.
To accomplish this, the following shall apply:
(a) Ditch relief culverts, drainage dips and associated water turnouts shall be spaced
along the road, or driveway at intervals no greater than indicated in the following
table:
Grade
Spacing
(Percent)
(Feet)
0-2
250
3-5
200-135
6-10
100-80
11-15
80-60
16-20
60-45
21 +
40
(b) Drainage dips may be used in place of ditch relief culverts only where the grade
is ten (10) percent or less.
(c) On sections having slopes greater than ten (10) percent, ditch relief culverts
shall be placed at approximately a thirty (30) degree angle downslope from a line
perpendicular to the centerline of the road or driveway.
20
(d) Ditch relief culverts shall be sufficiently sized and properly installed in order to
allow for effective functioning, and their inlet and outlet ends shall be stabilized
with appropriate materials.
(9) Ditches, culverts, bridges, dips, water turnouts and other storm water runoff control
installations associated with roads and driveways shall be maintained on a regular
basis to assure effective functioning.
I
Signs.
The following provisions shall govern the use of signs in the Resource
Protection, Stream Protection, Limited Residential and Limited Commercial Districts:
(1) Signs relating to goods and services sold on the premises shall be allowed, provided
that such signs shall not exceed six (6) square feet in area and shall not exceed two
(2) signs per premises. In the Limited Commercial District, however, such signs
shall not exceed sixteen (16) square feet in area. Signs relating to goods or
services not sold or rendered on the premises shall be prohibited.
(2) Name signs are allowed, provided such signs shall not exceed two (2) signs per
premises, and shall not exceed twelve (12) square feet in the aggregate.
(3) Residential users may display a single sign not over three (3) square feet in area
relating to the sale, rental, or lease of the premises.
(4) Signs relating to trespassing and hunting shall be allowed without restriction as to
number provided that no such sign shall exceed two (2) square feet in area.
(5) Signs relating to public safety shall be allowed without restriction.
(6) No sign shall extend higher than twenty (20) feet above the ground.
(7) Signs may be illuminated only by shielded, non-flashing lights.
J. Storm Water Runoff
(1) All new construction and development shall be designed to minimize storm water
runoff from the site in excess of the natural predevelopment conditions. Where
possible, existing natural runoff control features, such as berms, swales, terraces
and wooded areas, shall be retained in order to reduce runoff and encourage
infiltration of stormwaters.
(2) Storm water runoff control systems shall be maintained as necessary to ensure
proper functioning.
NOTE: The Stormwater Management Law (38 M.R.S.A. section 420-D) requires a full
permit to be obtained from the DEP prior to construction of a project consisting
of 20,000 square feet or more of impervious area or 5 acres or more of a
developed area in an urban impaired stream watershed or most-at-risk lake
watershed, or a project with 1 acre or more of developed area in any other
stream, coastal or wetland watershed. A permit-by-rule is necessary for a
project with one acre or more of disturbed area but less than 1 acre impervious
21
area (20,000 square feet for most-at-risk lakes and urban impaired streams) and
less than 5 acres of developed area. Furthermore, a Maine Construction
General Permit is required if the construction will result in one acre or more of
disturbed area.
K. Septic Waste Disposal
(1) All subsurface sewage disposal systems shall be installed in conformance with the
State of Maine Subsurface Wastewater Disposal Rules, and the following:
a)
clearing or removal of woody vegetation necessary to site a new system and any
associated fill extensions, shall not extend closer than seventy-five (75) feet,
horizontal distance, from the normal high-water line of a water body or the upland
edge of a wetland and b) a holding tank is not allowed for a first-time residential use
in the shoreland zone.
NOTE: The Maine Subsurface Wastewater Disposal Rules require new systems, excluding
fill extensions, to be constructed no less than one hundred (100) horizontal feet from
the normal high-water line of a perennial water body. The minimum setback
distance for a new subsurface disposal system may not be reduced by variance.
L. Essential Services
(1) Where feasible, the installation of essential services shall be limited to existing public
ways and existing service corridors.
(2) The installation of essential services, other than road-side distribution lines, is not
allowed in a Resource Protection or Stream Protection District, except to provide
services to a permitted use within said district, or except where the applicant
demonstrates that no reasonable alternative exists. Where allowed, such structures
and facilities shall be located so as to minimize any adverse impacts on surrounding
uses and resources, including visual impacts.
(3) Damaged or destroyed public utility transmission and distribution lines, towers and
related equipment may be replaced or reconstructed without a permit.
M. Mineral Exploration and Extraction. Mineral exploration to determine the nature or
extent of mineral resources shall be accomplished by hand sampling, test boring, or
other methods which create minimal disturbance of less than one hundred (100) square
feet of ground surface. A permit from the Code Enforcement Officer shall be required
for mineral exploration which exceeds the above limitation. All excavations, including
test pits and holes, shall be immediately capped, filled or secured by other equally
effective measures to restore disturbed areas and to protect the public health and
safety.
Mineral extraction may be permitted under the following conditions:
22
(1) A reclamation plan shall be filed with, and approved, by the Planning Board before a
permit is granted. Such plan shall describe in detail procedures to be undertaken to
fulfill the requirements of Section 15 (M)(4) below.
(2) No part of any extraction operation, including drainage and runoff control features,
shall be permitted within one hundred (100) feet, horizontal distance, of the normal
high-water line of a great pond classified GPA or a river flowing to a great pond
classified GPA, and within seventy-five (75) feet, horizontal distance, of the normal
high-water line of any other water body, tributary stream, or the upland edge of a
wetland. Extraction operations shall not be permitted within fifty (50) feet, horizontal
distance, of any property line without written permission of the owner of such
adjacent property.
(3) Developers of new gravel pits along Significant River Segments shall demonstrate
that no reasonable mining site outside the shoreland zone exists. When gravel pits
must be located within the zone, they shall be set back as far as practicable from the
normal high-water line and no less than seventy-five (75) feet and screened from the
river by existing vegetation.
(4) Within twelve (12) months following the completion of extraction operations at any
extraction site, which operations shall be deemed complete when less than one
hundred (100) cubic yards of materials are removed in any consecutive twelve (12)
month period, ground levels and grades shall be established in accordance with the
following:
(a) All debris, stumps, and similar material shall be removed for disposal in an
approved location, or shall be buried on-site. Only materials generated on-site
may be buried or covered on-site.
NOTE: The State of Maine Solid Waste Laws, 38 M.R.S.A., section 1301 and the solid
waste management rules, Chapters 400-419 of the Department of Environmental
Protection's regulations may contain other applicable provisions regarding disposal
of such materials.
(b) The final graded slope shall be two and one-half to one (2 1/2:1) slope or flatter.
(c) Top soil or loam shall be retained to cover all disturbed land areas, which shall
be reseeded and stabilized with vegetation native to the area. Additional topsoil
or loam shall be obtained from off-site sources if necessary to complete the
stabilization project.
(5) In keeping with the purposes of this Ordinance, the Planning Board may impose
such conditions as are necessary to minimize the adverse impacts associated with
mineral extraction operations on surrounding uses and resources.
N. Agriculture
(1) All spreading of manure shall be accomplished in conformance with the Manure
Utilization Guidelines published by the Maine Department of Agriculture on
23
November 1, 2001, and the Nutrient Management Law (7 M.R.S.A. sections 4201-
4209).
(2) Manure shall not be stored or stockpiled within one hundred (100) feet, horizontal
distance, of a great pond classified GPA or a river flowing to a great pond classified
GPA, or within seventy-five (75) feet horizontal distance, of other water bodies,
tributary streams, or wetlands. All manure storage areas within the shoreland zone
must be constructed or modified such that the facility produces no discharge of
effluent or contaminated storm water.
(3) Agricultural activities involving tillage of soil greater than forty thousand (40,000)
square feet in surface area, within the shoreland zone shall require a Conservation
Plan to be filed with the Planning Board. Non-conformance with the provisions of
said plan shall be considered to be a violation of this Ordinance.
(4) There shall be no new tilling of soil within one-hundred (100) feet, horizontal
distance, of the normal high-water line of a great pond classified GPA; within
seventy-five (75) feet, horizontal distance, from other water bodies; nor within
twenty-five (25) feet, horizontal distance, of tributary streams and freshwater
wetlands. Operations in existence on the effective date of this ordinance and not in
conformance with this provision may be maintained.
(5) Newly established livestock grazing areas shall not be permitted within one hundred
(100) feet, horizontal distance, of the normal high-water line of a great pond
classified GPA; within seventy-five (75) feet, horizontal distance, of other water
bodies; nor within twenty-five (25) feet, horizontal distance, of tributary streams and
freshwater wetlands. Livestock grazing associated with ongoing farm activities, and
which are not in conformance with the above setback provisions may continue,
provided that such grazing is conducted in accordance with a Conservation Plan.
O. Timber Harvesting
(1) In a Resource Protection District abutting a great pond, timber harvesting shall be
limited to the following:
(a) Within the strip of land extending 75 feet, horizontal distance, inland from the
normal high-water line, timber harvesting may be conducted when the following
conditions are met:
(1) The ground is frozen;
(2) There is no resultant soil disturbance;
(3) The removal of trees is accomplished using a cable or boom and there is no
entry of tracked or wheeled vehicles into the 75-foot strip of land;
(4) There is no cutting of trees less than 6 inches in diameter; no more than 30%
of the trees 6 inches or more in diameter, measured at 4 ½ feet above
ground level, are cut in any 10-year period; and a well-distributed stand of
trees and other natural vegetation remains; and
(5) A licensed professional forester has marked the trees to be harvested prior
to a permit being issued by the municipality.
24
(b) Beyond the 75 foot strip referred to in Section 15(O)(1)(a) above, timber
harvesting is permitted in accordance with paragraph 2 below except that in no
case shall the average residual basal area of trees over 4 ½ inches in diameter
at 4 1/2 feet above ground level be reduced to less than 30 square feet per acre.
(2) Except in areas as described in Section 15(O)(1) above, timber harvesting shall
conform with the following provisions:
(a) Selective cutting of no more than forty (40) percent of the total volume of trees
four (4) inches or more in diameter measured at 4 1/2 feet above ground level on
any lot in any ten (10) year period is permitted. In addition:
(i) Within one-hundred (100) feet, horizontal distance, of the normal high-water
line of a great pond classified GPA or a river flowing to a great pond
classified GPA, and within seventy-five (75) feet, horizontal distance, of the
normal high-water line of other water bodies, tributary streams, or the upland
edge of a wetland, there shall be no clearcut openings and a well-distributed
stand of trees and other vegetation, including existing ground cover, shall be
maintained.
(ii) At distances greater than one-hundred (100) feet, horizontal distance, of a
great pond classified GPA or a river flowing to a great pond classified GPA,
and greater than seventy-five (75) feet, horizontal distance, of the normal
high-water line of other water bodies or the upland edge of a wetland,
harvesting operations shall not create single clearcut openings greater than
ten-thousand (10,000) square feet in the forest canopy. Where such
openings exceed five-thousand (5000) square feet they shall be at least one
hundred (100) feet, horizontal distance, apart. Such clearcut openings shall
be included in the calculation of total volume removal. Volume may be
considered to be equivalent to basal area.
(b) Timber harvesting operations exceeding the 40% limitation in Section
15(O)(2)(a) above, may be allowed by the planning board upon a clear showing,
including a forest management plan signed by a Maine licensed professional
forester, that such an exception is necessary for good forest management and
will be carried out in accordance with the purposes of this Ordinance. The
planning board shall notify the Commissioner of the Department of
Environmental Protection of each exception allowed, within fourteen (14) days of
the planning board's decision.
(c) No accumulation of slash shall be left within fifty (50) feet, horizontal distance, of
the normal high-water line of a water body. In all other areas slash shall either
be removed or disposed of in such a manner that it lies on the ground and no
part thereof extends more than four (4) feet above the ground. Any debris that
falls below the normal high-water line of a water body or tributary stream shall be
removed.
(d) Timber harvesting equipment shall not use stream channels as travel routes
except when:
25
(i) Surface waters are frozen; and
(ii) The activity will not result in any ground disturbance.
(e) All crossings of flowing water shall require a bridge or culvert, except in areas
with low banks and channel beds which are composed of gravel, rock or similar
hard surface which would not be eroded or otherwise damaged.
(f) Skid trail approaches to water crossings shall be located and designed so as to
prevent water runoff from directly entering the water body or tributary stream.
Upon completion of timber harvesting, temporary bridges and culverts shall be
removed and areas of exposed soil revegetated.
(g) Except for water crossings, skid trails and other sites where the operation of
machinery used in timber harvesting results in the exposure of mineral soil shall
be located such that an unscarified strip of vegetation of at least seventy-five
(75) feet, horizontal distance, in width for slopes up to ten (10) percent shall be
retained between the exposed mineral soil and the normal high-water line of a
water body or upland edge of a wetland. For each ten (10) percent increase in
slope, the unscarified strip shall be increased by twenty (20) feet, horizontal
distance. The provisions of this paragraph apply only to a face sloping toward
the water body or wetland, provided, however, that no portion of such exposed
mineral soil on a back face shall be closer than twenty five (25) feet, horizontal
distance, from the normal high-water line of a water body or upland edge of a
wetland.
P. Clearing or Removal of Vegetation for Activities Other Than Timber Harvesting
(1) In a Resource Protection District abutting a great pond, there shall be no cutting of
vegetation within the strip of land extending 75 feet, horizontal distance, inland from
the normal high-water line, except to remove safety hazards.
Elsewhere, in any Resource Protection District the cutting or removal of vegetation
shall be limited to that which is necessary for uses expressly authorized in that
district.
(2) Except in areas as described in Section P(1), above, and except to allow for the
development of permitted uses, within a strip of land extending one-hundred (100)
feet, horizontal distance, inland from the normal high-water line of a great pond
classified GPA or a river flowing to a great pond classified GPA, and seventy-five
(75) feet, horizontal distance, from any other water body, tributary stream, or the
upland edge of a wetland, a buffer strip of vegetation shall be preserved as follows:
(a) There shall be no cleared opening greater than 250 square feet in the forest
canopy (or other existing woody vegetation if a forested canopy is not present)
as measured from the outer limits of the tree or shrub crown. However, a
footpath not to exceed six (6) feet in width as measured between tree trunks
and/or shrub stems is allowed provided that a cleared line of sight to the water
through the buffer strip is not created.
26
(b) Selective cutting of trees within the buffer strip is allowed provided that a well-
distributed stand of trees and other natural vegetation is maintained. For the
purposes of Section 15(P)(2)(b) a "well-distributed stand of trees" adjacent to a
great pond classified GPA or a river or stream flowing to a great pond classified
GPA, shall be defined as maintaining a rating score of 24 or more in each 25-
foot by 50-foot rectangular (1250 square feet) area as determined by the
following rating system.
Diameter of Tree at 4-1/2 feet Above
Points
Ground Level (inches)
2 - < 4 in.
1
4 - <8 in.
2
8-< 12 in.
4
12 in. or greater
8
Adjacent to other water bodies, tributary streams, and wetlands, a "well-
distributed stand of trees" is defined as maintaining a minimum rating score of 16
per 25-foot by 50-foot rectangular area.
NOTE: As an example, adjacent to a great pond, if a 25-foot x 50-foot plot contains
four (4) trees between 2 and 4 inches in diameter, two trees between 4 and 8
inches in diameter, three trees between 8 and 12 inches in diameter, and two
trees over 12 inches in diameter, the rating score is:
(4x1)+(2x2) + (3x4) + (2x8) = 36 points
Thus, the 25-foot by 50-foot plot contains trees worth 36 points. Trees
totaling 12 points (36- 24 =12) may be removed from the plot provided that
no cleared openings are created.
The following shall govern in applying this point system:
(i) The 25-foot by 50-foot rectangular plots must be established where the
landowner or lessee proposes clearing within the required buffer;
(ii) Each successive plot must be adjacent to, but not overlap a previous plot;
(iii) Any plot not containing the required points must have no vegetation
removed except as otherwise allowed by this Ordinance;
(iv) Any plot containing the required points may have vegetation removed
down to the minimum points required or as otherwise allowed by is
Ordinance;
(v) Where conditions permit, no more than 50% of the points on any 25-foot
by 50-foot rectangular area may consist of trees greater than 12 inches in
diameter.
For the purposes of Section 15(P)(2)(b) "other natural vegetation" is defined as
retaining existing vegetation under three (3) feet in height and other ground
cover and retaining at least five (5) saplings less than two (2) inches in diameter
at four and one half (4 ½) feet above ground level for each 25-foot by 50-foot
rectangle area. If five saplings do not exist, no woody stems less than two (2)
27
inches in diameter can be removed until 5 saplings have been recruited into the
plot.
Notwithstanding the above provisions, no more than 40% of the total volume of
trees four (4) inches or more in diameter, measured at 4 1/2 feet above ground
level may be removed in any ten (10) year period.
(c) In order to protect water quality and wildlife habitat, existing vegetation under
three (3) feet in height and other ground cover, including leaf litter and the forest
duff layer, shall not be cut, covered, or removed, except to provide for a footpath
or other permitted uses as described in Section 15(P) paragraphs (2) and (2)(a)
above.
(d) Pruning of tree branches, on the bottom 1/3 of the tree is allowed.
(e) In order to maintain a buffer strip of vegetation, when the removal of storm-
damaged, diseased, unsafe, or dead trees results in the creation of cleared
openings, these openings shall be replanted with native tree species unless
existing new tree growth is present.
Section 15(P)(2) does not apply to those portions of public recreational facilities
adjacent to public swimming areas as long as cleared areas are limited to the
minimum area necessary.
(3) At distances greater than one hundred (100) feet, horizontal distance, from a great
pond classified GPA or a river flowing to a great pond classified GPA, and seventy-
five (75) feet, horizontal distance, from the normal high-water line of any other water
body, tributary stream, or the upland edge of a wetland, there shall be allowed on
any lot, in any ten (10) year period, selective cutting of not more than forty (40)
percent of the volume of trees four (4) inches or more in diameter, measured 4 1/2
feet above ground level. Tree removal in conjunction with the development of
permitted uses shall be included in the forty (40) percent calculation. For the
purposes of these standards volume may be considered to be equivalent to basal
area.
In no event shall cleared openings for any purpose, including but not limited to,
principal and accessory structures, driveways, lawns and sewage disposal areas,
exceed in the aggregate, 25% of the lot area within the shoreland zone or ten
thousand (10,000) square feet, whichever is greater, including land previously
cleared. This provision shall not apply to the General Development Districts.
(4) Legally existing nonconforming cleared openings may be maintained, but shall not
be enlarged, except as allowed by this Ordinance.
(5) Fields and other cleared openings which have reverted to primarily shrubs, trees, or
other woody vegetation shall be regulated under the provisions of Section 15(P).
Q. Erosion and Sedimentation Control
28
(1) All activities which involve filling, grading, excavation or other similar activities which
result in unstabilized soil conditions and which require a permit shall also require a
written soil erosion and sedimentation control plan. The plan shall be submitted to
the permitting authority for approval and shall include, where applicable, provisions
for:
(a) Mulching and revegetation of disturbed soil.
(b) Temporary runoff control features such as hay bales, silt fencing or diversion
ditches.
(c) Permanent stabilization structures such as retaining walls or rip-rap.
(2) In order to create the least potential for erosion, development shall be designed to fit
with the topography and soils of the site. Areas of steep slopes where high cuts and
fills may be required shall be avoided wherever possible, and natural contours shall
be followed as closely as possible.
(3) Erosion and sedimentation control measures shall apply to all aspects of the
proposed project involving land disturbance, and shall be in operation during all
stages of the activity. The amount of exposed soil at every phase of construction
shall be minimized to reduce the potential for erosion.
(4) Any exposed ground area shall be temporarily or permanently stabilized within one
(1) week from the time it was last actively worked, by use of riprap, sod, seed, and
mulch, or other effective measures. In all cases permanent stabilization shall occur
within nine (9) months of the initial date of exposure. In addition:
(a) Where mulch is used, it shall be applied at a rate of at least one (1) bale per five
hundred (500) square feet and shall be maintained until a catch of vegetation is
established.
(b) Anchoring the mulch with netting, peg and twine or other suitable method may be
required to maintain the mulch cover.
(c) Additional measures shall be taken where necessary in order to avoid siltation
into the water. Such measures may include the use of staked hay bales and/or
silt fences.
(5) Natural and man-made drainage ways and drainage outlets shall be protected from
erosion from water flowing through them. Drainageways shall be designed and
constructed in order to carry water from a twenty five (25) year storm or greater, and
shall be stabilized with vegetation or lined with riprap.
R. Soils. All land uses shall be located on soils in or upon which the proposed uses or
structures can be established or maintained without causing adverse environmental
impacts, including severe erosion, mass soil movement, improper drainage, and water
pollution, whether during or after construction. Proposed uses requiring subsurface
waste disposal, and commercial or industrial development and other similar intensive
land uses, shall require a soils report based on an on-site investigation and be prepared
29
by state-certified professionals. Certified persons may include Maine Certified Soil
Scientists, Maine Registered Professional Engineers, Maine State Certified Geologists
and other persons who have training and experience in the recognition and evaluation of
soil properties. The report shall be based upon the analysis of the characteristics of the
soil and surrounding land and water areas, maximum ground water elevation, presence
of ledge, drainage conditions, and other pertinent data which the evaluator deems
appropriate. The soils report shall include recommendations for a proposed use to
counteract soil limitations where they exist.
S. Water Quality. No activity shall deposit on or into the ground or discharge to the waters
of the State any pollutant that, by itself or in combination with other activities or
substances, will impair designated uses or the water classification of the water body,
tributary stream or wetland.
T. Archaeological Site. Any proposed land use activity involving structural development or
soil disturbance on or adjacent to sites listed on, or eligible to be listed on the National
Register of Historic Places, as determined by the permitting authority, shall be submitted
by the applicant to the Maine Historic Preservation Commission for review and
comment, at least twenty (20) days prior to action being taken by the permitting
authority. The permitting authority shall consider comments received from the
Commission prior to rendering a decision on the application.
16. Administration
A. Administering Bodies and Agents
(1) Code Enforcement Officer. A Code Enforcement Officer shall be appointed or
reappointed annually by July 1st.
(2) Board of Appeals. A Board of Appeals shall be created in accordance with the
provisions of 30-A M.R.S.A. section 2691.
(3) Planning Board. A Planning Board shall be created in accordance with the
provisions of State law.
B. Permits Required. After the effective date of this Ordinance no person shall, without
first obtaining a permit, engage in any activity or use of land or structure requiring a
permit in the district in which such activity or use would occur; or expand, change, or
replace an existing use or structure; or renew a discontinued nonconforming use. A
person who is issued a permit pursuant to this Ordinance shall have a copy of the permit
on site while the work authorized by the permit is performed.
(1) A permit is not required for the replacement of an existing road culvert as long as:
(a) The replacement culvert is not more than 25% longer than the culvert being
replaced;
(b) The replacement culvert is not longer than 75 feet; and
30
(c) Adequate erosion control measures are taken to prevent sedimentation of the
water, and the crossing does not block fish passage in the watercourse.
(2) A permit is not required for an archaeological excavation as long as the excavation
is conducted by an archaeologist listed on the State Historic Preservation Officer's
level 1 or level 2 approved list, and unreasonable erosion and sedimentation is
prevented by means of adequate and timely temporary and permanent stabilization
measures.
(3) Any permit required by this Ordinance shall be in addition to any other permit
required by other law or ordinance.
C. Permit Application
(1) Every applicant for a permit shall submit a written application, including a scaled site
plan, on a form provided by the municipality, to the appropriate official as indicated in
Section 14.
(2) All applications shall be signed by an owner or individual who can show evidence of
right, title or interest in the property or by an agent, representative, tenant, or
contractor of the owner with authorization from the owner to apply for a permit
hereunder, certifying that the information in the application is complete and correct.
(3) All applications shall be dated, and the Code Enforcement Officer or Planning Board,
as appropriate, shall note upon each application the date and time of its receipt.
(4) If the property is not served by a public sewer, a valid plumbing permit or a
completed application for a plumbing permit, including the site evaluation approved
by the Plumbing Inspector, shall be submitted whenever the nature of the proposed
structure or use would require the installation of a subsurface sewage disposal
system.
D. Procedure for Administering Permits. Within 35 days of the date of receiving a written
application, the Planning Board or Code Enforcement Officer, as indicated in Section 14,
shall notify the applicant in writing either that the application is a complete application,
or, if the application is incomplete, that specified additional material is needed to make
the application complete. The Planning Board or the Code Enforcement Officer, as
appropriate, shall approve, approve with conditions, or deny all permit applications in
writing within 35 days of receiving a completed application. However, if the Planning
Board has a waiting list of applications, a decision on the application shall occur within
35 days after the first available date on the Planning Board's agenda following receipt of
the completed application, or within 35 days of the public hearing, if the proposed use or
structure is found to be in conformance with the purposes and provisions of this
Ordinance.
The applicant shall have the burden of proving that the proposed land use activity is in
conformity with the purposes and provisions of this Ordinance.
31
After the submission of a complete application to the Planning Board, the Board shall
approve an application or approve it with conditions if it makes a positive finding based
on the information presented that the proposed use:
(1) Will maintain safe and healthful conditions;
(2) Will not result in water pollution, erosion, or sedimentation to surface waters;
(3) Will adequately provide for the disposal of all wastewater;
(4) Will not have an adverse impact on spawning grounds, fish, aquatic life, bird or other
wildlife habitat;
(5) Will conserve shore cover and visual, as well as actual, points of access to inland
waters;
(6) Will protect archaeological and historic resources as designated in the
comprehensive plan;
(7) Will avoid problems associated with floodplain development and use; and
(8) Is in conformance with the provisions of Section 15, Land Use Standards.
If a permit is either denied or approved with conditions, the reasons as well as
conditions shall be stated in writing. No approval shall be granted for an application
involving a structure if the structure would be located in an unapproved subdivision or
would violate any other local ordinance, or regulation or statute administered by the
municipality.
E. Special Exceptions. In addition to the criteria specified in Section 16(D) above,
excepting structure setback requirements, the Planning Board may approve a permit for
a single family residential structure in a Resource Protection District provided that the
applicant demonstrates that all of the following conditions are met:
(1) There is no location on the property, other than a location within the Resource
Protection District, where the structure can be built.
(2) The lot on which the structure is proposed is undeveloped and was established and
recorded in the registry of deeds of the county in which the lot is located before the
adoption of the Resource Protection District.
(3) All proposed buildings, sewage disposal systems and other improvements are:
(a) Located on natural ground slopes of less than 20%; and
(b) Located outside the floodway of the 100-year flood-plain along rivers and
artificially formed great ponds along rivers, based on detailed flood insurance
studies and as delineated on the Federal Emergency Management Agency's
Flood Boundary and Floodway Maps and Flood Insurance Rate Maps; all
buildings, including basements, are elevated at least one foot above the 100-
32
year flood-plain elevation; and the development is otherwise in compliance with
any applicable municipal flood-plain ordinance.
If the floodway is not shown on the Federal Emergency Management Agency
Maps, it is deemed to be 1/2 the width of the 100-year flood-plain.
(4) The total ground-floor area, including cantilevered or similar overhanging extensions,
of all principal and accessory structures is limited to a maximum of 1,500 square
feet. This limitation shall not be altered by variance.
(5) All structures, except functionally water-dependent structures, are set back from the
normal high-water line of a water body, tributary stream or upland edge of a wetland
to the greatest practical extent, but not less than 75 feet, horizontal distance. In
determining the greatest practical extent, the Planning Board shall consider the
depth of the lot, the slope of the land, the potential for soil erosion, the type and
amount of vegetation to be removed, the proposed building site's elevation in regard
to the flood-plain, and its proximity to moderate-value and high-value wetlands.
F. Expiration of Permit. Permits shall expire one year from the date of issuance if a
substantial start is not made in construction or in the use of the property during that period.
If a substantial start is made within one year of the issuance of the permit, the applicant
shall have one additional year to complete the project, at which time the permit shall expire.
G. Installation of Public Utility Service. A public utility, water district, sanitary district or any
utility company of any kind may not install services to any new structure located in the
shoreland zone unless written authorization attesting to the validity and currency of all
local permits required under this or any previous Ordinance has been issued by the
appropriate municipal officials or other written arrangements have been made between
the municipal officials and the utility.
H. Appeals
(1) Powers and Duties of the Board of Appeals. The Board of Appeals shall have the
following powers:
(a) Administrative Appeals: To hear and decide administrative appeals, on an
appellate basis, where it is alleged by an aggrieved party that there is an error in
any order, requirement, decision, or determination made by, or failure to act by,
the Planning Board in the administration of this Ordinance; and to hear and decide
administrative appeals on a de novo basis where it is alleged by an aggrieved
party that there is an error in any order, requirement, decision or determination
made by, or failure to act by, the Code Enforcement Officer in his or her review of
and action on a permit application under this Ordinance. Any order, requirement,
decision or determination made, or failure to act, in the enforcement of this
ordinance is not appealable to the Board of Appeals.
(b) Variance Appeals: To authorize variances upon appeal, within the limitations set
forth in this Ordinance.
(2) Variance Appeals. Variances may be granted only under the following conditions:
33
(a) Variances may be granted only from dimensional requirements including, but not
limited to, lot width, structure height, percent of lot coverage, and setback
requirements.
(b) Variances shall not be granted for establishment of any uses otherwise prohibited
by this Ordinance.
(c) The Board shall not grant a variance unless it finds that:
(i) The proposed structure or use would meet the provisions of Section 15 except
for the specific provision which has created the non-conformity and from which
relief is sought; and
(ii) The strict application of the terms of this Ordinance would result in undue
hardship. The term "undue hardship" shall mean:
a. That the land in question cannot yield a reasonable return unless a
variance is granted;
b. That the need for a variance is due to the unique circumstances of the
property and not to the general conditions in the neighborhood;
c. That the granting of a variance will not alter the essential character of the
locality; and
d. That the hardship is not the result of action taken by the applicant or a prior
owner.
(d) Notwithstanding Section 16(H)(2)(c)(ii) above, the Board of Appeals may grant a
variance to an owner of a residential dwelling for the purpose of making that
dwelling accessible to a person with a disability who resides in or regularly uses
the dwelling. The board shall restrict any variance granted under this subsection
solely to the installation of equipment or the construction of structures necessary
for access to or egress from the dwelling by the person with the disability. The
board may impose conditions on the variance, including limiting the variance to the
duration of the disability or to the time that the person with the disability lives in the
dwelling. The term "structures necessary for access to or egress from the
dwelling" shall include railing, wall or roof systems necessary for the safety or
effectiveness of the structure.
(e) The Board of Appeals shall limit any variances granted as strictly as possible in
order to ensure conformance with the purposes and provisions of this Ordinance to
the greatest extent possible, and in doing so may impose such conditions to a
variance as it deems necessary. The party receiving the variance shall comply
with any conditions imposed.
(f) A copy of each variance request, including the application and all supporting
information supplied by the applicant, shall be forwarded by the municipal officials
to the Commissioner of the Department of Environmental Protection at least
34
twenty (20) days prior to action by the Board of Appeals. Any comments received
from the Commissioner prior to the action by the Board of Appeals shall be made
part of the record and shall be taken into consideration by the Board of Appeals.
(3) Administrative Appeals
When the Board of Appeals reviews a decision of the Code Enforcement Officer the
Board of Appeals shall hold a "de novo" hearing. At this time the Board may receive
and consider new evidence and testimony, be it oral or written. When acting in a "de
novo" capacity the Board of Appeals shall hear and decide the matter afresh,
undertaking its own independent analysis of evidence and the law, and reaching its
own decision.
When the Board of Appeals hears a decision of the Planning Board, it shall hold an
appellate hearing, and may reverse the decision of the Planning Board only upon
finding that the decision was contrary to specific provisions of the Ordinance or
contrary to the facts presented to the Planning Board. The Board of Appeals may only
review the record of the proceedings before the Planning Board. The Board Appeals
shall not receive or consider any evidence which was not presented to the Planning
Board, but the Board of Appeals may receive and consider written or oral arguments.
If the Board of Appeals determines that the record of the Planning Board proceedings
are inadequate, the Board of Appeals may remand the matter to the Planning Board
for additional fact finding.
(4) Appeal Procedure
(a) Making an Appeal
(i) An administrative or variance appeal may be taken to the Board of Appeals by
an aggrieved party from any decision of the Code Enforcement Officer or the
Planning Board, except for enforcement-related matters as described in
Section 16(H)(1)(a) above. Such an appeal shall be taken within thirty (30)
days of the date of the official, written decision appealed from, and not
otherwise, except that the Board, upon a showing of good cause, may waive
the thirty (30) day requirement.
(ii) Applications for appeals shall be made by filing with the Board of Appeals a
written notice of appeal which includes:
a. A concise written statement indicating what relief is requested and why the
appeal or variance should be granted.
b. A sketch drawn to scale showing lot lines, location of existing buildings and
structures and other physical features of the lot pertinent to the relief
sought.
(iii) Upon receiving an application for an administrative appeal or a variance, the
Code Enforcement Officer or Planning Board, as appropriate, shall transmit to
the Board of Appeals all of the papers constituting the record of the decision
appealed from.
35
(iv) The Board of Appeals shall hold a public hearing on an administrative appeal
or a request for a variance within thirty-five (35) days of its receipt of a
complete written application, unless this time period is extended by the parties.
(b) Decision by Board of Appeals
(i) A majority of the full voting membership of the Board shall constitute a
quorum for the purpose of deciding an appeal.
(ii) The person filing the appeal shall have the burden of proof.
(iii) The Board shall decide all administrative appeals and variance appeals
within thirty five (35) days after the close of the hearing, and shall issue a
written decision on all appeals.
(iv) The Board of Appeals shall state the reasons and basis for its decision,
including a statement of the facts found and conclusions reached by the
Board. The Board shall cause written notice of its decision to be mailed or
hand-delivered to the applicant and to the Department of Environmental
Protection within seven (7) days of the Board's decision. Copies of written
decisions of the Board of Appeals shall be given to the Planning Board,
Code Enforcement Officer, and the municipal officers.
(5) Appeal to Superior Court. Except as provided by 30-A M.R.S.A. section 2691(3)(F),
any aggrieved party who participated as a party during the proceedings before the
Board of Appeals may take an appeal to Superior Court in accordance with State laws
within forty-five (45) days from the date of any decision of the Board of Appeals.
(6) Reconsideration. In accordance with 30-A M.R.S.A. section 2691(3)(F), the Board of
Appeals may reconsider any decision within forty-five (45) days of its prior decision. A
request to the Board to reconsider a decision must be filed within ten (10) days of the
decision that is being reconsidered. A vote to reconsider and the action taken on that
reconsideration must occur and be completed within forty-five (45) days of the date of
the vote on the original decision. Reconsideration of a decision shall require a positive
vote of the majority of the Board members originally voting on the decision, and proper
notification to the landowner, petitioner, planning board, code enforcement officer, and
other parties of interest, including abuttors and those who testified at the original
hearing(s). The Board may conduct additional hearings and receive additional
evidence and testimony.
Appeal of a reconsidered decision to Superior Court must be made within fifteen (15)
days after the decision on reconsideration.
J. Enforcement
(1) Nuisances. Any violation of this Ordinance shall be deemed to be a nuisance.
(2) Code Enforcement Officer
36
(a) It shall be the duty of the Code Enforcement Officer to enforce the provisions of
this Ordinance. If the Code Enforcement Officer shall find that any provision of
this Ordinance is being violated, he or she shall notify in writing the person
responsible for such violation, indicating the nature of the violation and ordering
the action necessary to correct it, including discontinuance of illegal use of land,
buildings or structures, or work being done, removal of illegal buildings or
structures, and abatement of nuisance conditions. A copy of such notices shall be
submitted to the municipal officers and be maintained as a permanent record.
(b) The Code Enforcement Officer shall conduct on-site inspections to insure
compliance with all applicable laws and conditions attached to permit approvals.
The Code Enforcement Officer shall also investigate all complaints of alleged
violations of this Ordinance.
(c) The Code Enforcement Officer shall keep a complete record of all essential
transactions of the office, including applications submitted, permits granted or
denied, variances granted or denied, revocation actions, revocation of permits,
appeals, court actions, violations investigated, violations found, and fees collected.
On a biennial basis, a summary of this record shall be submitted to the Director of
the Bureau of Land and Water Quality within the Department of Environmental
Protection.
(3) Legal Actions. When the above action does not result in the correction or abatement
of the violation or nuisance condition, the Municipal Officers, upon notice from the
Code Enforcement Officer, are hereby directed to institute any and all actions and
proceedings, either legal or equitable, including seeking injunctions of violations and
the imposition of fines, that may be appropriate or necessary to enforce the provisions
of this Ordinance in the name of the municipality. The municipal officers, or their
authorized agent, are hereby authorized to enter into administrative consent
agreements for the purpose of eliminating violations of this Ordinance and recovering
fines without Court action. Such agreements shall not allow an illegal structure or use
to continue unless there is clear and convincing evidence that the illegal structure or
use was constructed or conducted as a direct result of erroneous advice given by an
authorized municipal official and there is no evidence that the owner acted in bad faith,
or unless the removal of the structure or use will result in a threat or hazard to public
health and safety or will result in substantial environmental damage.
(4) Fines. Any person, including but not limited to a landowner, a landowner's agent or a
contractor, who violates any provision or requirement of this Ordinance shall be
penalized in accordance with 30-A, M.R.S.A. section 4452.
NOTE: Current penalties include fines of not less than $100 nor more than $2500 per
violation for each day that the violation continues. However, in a resource
protection district the maximum penalty is increased to $5000 (38 M.R.S.A. section
4452).
17. Definitions.
37
Accessory structure or use - a use or structure which is incidental and subordinate to the
principal use or structure. Accessory uses, when aggregated, shall not subordinate the
principal use of the lot. A deck or similar extension of the principal structure or a garage
attached to the principal structure by a roof or a common wall is considered part of the
principal structure.
Aggrieved party - an owner of land whose property is directly or indirectly affected by the
granting or denial of a permit or variance under this Ordinance; a person whose land abuts
land for which a permit or variance has been granted; or any other person or group of
persons who have suffered particularized injury as a result of the granting or denial of such
permit or variance.
Agriculture - the production, keeping or maintenance for sale or lease, of plants and/or
animals, including but not limited to: forages and sod crops; grains and seed crops; dairy
animals and dairy products; poultry and poultry products; livestock; fruits and vegetables; and
ornamental and green-house products. Agriculture does not include forest management and
timber harvesting activities.
Aquaculture - the growing or propagation of harvestable freshwater, estuarine, or marine
plant or animal species.
Basal Area - the area of cross-section of a tree stem at 4 1/2 feet above ground level and
inclusive of bark.
Basement - any portion of a structure with a floor-to-ceiling height of 6 feet or more and
having more than 50% of its volume below the existing ground level.
Boat Launching Facility - a facility designed primarily for the launching and landing of
watercraft, and which may include an access ramp, docking area, and parking spaces for
vehicles and trailers.
Campground - any area or tract of land to accommodate two (2) or more parties in temporary
living quarters, including, but not limited to tents, recreational vehicles or other shelters.
Canopy - the more or less continuous cover formed by tree crowns in a wooded area.
Commercial use - the use of lands, buildings, or structures, other than a "home occupation,"
defined below, the intent and result of which activity is the production of income from the
buying and selling of goods and/or services, exclusive of rental of residential buildings and/or
dwelling units.
DBH - the diameter of a standing tree measured 4.5 feet from ground level.
Development - a change in land use involving alteration of the land, water or vegetation, or
the addition or alteration of structures or other construction not naturally occurring.
Dimensional requirements - numerical standards relating to spatial relationships including but
not limited to setback, lot area, shore frontage and height.
38
Disability - any disability, infirmity, malformation, disfigurement, congenital defect or mental
condition caused by bodily injury, accident, disease, birth defect, environmental conditions or
illness; and also includes the physical or mental condition of a person which constitutes a
substantial handicap as determined by a physician or in the case of mental handicap, by a
psychiatrist or psychologist, as well as any other health or sensory impairment which
requires special education, vocational rehabilitation or related services.
Driveway - a vehicular access-way less than five hundred (500) feet in length serving two
single-family dwellings or one two-family dwelling, or less.
Emergency operations - operations conducted for the public health, safety or general
welfare, such as protection of resources from immediate destruction or loss, law
enforcement, and operations to rescue human beings, property and livestock from the threat
of destruction or injury.
Essential services - gas, electrical or communication facilities; steam, fuel, electric power or
water transmission or distribution lines, towers and related equipment; telephone cables or
lines, poles and related equipment; gas, oil, water, slurry or other similar pipelines; municipal
sewage lines, collection or supply systems; and associated storage tanks. Such systems
may include towers, poles, wires, mains, drains, pipes, conduits, cables, fire alarms and
police call boxes, traffic signals, hydrants and similar accessories, but shall not include
service drops or buildings which are necessary for the furnishing of such services.
Expansion of a structure - an increase in the floor area or volume of a structure, including all
extensions such as, but not limited to: attached decks, garages, porches and greenhouses.
Expansion of use - the addition of one or more months to a use's operating season; or the
use of more floor area or ground area devoted to a particular use.
Family - one or more persons occupying a premises and living as a single housekeeping
unit.
Floodway - the channel of a river or other watercourse and adjacent land areas that must be
reserved in order to discharge the 100-year flood without cumulatively increasing the water
surface elevation by more than one foot in height.
Floor area - the sum of the horizontal areas of the floor(s) of a structure enclosed by
exterior walls, plus the horizontal area of any unenclosed portions of a structure such as
porches and decks.
Forest management activities - timber cruising and other forest resource evaluation
activities, pesticide or fertilizer application, management planning activities, timber stand
improvement, pruning, regeneration of forest stands, and other similar or associated
activities, exclusive of timber harvesting and the construction, creation or maintenance of
roads.
Forested wetland - a freshwater wetland dominated by woody vegetation that is six (6)
meters tall (approximately twenty (20) feet) or taller.
39
Foundation - the supporting substructure of a building or other structure, excluding wooden
sills and post supports, but including basements, slabs, frostwalls, or other base consisting
of concrete, block, brick or similar material.
Freshwater wetland - freshwater swamps, marshes, bogs and similar areas, other than
forested wetlands, which are:
1.
Of ten or more contiguous acres; or of less than 10 contiguous acres and
adjacent to a surface water body, excluding any river, stream or brook, such that
in a natural state, the combined surface area is in excess of 10 acres; and
2.
Inundated or saturated by surface or ground water at a frequency and for a
duration sufficient to support, and which under normal circumstances do support,
a prevalence of wetland vegetation typically adapted for life in saturated soils.
Freshwater wetlands may contain small stream channels or inclusions of land that do not
conform to the criteria of this definition.
Functionally water-dependent uses - those uses that require, for their primary purpose,
location on submerged lands or that require direct access to, or location in, coastal or inland
waters and that can not be located away from these waters. The uses include, but are not
limited to commercial and recreational fishing and boating facilities, excluding recreational
boat storage buildings, finfish and shellfish processing, fish storage and retail and wholesale
fish marketing facilities, waterfront dock and port facilities, shipyards and boat building
facilities, marinas, navigation aids, basins and channels, retaining walls, industrial uses
dependent upon water-borne transportation or requiring large volumes of cooling or
processing water that can not reasonably be located or operated at an inland site, and uses
that primarily provide general public access to coastal or inland waters.
Great pond - any inland body of water which in a natural state has a surface area in excess
of ten acres, and any inland body of water artificially formed or increased which has a
surface area in excess of thirty (30) acres except for the purposes of this Ordinance, where
the artificially formed or increased inland body of water is completely surrounded by land
held by a single owner,
Great pond classified GPA - any great pond classified GPA, pursuant to 38 M.R.S.A. Article
4-A Section 465-A. This classification includes some, but not all impoundments of rivers
that are defined as great ponds.
Ground cover - small plants, fallen leaves, needles and twigs, and the partially decayed
organic matter of the forest floor.
Height of a structure - the vertical distance between the mean original (prior to construction)
grade at the downhill side of the structure and the highest point of the structure, excluding
chimneys, steeples, antennas, and similar appurtenances that have no floor area.
Home occupation - an occupation or profession which is customarily conducted on or in a
residential structure or property and which is 1) clearly incidental to and compatible with the
residential use of the property and surrounding residential uses; and 2) which employs no
more than two (2) persons other than family members residing in the home.
40
Increase in nonconformity of a structure - any change in a structure or property which
causes further deviation from the dimensional standard(s) creating the nonconformity such
as, but not limited to, reduction in water body, tributary stream or wetland setback distance,
increase in lot coverage, or increase in height of a structure. Property changes or structure
expansions which either meet the dimensional standard or which cause no further increase
in the linear extent of nonconformance of the existing structure shall not be considered to
increase nonconformity. For example, there is no increase in nonconformity with the
setback requirement for water bodies, wetlands, or tributary streams if the expansion
extends no further into the required setback area than does any portion of the existing
nonconforming structure. Hence, a structure may be expanded laterally provided that the
expansion extends no closer to the water body, tributary stream, or wetland than the closest
portion of the existing structure from that water body, tributary stream, or wetland. Included
in this allowance are expansions which in-fill irregularly shaped structures.
Individual private campsite - an area of land which is not associated with a campground, but
which is developed for repeated camping by only one group not to exceed ten (10)
individuals and which involves site improvements which may include but not be limited to a
gravel pad, parking area, fire place, or tent platform.
Industrial - The assembling, fabrication, finishing, manufacturing, packaging or processing
of goods, or the extraction of minerals.
Institutional - a non-profit or quasi-public use, or institution such as a church, library, public
or private school, hospital, or municipally owned or operated building, structure or land used
for public purposes.
Lot area - The area of land enclosed within the boundary lines of a lot, minus land below the
normal high-water line of a water body or upland edge of a wetland and areas beneath
roads serving more than two lots.
Marina - a business establishment having frontage on navigable water and, as its principal
use, providing for hire offshore moorings or docking facilities for boats, and which may also
provide accessory services such as boat and related sales, boat repair and construction,
indoor and outdoor storage of boats and marine equipment, bait and tackle shops and
marine fuel service facilities.
Market value - the estimated price a property will bring in the open market and under
prevailing market conditions in a sale between a willing seller and a willing buyer, both
conversant with the property and with prevailing general price levels.
Mineral exploration - hand sampling, test boring, or other methods of determining the nature
or extent of mineral resources which create minimal disturbance to the land and which
include reasonable measures to restore the land to its original condition.
Mineral extraction - any operation within any twelve (12) month period which removes more
than one hundred (100) cubic yards of soil, topsoil, loam, sand, gravel, clay, rock, peat, or
other like material from its natural location and to transport the product removed, away from
the extraction site.
41
Minimum lot width - the closest distance between the side lot lines of a lot. When only two
lot lines extend into the shoreland zone, both lot lines shall be considered to be side lot
lines.
Multi-unit residential - a residential structure containing three (3) or more residential dwelling
units.
Native - indigenous to the local forests.
Non-conforming condition - non-conforming lot, structure or use which is allowed solely
because it was in lawful existence at the time this Ordinance or subsequent amendment
took effect.
Non-conforming lot - a single lot of record which, at the effective date of adoption or
amendment of this Ordinance, does not meet the area, frontage, or width requirements of
the district in which it is located.
Non-conforming structure - a structure which does not meet any one or more of the
following dimensional requirements; setback, height, or lot coverage, but which is allowed
solely because it was in lawful existence at the time this Ordinance or subsequent
amendments took effect.
Non-conforming use - use of buildings, structures, premises, land or parts thereof which is
not allowed in the district in which it is situated, but which is allowed to remain solely
because it was in lawful existence at the time this Ordinance or subsequent amendments
took effect.
Normal high-water line - that line which is apparent from visible markings, changes in the
character of soils due to prolonged action of the water or changes in vegetation, and which
distinguishes between predominantly aquatic and predominantly terrestrial land. Areas
contiguous with rivers and great ponds that support non-forested wetland vegetation and
hydric soils and that are at the same or lower elevation as the water level of the river or
great pond during the period of normal high-water are considered part of the river or great
pond.
Person - an individual, corporation, governmental agency, municipality, trust, estate,
partnership, association, two or more individuals having a joint or common interest, or other
legal entity.
Piers, docks, wharves, bridges and other structures and uses extending over or beyond the
normal high-water line or within a wetland.
Temporary:
Structures which remain in or over the water for less than seven (7)
months in any period of twelve (12) consecutive months.
Permanent:
Structures which remain in or over the water for seven (7) months or
more in any period of twelve (12) consecutive months.
Principal structure - a building other than one which is used for purposes wholly incidental or
accessory to the use of another building or use on the same premises.
42
Principal use - a use other than one which is wholly incidental or accessory to another use
on the same premises.
Public facility - any facility, including, but not limited to, buildings, property, recreation areas,
and roads, which are owned, leased, or otherwise operated, or funded by a governmental
body or public entity.
Recent floodplain soils - the following soil series as described and identified by the National
Cooperative Soil Survey:
Fryeburg
Hadley
Limerick
Lovewell
Medomak
Ondawa
Alluvial Cornish
Charles
Podunk
Rumney
Saco
Suncook
Sunday
Winooski
Recreational facility - a place designed and equipped for the conduct of sports, leisure time
activities, and other customary and usual recreational activities, excluding boat launching
facilities.
Recreational vehicle - a vehicle or an attachment to a vehicle designed to be towed, and
designed for temporary sleeping or living quarters for one or more persons, and which may
include a pick-up camper, travel trailer, tent trailer, camp trailer, and motor home. In order
to be considered as a vehicle and not as a structure, the unit must remain with its tires on
the ground, and must be registered with the State Division of Motor Vehicles.
Replacement system - a system intended to replace: 1.) an existing system which is either
malfunctioning or being upgraded with no significant change of design flow or use of the
structure, or 2.) any existing overboard wastewater discharge.
Residential dwelling unit - a room or group of rooms designed and equipped exclusively for
use as permanent, seasonal, or temporary living quarters for only one family at a time, and
containing cooking, sleeping and toilet facilities. The term shall include mobile homes and
rental units that contain cooking, sleeping, and toilet facilities regardless of the time-period
rented. Recreational vehicles are not residential dwelling units.
Residual basal area - the average of the basal area of trees remaining on a harvested site.
Riprap - rocks, irregularly shaped, and at least six (6) inches in diameter, used for erosion
control and soil stabilization, typically used on ground slopes of two (2) units horizontal to
one (1) unit vertical or less.
River - a free-flowing body of water including its associated floodplain wetlands from that
point at which it provides drainage for a watershed of twenty five (25) square miles to its
mouth.
Road - a route or track consisting of a bed of exposed mineral soil, gravel, asphalt, or other
surfacing material constructed for or created by the repeated passage of motorized
vehicles, excluding a driveway as defined.
43
Service drop - any utility line extension which does not cross or run beneath any portion of a
water body provided that:
1. in the case of electric service
a. the placement of wires and/or the installation of utility poles is located entirely upon
the premises of the customer requesting service or upon a roadway right-of-way;
and
b. the total length of the extension is less than one thousand (1,000) feet.
2. in the case of telephone service
a. the extension, regardless of length, will be made by the installation of telephone
wires to existing utility poles, or
b. the extension requiring the installation of new utility poles or placement underground
is less than one thousand (1,000) feet in length.
Setback - the nearest horizontal distance from the normal high-water line of a water body or
tributary stream, or upland edge of a wetland, to the nearest part of a structure, road,
parking space or other regulated object or area.
Shore frontage - the length of a lot bordering on a water body or wetland measured in a
straight line between the intersections of the lot lines with the shoreline.
Shoreland zone - the land area located within two hundred and fifty (250) feet, horizontal
distance, of the normal high-water line of any great pond or river; within 250 feet, horizontal
distance, of the upland edge of a freshwater wetland; or within seventy-five (75) feet,
horizontal distance, of the normal high-water line of a stream.
Shoreline - the normal high-water line, or upland edge of a freshwater wetland.
Significant River Segments - See Appendix B or 38 M.R.S.A. section 437.
Skid trail - a route repeatedly used by forwarding machinery or animal to haul or drag forest
products from the stump to the yard or landing, the construction of which requires minimal
excavation.
Slash - the residue, e.g., treetops and branches, left on the ground after a timber harvest.
Stream - a free-flowing body of water from the outlet of a great pond or the confluence of
two (2) perennial streams as depicted on the most recent edition of a United States
Geological Survey 7.5 minute series topographic map, or if not available, a 15-minute series
topographic map, to the point where the body of water becomes a river or flows to another
water body or wetland within the shoreland area.
Structure - anything built for the support, shelter or enclosure of persons, animals, goods or
property of any kind, together with anything constructed or erected with a fixed location on
or in the ground, exclusive of fences, and poles, wiring and other aerial equipment normally
44
associated with service drops as well as guying and guy anchors. The term includes
structures temporarily or permanently located, such as decks, patios, and satellite dishes.
Substantial start - completion of thirty (30) percent of a permitted structure or use measured
as a percentage of estimated total cost.
Subsurface sewage disposal system - any system designed to dispose of waste or waste
water on or beneath the surface of the earth; includes, but is not limited to: septic tanks;
disposal fields; grandfathered cesspools; holding tanks; pretreatment filter, piping, or any
other fixture, mechanism, or apparatus used for those purposes; does not include any
discharge system licensed under 38 M.R.S.A. section 414, any surface waste water
disposal system, or any municipal or quasi-municipal sewer or waste water treatment
system..
Sustained slope - a change in elevation where the referenced percent grade is substantially
maintained or exceeded throughout the measured area.
Timber harvesting - the cutting and removal of timber for the primary purpose of selling or
processing forest products. The cutting or removal of trees in the shoreland zone on a lot
that has less than two (2) acres within the shoreland zone shall not be considered timber
harvesting. Such cutting or removal of trees shall be regulated pursuant to Section 15 (P),
Clearing or Removal of Vegetation for Activities Other Than Timber Harvesting.
Tributary stream - means a channel between defined banks created by the action of
surface water, which is characterized by the lack of terrestrial vegetation or by the presence
of a bed, devoid of topsoil, containing waterborne deposits or exposed soil, parent material
or bedrock; and which is connected hydrologically with other water bodies. "Tributary
stream" does not include rills or gullies forming because of accelerated erosion in disturbed
soils where the natural vegetation cover has been removed by human activity.
This definition does not include the term "stream" as defined elsewhere in this Ordinance,
and only applies to that portion of the tributary stream located within the shoreland zone of
the receiving water body or wetland.
NOTE: Water setback requirements apply to tributary streams within the shoreland zone.
Upland edge of a wetland - the boundary between upland and wetland. For purposes of a
freshwater wetland, the upland edge is formed where the soils are not saturated for a
duration sufficient to support wetland vegetation; or where the soils support the growth of
wetland vegetation, but such vegetation is dominated by woody stems that are six (6)
meters (approximately twenty (20) foot) tall or taller.
Vegetation - all live trees, shrubs, and other plants including without limitation, trees both
over and under 4 inches in diameter, measured at 4 1/2 feet above ground level.
Volume of a structure - the volume of all portions of a structure enclosed by roof and fixed
exterior walls as measured from the exterior faces of these walls and roof.
Water body - any great pond, river or stream.
45
Water crossing - any project extending from one bank to the opposite bank of a river,
stream, tributary stream, or wetland whether under, through, or over the water or wetland.
Such projects include but may not be limited to roads, fords, bridges, culverts, water lines,
sewer lines, and cables as well as maintenance work on these crossings. This definition
includes crossings for timber harvesting equipment and related activities.
Wetland - a freshwater wetland.
Woody Vegetation - live trees or woody, non-herbaceous shrubs.
46
1.
Appendix A:
ALTERNATIVE TO 30% EXPANSION RULE PURSUANT TO 38 M.R.S.A. SECTION 439-A
SUBSECTION 4-A
Section 12.C. Non-conforming Structures
(1) Expansions. A non-conforming structure may be added to or expanded after obtaining a
permit from the same permitting authority as that for a new structure, if such addition or
expansion does not increase the non-conformity of the structure, and is in accordance
with subparagraphs (a), and (b) below.
(a)
Legally existing non-conforming principal and accessory structures that do not meet
the water body, tributary stream, or wetland setback requirements may be expanded
or altered as follows, as long as all other applicable standards contained in this
Ordinance are met.
i.
Expansion of any portion of a structure within 25 feet, horizontal distance, of the
normal high-water line of a water body, tributary stream, or upland edge of a
wetland is prohibited, even if the expansion will not increase nonconformity with
the water body, tributary stream or wetland setback requirement.
ii. Expansion of an accessory structure that is located closer to the normal high-
water line of a water body, tributary stream, or upland edge of a wetland than the
principal structure is prohibited, even if the expansion will not increase
nonconformity with the water body or wetland setback requirement.
iii. For structures located less than 75 feet, horizontal distance, from the normal
high-water line of a water body, tributary stream, or upland edge of a wetland,
the maximum combined total floor area for all portions of those structures within
that 75-foot distance is 1,000 square feet, and the maximum height of any
portion of a structure that is within 75 feet, horizontal distance, of a water body,
tributary stream or upland edge of a wetland is 20 feet or the height of the
existing structure, whichever is greater.
iv. For structures located less than 100 feet, horizontal distance, from the normal
high-water line of a great pond classified as GPA or a river flowing to a great
pond classified as GPA, the maximum combined total floor area for all portions
of those structures within that 100-foot distance is 1,500 square feet, and the
maximum height of any portion of a structure that is within 100 feet, horizontal
distance, of a great pond is 25 feet or the height of the existing structure,
whichever is greater, except that any portion of those structures located less
than 75 feet, horizontal distance from the normal high-water line of a water body,
tributary stream, or the upland edge of a wetland must meet the floor area and
height limits of division (iii).
For the purposes of Section 12(C)(1)(a), a basement is not counted toward floor
area.
47
(b) Whenever a new, enlarged, or replacement foundation is constructed under a non-
conforming structure, the structure and new foundation must be placed such that the
setback requirement is met to the greatest practical extent as determined by the
Planning Board or its designee, basing its decision on the criteria specified in Section
12(C)(2) Relocation, below. If the completed foundation does not extend beyond the
exterior dimensions of the structure and the foundation does not cause the structure to
be elevated by more than three (3) additional feet, as measured from the uphill side of
the structure, it shall not be considered to be an expansion of the structure.
48
APPENDIX B
38 §437. Significant river segments identified
For purposes of this chapter, significant river segments include the following:
1. Aroostook River. The Aroostook River from St. Croix Stream in Masardis to the Masardis and
T.10, R.6, W.E.L.S. townline, excluding segments in T.9, R.5, W.E.L.S.; including its tributary the Big
Machias River from the Aroostook River in Ashland to the Ashland and Garfield Plantation townlines;
2. Dennys River. The Dennys River from the railroad bridge in Dennysville Station to the dam at
Meddybemps Lake, excluding the western shore in Edmunds Township and No. 14 Plantation;
3. East Machias River. The East Machias River from 1/4 of a mile above the Route 1 bridge in East
Machias to the East Machias and T.18, E.D., B.P.P. townline, and from the T.19, E.D., B.P.P. and
Wesley townline to the outlet of Crawford Lake in Crawford, excluding Hadley Lake;
4. Fish River. The Fish River from the bridge in Fort Kent Mills to the outlet of Eagle Lake in
Wallagrass, and from the Portage Lake and T.14, R.6, townline to the Portage Lake and T.13, R.7,
W.E.L.S. townline, excluding Portage Lake;
5. Machias River. The Machias River from the Whitneyville and Machias townline to the Northfield
T.19, M.D., B.P.P. townline;
6. Mattawamkeag River. The Mattawamkeag River from the outlet of Mattakeunk Stream in Winn
to the Mattawamkeag and Kingman Township townline, and from the Reed Plantation and Bancroft
townline to the East Branch, including its tributaries the West Branch from the Mattawamkeag River to
the Haynesville T.3, R.3, W.E.L.S. townline and from its inlet into Upper Mattawamkeag Lake to the
Route 2 bridge; the East Branch from the Mattawamkeag River to the Haynesville and Forkstown
Township townline and from the T.4, R 3, W.E.L.S. and Oakfield townline to Red Bridge in Oakfield;
the Fish Stream from the Route 95 bridge in Island Falls to the Crystal-Patten townline; and the
Baskehegan Stream from its inlet into Crooked Brook Flowage in Danforth to the Danforth and
Brookton Township townline;
7. Narraguagus River. The Narraguagus River from the ice dam above the railroad bridge in
Cherryfield to the Beddington and Devereaux Township townline, excluding Beddington Lake;
8. East Branch of Penobscot. The East Branch of the Penobscot from the Route 157 bridge in
Medway to the East Millinocket and Grindstone Township townline;
9. Pleasant River. The Pleasant River from the railroad bridge in Columbia Falls to the Columbia
and T.18, M.D., B.P.P. townline, and from the T.24, M.D., B.P.P. and Beddington townline to the outlet
of Pleasant River Lake;
10. Rapid River. The Rapid River from the Magalloway Plantation and Upton townline to the outlet of
Pond in the River;
11. West Branch Pleasant River. The West Branch Pleasant River from the East Branch to the
Brownville and Williamsburg Township townline; and
12. West Branch of Union River. The West Branch of the Union River from the Route 9 bridge in
Amherst to the outlet of Great Pond in the Town of Great Pond.
49
STATUTORY AUTHORITY: 38 M.R.S.A. Section 438-A(5)
EFFECTIVE DATE: January 13, 1988 (Filed as 06-101, Ch. 1)
AMENDED:
March 24, 1990 (Filed as 06-096, Ch. 1000)
June 19, 1991 - Sections 15 and 17
July 14, 1992 - Sections 4, 8, 9, 12, 15, 16 & 17
August 7, 1994 - Sections 3, 14 & 16
EFFECTIVE DATE (ELECTRONIC CONVERSION): May 5, 1996
NON-SUBSTANTIVE CORRECTIONS:
December
29,
1997
-
minor
spelling
and
formatting.
April 1, 1998 - minor renumbering and formatting.
AMENDED:
February 6, 1999
February 13, 2000
May 1, 2006
50
SHORELAND ZONING ORDINANCE
Section 10
District Boundary Establishment for Resource Protection Zone
Lot No. ______________________________
Map No. _____________________________
Following an on-site inspection of the lot(s) listed above, the New Sharon Planning Board has established
the actual physical limits of the Resource Protection Zone. The ascertainment of this boundary is shown
on the accompanying map.
Planning board members participating in the on-site inspection and establishment of the Resource
Protection Zone:
___________________________________________
___________________________________________
___________________________________________
___________________________________________
___________________________________________
___________________________________________
___________________________________________
Date: __________________________________