Development charges & levies across Ontario
What development charges or levies apply to new construction? How much per new home?
212 of 444 municipalities in Ontario have an adopted bylaw on development charges & levies on file. Each row links the municipality's answer page and, where transcribed, the full text of the document.
| Municipality | Adopted document | Key facts | Verified |
|---|---|---|---|
| Adelaide Metcalfe Township |
Development Charges By-law No. 57 of 2022
adopted 2022-11-07 |
charge per single-detached home: Single and Semi-Detached Dwelling: $12,368 · charge per apartment unit: Apartments, 2 Bedrooms+: $7,807; Apartments - Bachelor and 1 Bedroom: $4,922 · non-residential charge: Non-residential: $3.00 per sq.ft of Gross Floor Area | 2026-10-19 |
| Adjala-Tosorontio Township |
Development Charges By-law No. 2026-027
+1 more adopted 2026-06-10 |
services covered: Fire Protection Services; Parks and Recreation; Police Services; Services Related to a Highway; Land Acquisition; Development-Related Studies · exemptions: Additional residential units; industrial enlargement <=50%; place of worship/cemetery; farm buildings; long-term care; affordable/non-profit housing; rental housing reductions. · payable: Calculated and payable under Act ss. 26, 26.1, 26.2; otherwise as of first building permit; agreements may defer. | 2026-10-23 |
| Ajax Town |
Development Charges & Fees (Town web page)
+2 more |
charge per single-detached home: $43,697 per unit (effective March 1, 2025) · charge per apartment unit: Apartments - 2 Bedrooms +: $23,774 per unit; Apartments - Bachelor and 1 Bedroom: $14,921 per unit (effective March 1, 2025) · non-residential charge: $11.35 per sq.ft. of gross floor area (effective March 1, 2025) | 2026-10-28 |
| Alfred and Plantagenet Township |
Development Charges (rates page)
+1 more |
charge per single-detached home: $7,554 per unit (2024) · charge per apartment unit: Apartments 2 bedrooms+: $4,827 per unit; Apartments Bachelor and 1 bedroom: $3,634 per unit (2024) · non-residential charge: Other non-residential: $3.43; farm building: $1.72 (2024 municipal-wide rates; unit of measure not stated on page) | 2026-10-26 |
| Alnwick/Haldimand Township |
Development Charges By-law No. 47-2023
adopted 2023-05-02 |
charge per single-detached home: Residential (all development types): $14,030.30/unit Township-wide; plus $11,125.34/unit Grafton Water Service special area (Schedule B maximum; phase-in 80-95% years 1-4) · charge per apartment unit: Residential (all development types): $14,030.30/unit Township-wide; plus $11,125.34/unit Grafton Water Service special area (Schedule B maximum; phase-in 80-95% years 1-4) · non-residential charge: Non-Residential (all development types): $54.47/m² Township-wide; plus $38.46/m² Grafton Water Service special area (Schedule B) | 2026-10-23 |
| Amaranth Township |
Development Charges Brochure - 2026
+1 more |
payable: No building permit issued until development charge paid in full. · indexing and expiry: Adjusted on January 1st of each year; By-Law 40-2024 will expire on August 8, 2034. | 2026-10-19 |
| Amherstburg Town |
Development Charges By-law No. 2024-085
+1 more adopted 2024-11-25 |
charge per single-detached home: $23,334 town-wide; $36,203 wastewater serviced areas (effective January 1, 2026) · charge per apartment unit: 2 Bedrooms+: $15,777 town-wide; $24,479 wastewater serviced. Bachelor and 1 Bedroom: $11,082 town-wide; $17,195 wastewater serviced (effective January 1, 2026) · non-residential charge: Gross Floor Area: $4.97/sq ft town-wide; $11.76/sq ft wastewater serviced. Wind turbines & telecom towers: $11,218. Solar farms: $2.95/sq ft (effective January 1, 2026) | 2026-10-19 |
| Arnprior Town |
Development Charges By-law No. 7369-23 (consolidated; as amended by 7538-24)
+1 more adopted 2023-03-13 |
charge per single-detached home: $28,490 per unit (Urban Area); $29,787 per unit (with Staye Court) · charge per apartment unit: $18,809 per unit (2+ bedrooms, Urban Area); $19,666 (with Staye Court); $12,876 per unit (Bachelor/1 bedroom, Urban Area); $13,462 (with Staye Court) · non-residential charge: $10.67 per sq.ft. (Urban Area); $12.24 per sq.ft. (with Staye Court) | 2026-10-19 |
| Ashfield–Colborne–Wawanosh Township |
Development Charges Brochure - January 2026
+2 more |
charge per single-detached home: Municipal Wide: $10,247 per unit (Jan 1–Dec 31, 2026); Saltford area-specific: $11,629 per unit (Jan 1–Dec 31, 2026) · charge per apartment unit: Municipal Wide: Rows, Apartment (2 bedroom+) & Other Multiples $7,137/unit; Apartment (1 bedroom/bachelor), mobile unit, park model trailer $5,980/unit (Jan 1–Dec 31, 2026). Saltford: $8,099 and $6,785 respectively. · non-residential charge: $2.29 per sq. ft (effective January 1, 2026) | 2026-10-19 |
| Aurora Town |
Development Charges By-law Number 6592-24
+3 more adopted 2024-03-26 |
services covered: Capital costs of facilities, services and matters required because of development or redevelopment · exemptions: Town/Local Board, school board, York Region; buildings <5 storeys or <10 units; long-term care, retirement, post-secondary, Legion, hospice, non-profit housing; affordable/attainable units reduced · payable: Prior to Building Permit issuance; for phased development, prior to first permit for each phase | 2026-10-26 |
| Aylmer Town |
2026 Development Charges Information Sheet (July-December 2026)
+2 more |
charge per single-detached home: $23,510 per unit (July 8, 2026 – December 31, 2026) · charge per apartment unit: Apartments - 2 Bedrooms+: $15,659 per unit; Apartments - Bachelor + 1 Bedroom: $8,674 per unit (July 8, 2026 – December 31, 2026) · non-residential charge: $5.83 per square foot of Gross Floor Area (2026, 100% of full charge) | 2026-10-19 |
| Barrie City |
Development Charges By-law No. 2023-074
+3 more adopted 2023-06-21 |
parkland dedication: Commercial/industrial: 2% of land; institutional: 5% of land; residential: 1 ha per 500 dwelling units or $6,390 per unit, whichever greater; alternative residential: 1 ha per 300 dwelling units; other: 5% of land. · services covered: parks or other public recreational purposes · exemptions: Additions with prior payment unless density/use changes; fire/accidental/act of God replacement; residential alterations no new units except second suite; replacement same units; City parkland inventory. | 2026-10-26 |
| Bayham Municipality |
By-law No. 2022-067, A By-law to Establish Development Charges for the Municipality of Bayham (water and wastewater, settlement areas)
+2 more adopted 2022-10-06 |
— | 2026-10-23 |
| Beckwith Township |
By-law Number 2024-29, With Respect to Development Charges Related to Fire Protection Services
+2 more adopted 2024-06-04 |
charge per single-detached home: $217 per single/semi unit, fire protection only (phase-in June 4, 2026–June 3, 2027; full rate $241 from June 4, 2028) · charge per apartment unit: 2+ bedrooms $113; bachelor/1 bedroom $81 per unit, fire protection only (phase-in June 4, 2026–June 3, 2027) · non-residential charge: $0.06 per sq.ft. of GFA, fire protection only (phase-in June 4, 2026–June 3, 2027; full calculated rate $0.13) | 2026-10-23 |
| Belleville City |
Development Charges (City of Belleville) | charge per single-detached home: $20,289 rural / $27,808 urban per unit (2026, effective Sept. 15, 2026); Stanley Park $4,340 per unit (2026, effective Jan. 1, 2026) · charge per apartment unit: Apartments (2+ Bedrooms): $15,332 rural / $21,014 urban per unit; Apartments (Bachelor & 1-Bedroom): $8,081 rural / $11,076 urban per unit (2026, effective Sept. 15, 2026) · non-residential charge: $6.44 rural / $9.84 urban per sq. ft of Gross Floor Area (2026, effective Sept. 15, 2026); Stanley Park $3.12 per sq. ft of Gross Floor Area (2026, effective Jan. 1, 2026) | 2026-10-19 |
| Blandford-Blenheim Township |
Township of Blandford-Blenheim Development Charge Information, By-laws 2436-2024 and 2440-2024 (rates effective June 13, 2026) | services covered: Roads & Related; Fire Services; Parks & Recreation; Growth Related Studies · exemptions: public hospital, a board of education, places of worship; Farm, private schools, temporary buildings, affordable housing, temporary dwellings, long-term care · indexing and expiry: Adjusted annually on June 13th per Statistics Canada Construction Price Statistics; in force until June 19, 2034 unless repealed sooner. | 2026-10-19 |
| Bluewater Municipality |
By-law Number 78-2025, Being a By-law to reduce development charges for The Corporation of the Municipality of Bluewater
+1 more adopted 2025-07-14 |
exemptions: Prevailing development charges under By-Law 86-2022 reduced by forty-five (45%) percent from date of this By-Law until earlier of this By-Law or By-Law 86-2022 repeal. · indexing and expiry: Indexing under s. 5 of By-Law 86-2022 not limited; reduction calculated after applicable annual indexing; reduction applies until earlier of this By-Law or By-Law 86-2022 repeal. · charge per single-detached home: Rural $1,986.60; Bayfield $18,668.65; Hensall $5,144.15; Zurich $15,681.05 (in effect July 15, 2025, By-law 78-2025) | 2026-10-23 |
| Bracebridge Town |
Development Charges (rates page)
+1 more |
charge per single-detached home: $10,389 per unit for Single Detached, Duplex and Semi Detached (Effective January 1, 2026) · charge per apartment unit: Apartments - 2 or More Bedrooms: $7,262 per unit; Apartments - 1 or Less Bedrooms: $5,569 per unit (Effective January 1, 2026) · non-residential charge: Commercial and Institutional: $7.91 per square metre (Effective January 1, 2026) | 2026-10-23 |
| Bradford West Gwillimbury Town |
Development Charge Rates effective January 1, 2026 | charge per single-detached home: $52,762 per unit Town-wide, plus urban services $24,109 (Bradford) or $69,572 (Bond Head/BWG) (Jan 1, 2026); totals $73,820 / $97,929 / $143,392 incl. Simcoe County & education · charge per apartment unit: 2+ bed $26,440 / bachelor-1 bed $18,128 Town-wide, plus urban services $12,230/$8,743 (Bradford) or $35,294/$25,209 (Bond Head/BWG) (Jan 1, 2026); County & education extra · non-residential charge: $13.45/ft² Town-wide, plus urban $16.51 (Bradford) or $13.59 (Bond Head/BWG) (Jan 1, 2026); totals $20.51 / $37.02 / $34.10 per ft² incl. Simcoe County & education | 2026-10-19 |
| Brampton City |
Current Development Charges - Residential (as of March 30, 2026)
+8 more |
charge per single-detached home: $69,420.07 per unit City of Brampton ($34,710.04 after 50% DCRP reduction), as of Mar 30, 2026; $120,366.58 total incl. Region of Peel and education (after reductions) · charge per apartment unit: City: large >750 sq ft $39,260.25, small ≤750 sq ft $24,160.73 per unit ($19,630.13 / $12,080.37 after 50% DCRP reduction), as of Mar 30, 2026; Region of Peel & education extra · services covered: Region of Peel hard and soft services; Peel and Dufferin-Peel school board education DCs | 2026-10-28 |
| Brant City |
Development Charges Bylaw Information Pamphlet (Nov 1, 2025)
+1 more |
charge per single-detached home: $62,155 per single/semi unit where urban water/wastewater/stormwater apply; $33,572 County-wide services only (Schedule B base rates, by-law effective Nov 1, 2024) · charge per apartment unit: 2+ bedrooms $42,768 / bachelor-1 bed $28,134 with urban services; $23,101 / $15,196 County-wide only (Schedule B base rates, Nov 1, 2024) · non-residential charge: $15.05 per sq.ft. GFA with urban services; $6.47 County-wide only (Schedule B base rates, Nov 1, 2024) | 2026-10-23 |
| Brantford City |
By-law 210-2021 - Development Charges (Municipal Code Chapter 261)
+1 more adopted 2021-10-26 |
charge per single-detached home: $37,814 city-wide; $55,579 Northern Settlement Expansion Area; $47,762 Tutela Heights per single/semi unit (2021 by-law base rates, indexed each Jan 1) · charge per apartment unit: Large >70 m² / small ≤70 m²: $19,843 / $16,526 city-wide; $29,165 / $24,290 Northern; $25,062 / $20,873 Tutela Heights (2021 base rates, indexed each Jan 1) · non-residential charge: $85.88/m² city-wide; $148.44/m² Northern Settlement Expansion Area; $138.70/m² Tutela Heights (2021 base rates, indexed each Jan 1) | 2026-10-19 |
| Brighton Municipality |
By-law No. 015-2025, Being a by-law for the imposition of Development Charges
+1 more adopted 2025-02-18 |
parkland dedication: Commercial/industrial: parkland dedication and/or equivalent Payment In Lieu equal to 2 percent of the Land Area · services covered: park or other public recreational purposes · exemptions: Additional residential units <300 m²; long-term care, Indigenous institutes, hospitals/hospice, registered charities, correctional, municipal, military/cultural, schools, industrial <1000 m², CIP exemptions | 2026-10-23 |
| Brock Township |
Development Charges - Township of Brock
+1 more |
charge per single-detached home: $33,521 per unit (Township of Brock, as of Jul 1, 2026); $117,283 urban / $73,521 rural total incl. Region of Durham and DDSB/DCDSB education DCs · charge per apartment unit: $16,028 per unit, 2+ bed and 1 bed (Township of Brock, as of Jul 1, 2026); urban total $67,883 (2+ bed) / $50,787 (1 bed) incl. Durham Region and education DCs · services covered: roads, fire services, public works buildings and fleet, administration, libraries, and parks and recreation | 2026-10-22 |
| Brockton Municipality |
Brockton Development Charges Information Pamphlet January 2026
+1 more |
charge per single-detached home: Municipal-wide: $4,811.95 per unit; Service Area 2A/2B: $24,705.82 per unit (January 2026 pamphlet) · charge per apartment unit: Municipal-wide: 2+ bedroom $2,869.66/unit; 1 bedroom/bachelor $2,350.75/unit. Service Area 2A/2B: 2+ bedroom $14,573.41/unit; 1 bedroom/bachelor $12,065.31/unit · non-residential charge: Non-Residential (municipal-wide): $1.88 per sq. ft; Development 2A and 2B: $10.99 per sq. ft | 2026-10-22 |
| Brockville City |
Development Charges By-law 083-2025 | charge per single-detached home: Single and Semi-Detached Dwelling: $11,142 (Urban Area); $4,393 (Rural Area) (2025$) · charge per apartment unit: Apartments - 2 Bedrooms +: $8,212 (Urban Area), $3,237 (Rural Area); Apartments - Bachelor and 1 Bedroom: $5,248 (Urban Area), $2,068 (Rural Area) (2025$) · non-residential charge: Non-residential per sq.ft. of Gross Floor Area: $7.97 (Urban Area); $2.54 (Rural Area) (2025$) | 2026-10-19 |
| Bruce County County |
By-law No. 2023-048, A By-law to establish Development Charges for the County of Bruce
+1 more adopted 2023-11-16 |
charge per single-detached home: $5,009.56 per unit (2026, 55% phase-in, Jan 1–Dec 31 2026) · charge per apartment unit: $3,159.21 per unit (2 bedrooms+); $2,126.13 per unit (studio and 1 bedroom) (2026, 55% phase-in) · non-residential charge: $1.95 per sq. ft. of Gross Floor Area (2026, 55% phase-in) | 2026-10-19 |
| Burlington City |
By-law 41-2024, Development Charges By-law for the City of Burlington
+3 more adopted 2024-05-21 |
charge per single-detached home: $20,595 per dwelling unit (Schedule A; by-law in force June 1, 2024; indexed annually April 1) · charge per apartment unit: Apartments - 2 Bedrooms +: $10,974 per dwelling unit; Apartments - Bachelor and 1 Bedroom: $8,298 per dwelling unit (Schedule A) · non-residential charge: $140.79 per sq.m of Gross Floor Area (Schedule A) | 2026-10-28 |
| Caledon Town |
By-law No. 2024-042, A by-law to impose and provide for the payment of development charges for municipal services in the Town of Caledon
+3 more adopted 2024-05-21 |
charge per single-detached home: $31,382 per unit, singles & semis (all Town services except roads, which are charged under separate By-law 2024-043) · charge per apartment unit: Apartments (>70m2) $21,576; small units (70m2 or less) $12,663 per unit (all Town services except roads; roads under By-law 2024-043) · non-residential charge: $34.87 per m2 (all Town services except roads; roads under By-law 2024-043) | 2026-10-28 |
| Cambridge City |
By-law 24-040, Development Charges (Fire Protection Services)
+8 more adopted 2024-04-30 |
services covered: Fire · exemptions: Municipal/boards, hospitals, additional dwelling units, industrial enlargement ≤50%, contaminated sites, temporary uses, heritage sites, farm buildings, home-based businesses, non-profit, affordable/attainable housing, rental housing discount. · payable: Payable upon first building permit; rental housing and institutional developments in six equal annual payments commencing on date of occupancy; agreements may provide earlier/later payment. | 2026-10-28 |
| Carleton Place Town |
Town of Carleton Place 2026 Development Charges (as of Jan 1, 2026) | charge per single-detached home: $41,210.05 urban / $23,616.93 rural per unit (Town of Carleton Place, Jan 1, 2026); $42,246.05 urban incl. Lanark County · charge per apartment unit: 2+ bed $23,500.21 urban / $13,467.84 rural; 1 bed $17,073.17 urban / $9,784.38 rural per unit (Town, Jan 1, 2026); urban incl. Lanark County $24,207.21 / $17,740.17 · non-residential charge: $18.70 urban / $7.67 rural per sq.ft. (Town, Jan 1, 2026); $19.23 urban incl. Lanark County | 2026-10-19 |
| Casselman Village |
Development Charge By-law 2021-057
+1 more adopted 2021-06-29 |
charge per single-detached home: $9454 per single/semi (roads, fire, parks, library, studies); water $3157 and sewage $11388 DCs extra under By-laws 2023-032/033 · charge per apartment unit: 2+ bed $5686; studio/1 bed $4276 (general services); water $1878/$1389 and sewage $6772/$5011 extra under By-laws 2023-032/033 · non-residential charge: $1.96 per sq.ft. GFA (general services); water $11.27 and sewage $38.37 per sq.m GFA extra under By-laws 2023-032/033 | 2026-10-26 |
| Cavan Monaghan Township |
Development Charges By-law No. 2026-47
+1 more adopted 2026-09-08 |
charge per single-detached home: $18,293 rural / $38,910 urban per single and semi-detached dwelling (effective Sept 9, 2026) · charge per apartment unit: Apartments - 2 Bedrooms +: $13,241 rural / $28,165 urban per unit; Apartments - Bachelor and 1 Bedroom: $7,612 rural / $16,189 urban per unit (effective Sept 9, 2026) · non-residential charge: Non-residential: $2.84/sq.ft. rural / $6.27/sq.ft. urban; industrial: 0% municipal-wide, 100% urban (Millbrook) services | 2026-10-19 |
| Central Elgin Municipality |
Development Charges By-law 2556
+1 more adopted 2021-01-25 |
services covered: Services Related to a Highway, Fire Protection, Parks and Recreation, Library, Growth Studies, Water, Wastewater. · exemptions: Board of education, municipality/local board, industrial uses, farm buildings, places of worship/cemeteries; residential enlargement/additional units; industrial enlargement up to 50%. · payable: Payable on building permit issuance; rental/institutional in 6 installments from occupancy; non-profit housing in 21 installments from occupancy. | 2026-10-23 |
| Centre Hastings Municipality |
Development Charges rates pamphlet 2026 (effective May 20, 2026)
+1 more |
charge per single-detached home: $27,039 per single & semi-detached unit urban; $12,369 rural (By-law 2026-42, Schedule B) · charge per apartment unit: $14,711 per apartment unit urban; $6,729 rural (By-law 2026-42, Schedule B) · non-residential charge: $193.13 per sq.m urban; $82.95 per sq.m rural (By-law 2026-42, Schedule C) | 2026-10-26 |
| Centre Wellington Township |
Annual Indexing of Development Charges, effective October 1, 2026
+1 more |
charge per single-detached home: Single-Detached & Semi-Detached: Rural $27,120; Urban $43,695 (effective October 1, 2026) · charge per apartment unit: Apartments 2 Bedrooms+: Rural $16,733; Urban $26,918. Bachelor & 1 Bedroom: Rural $12,985; Urban $20,911 (effective October 1, 2026) · non-residential charge: Rural: $6.86 per S-F. of Gross Floor Area; Urban: $13.81 per S-F. of Gross Floor Area (effective October 1, 2026) | 2026-10-22 |
| Chatham-Kent Municipality |
Development Charges By-law 149-2022 (revised, post-OLT settlement)
+3 more adopted 2022-08-08 |
services covered: Services Related to a Highway; Fire Protection; Policing; Parks and Recreation; Library; Ambulance; Waste Diversion; Growth Studies · exemptions: Places of worship, cemeteries, colleges/universities, industrial development, public hospitals, Children's Treatment Centre, airport, affordable/non-profit housing, farm buildings; rental housing 50+ units 50% reduction; industrial enlargement ≤50%. · payable: At building permit issuance; rental/institutional 6 instalments from occupancy; non-profit housing 21 instalments from occupancy. | 2026-10-28 |
| Clarence-Rockland City |
By-law 2025-93, A By-law with respect to Development Charges
+2 more adopted 2025-11-12 |
exemptions: Board of Education, City, Counties, place of worship, temporary buildings, affordable/non-profit/long-term care; additional dwelling units; rental housing reductions. · payable: Paid in full under ss. 26, 26.1, 26.2 of the Act or when building permit is issued; written agreement may permit later payment. · indexing and expiry: Adjusted annually as of Dec 31 commencing 2026 per Statistics Canada Construction Price Statistics; term 10 years from coming into force (Nov 12 2025). | 2026-10-19 |
| Clarington Municipality |
By-law 2025-070, a by-law to impose development charges against land in the Municipality of Clarington
+1 more |
services covered: Library Services; Emergency & Fire Protection Services; Parks and Indoor Recreation; Services Related to a Highway: Roads & Related and Operations; General Government; Land Acquisition · exemptions: Hospitals, municipal/regional/local boards, schools, colleges/universities; agricultural/agri-tourism; farm bunkhouses; places of worship; temporary buildings/sales offices; industrial/commercial expansions ≤50%; redevelopment/brownfield/heritage/relocation/cancelled-permit credits. · payable: Payable in full at first building permit; rental/institutional in 6 annual installments from occupancy; residential (excluding rental) at occupancy permit/first occupation; agreements may defer. | 2026-10-28 |
| Clearview Township |
By-law Number 24-43, Development Charges - Township Wide
+1 more adopted 2024-06-24 |
charge per single-detached home: Rural $17,138; Stayner $45,971; Stayner (Prepaid) $39,287; Creemore $60,148; New Lowell $26,475 per single/semi-detached dwelling (effective July 1, 2024) · charge per apartment unit: Apartments - 2 Bedrooms +: Rural $10,497; Stayner $28,158; Stayner (Prepaid) $24,064; Creemore $36,841; New Lowell $16,216. Apartments - Studio and 1 Bedroom: Rural $6,930; Stayner $18,590; Stayner (Prepaid) $15,887; Creemore $24,323; New Lowell $10,706 per apartment unit · non-residential charge: Rural $6.95; Stayner $22.68; Stayner (Prepaid) $18.78; Creemore $28.85; New Lowell $12.00 per sq.ft. of Gross Floor Area | 2026-10-23 |
| Cobourg Town |
2026 Town of Cobourg Development Charges rate schedule (Jan 1 - Dec 31, 2026)
+1 more |
charge per single-detached home: Existing urban area: $32,404 Town + $4,559 LUSI; Cobourg East: $44,368 Town + $7,056 LUSI (2026). All-in incl. Northumberland County: $40,479 / $54,940 · charge per apartment unit: Existing urban: 2+ bed $22,559 Town + $3,173 LUSI; 1 bed/bachelor $16,570 + $2,332 (2026). All-in incl. Northumberland County: $28,066 / $20,677 · non-residential charge: Commercial/institutional per sq.ft.: existing urban $14.15 Town + $2.92 LUSI ($19.02 incl. County); Cobourg East $21.48 + $2.94 ($26.38 incl. County); industrial exempt in existing urban | 2026-10-26 |
| Collingwood Town |
By-law No. 2024-050, Being a By-law to Establish Town-wide Development Charges
+1 more adopted 2024-07-08 |
charge per single-detached home: $70,421 per single/semi unit (sum of Schedule B service rates, 2024; excl. water treatment plant DC under By-law 2024-036) · charge per apartment unit: Apartment 2+ bed $41,911; 1 or fewer bed $26,192 per unit (sum of Schedule B service rates, 2024; excl. water treatment plant DC under By-law 2024-036) · non-residential charge: $278.81 per sq.m of GFA (sum of Schedule B service rates, 2024; excl. water treatment plant DC under By-law 2024-036) | 2026-10-19 |
| Cornwall City |
By-law 2020-112, Brookdale Avenue North - Area-Specific Development Charges By-law
+2 more adopted 2020-09-14 |
non-residential charge: $7.27 per sq.ft. of GFA (wastewater, Brookdale Avenue North corridor area-specific charge only; Schedule B, 2020) · services covered: wastewater services · exemptions: Industrial enlargement ≤50%; bona fide farm, places of worship, hospitals, college/university, manufacturing; City/board/County lands; corridor properties that paid Municipal Act wastewater extension charge; redevelopment credit. | 2026-10-28 |
| Cramahe Township |
Township of Cramahe Schedule of Development Charges (Schedule B to By-law 2018-35, as replaced by BL-2025-13), effective 2025 | charge per single-detached home: $14,638.34 per unit (Jan 1 2025 to Dec 31 2025) · charge per apartment unit: Multi-Unit Dwelling: $8,295.05 per unit; Townhouse Dwelling: $11,710.67 per unit (Jan 1 2025 to Dec 31 2025) · non-residential charge: $23.73 per sq. m. (Jan 1 2025 to Dec 31 2025) | 2026-10-22 |
| District Municipality of Muskoka Regional municipality |
District Municipality of Muskoka Development Charges By-law 2024-34
adopted 2024-10-21 |
services covered: Highway, ambulance, long-term care, waste diversion, transit, wastewater, water, septage services. · exemptions: Farm buildings, cemeteries, municipal/education/hospital/college/long-term care, non-profit, inclusionary zoning, affordable/attainable units; additional residential units; rental housing 15-25% reduction. · payable: Prior to building permit issuance; rental housing and institutional developments in 6 annual installments from occupancy; alternative timing by agreement. | 2026-10-19 |
| Douro-Dummer Township |
Douro-Dummer Development Charges web page (2026 rates)
+1 more |
charge per single-detached home: $7,216.00 per all dwelling units (2026) · non-residential charge: $5.28 per square foot (2026) · services covered: facilities and community centres, emergency services, roads and sewer infrastructure | 2026-10-19 |
| Drummond/North Elmsley Township |
Development Charges (rates page)
+1 more |
charge per single-detached home: $6,355 (Single & Semi Detached Dwelling) · charge per apartment unit: $3,578 (Apartments - 2 Bedrooms +); $2,597 (Apartments - Bachelor & 1 Bedroom) · non-residential charge: $2.49 per sq.ft. of Gross Floor Area (Non-Residential) | 2026-10-23 |
| Dufferin County County |
Development Charges By-law No. 2022-28 (County of Dufferin)
adopted 2022-07-14 |
charge per single-detached home: $5,056 per unit (effective August 24, 2022) · charge per apartment unit: $2,399 per unit (Apartments – 2 Bedrooms+); $1,733 per unit (Apartments – Bachelor and 1 Bedroom) (effective August 24, 2022) · non-residential charge: $0.86 per sq.ft. of gross floor area (effective August 24, 2022) | 2026-10-19 |
| Dutton/Dunwich Municipality |
2026 Development Charges (rates sheet)
+1 more |
charge per single-detached home: $9,465 per single and semi-detached dwelling · charge per apartment unit: Apartments - 2 bedrooms +: $5,901 per unit; Apartments - Studio and 1 bedroom: $3,472 per unit · non-residential charge: Services Related to a Highway: $4.31/sq.ft.; Fire Protection Services: $1.63/sq.ft.; Parks and Recreation Services: $0.41/sq.ft. of gross floor area | 2026-10-19 |
| East Garafraxa Township |
Development Charges 2026 pamphlet and rate schedule (effective January 1, 2026)
+1 more |
charge per single-detached home: $32,595.12 per single/semi-detached dwelling (Jan 1 2026) · charge per apartment unit: Apartments - 2 Bedrooms +: $17,984.26; Apartments - Bachelor and 1 Bedroom: $8,939.39 (Jan 1 2026) · non-residential charge: $10.95 per sq.ft. of gross floor area (Jan 1 2026) | 2026-10-26 |
| East Gwillimbury Town |
Development Charges Rate Schedule effective July 1, 2026
+2 more |
charge per single-detached home: $59,701 per unit (Town of East Gwillimbury, July 1, 2026); $153,353 total incl. York Region and school boards; plus Town Community Capital Contribution $7,528 · charge per apartment unit: ≥700 sq.ft.: $39,139; <700 sq.ft.: $28,614 per unit (Town, July 1, 2026); totals incl. York Region and school boards $106,794 / $74,750 · non-residential charge: Retail $15.54; non-retail $5.63 per sq.ft. GFA (Town of East Gwillimbury, July 1, 2026); totals incl. York Region and school boards $89.68 / $33.72 | 2026-10-23 |
| East Zorra-Tavistock Township |
Development Charges schedule (Township page)
+1 more |
charge per single-detached home: $17,772.00 per single and semi-detached dwelling (effective June 13, 2026) · charge per apartment unit: $10,145.00 per unit for Apartments - 2 Bedrooms Plus; $6,440.00 per unit for Apartments - Bachelor and 1 Bedroom (effective June 13, 2026) · non-residential charge: $47.06 per metre squared of Gross Floor Area; $8,111.00 per wind turbine (effective June 13, 2026) | 2026-10-23 |
| Erin Town |
Town of Erin By-law # 24-35, Development Charges
+3 more adopted 2024-07-18 |
parkland dedication: 2% of land (commercial/industrial); 5% of land (other); or 1 ha per 600 net residential units; cash-in-lieu higher of 5% appraised value or 1 ha per 1000 net residential units · services covered: Park or other public recreational purposes · exemptions: Non-profit housing; second units/garden suites; may consider public service, affordable housing/group homes, 50% commercial/industrial expansion, agricultural, temporary farm-help buildings | 2026-10-23 |
| Essa Township |
Essa 2026 Development Charges Pamphlet
+1 more |
charge per single-detached home: Township: $43,771 (Angus) / $34,227 (All Other Areas) per unit (Jan 1, 2026); County of Simcoe: $14,975 per unit (Jan 1, 2026) · charge per apartment unit: Township: Bachelor/1BR $18,819 (Angus) / $14,673 (All Other Areas); 2BR+ $25,737 (Angus) / $20,112 (All Other Areas) per unit (Jan 1, 2026); County of Simcoe: $8,029 per unit (Jan 1, 2026) · non-residential charge: Township: $173.93/sq. m. uniform; Angus total $225.48/sq. m. (incl. water/sewer) (Jan 1, 2026); County of Simcoe: $63.01/sq. m. (Jan 1, 2026); SCDSB: $0.75/sq. ft. + SMCDSB: $0.45/sq. ft. (Oct 30/25–Oct 29/26) | 2026-10-19 |
| Essex Town |
Development Charges By-law 2384 (Town of Essex)
+2 more adopted 2024-10-07 |
charge per single-detached home: Town-wide $19,971 per single/semi unit, plus ward wastewater: Ward 1 $1,136; Ward 2 $15,144; Ward 3 $7,137; Ward 4 $5,207 (Schedule B-1 as enacted Oct 8, 2024; indexed yearly from Jan 1, 2025) · charge per apartment unit: 2+ bedrooms: town-wide $12,172 (+ ward wastewater $692–$9,230); bachelor/1 bedroom: $8,403 (+ $478–$6,372) per unit (Schedule B-1 as enacted Oct 8, 2024) · non-residential charge: $0.62 per sq.ft. GFA town-wide, plus ward wastewater $0.48–$2.20 per sq.ft. (Schedule B-1 as enacted Oct 8, 2024; indexed yearly from Jan 1, 2025) | 2026-10-23 |
| Essex County County |
County of Essex By-law 2026-02, Development Charges By-law
+1 more adopted 2026-02-04 |
charge per single-detached home: $0 per unit (Feb 4, 2026–Dec 31, 2027); $2,147 per unit (Jan 1–Dec 31, 2028); $4,295 per unit (Jan 1–Dec 31, 2029); $6,442 per unit (Jan 1–Dec 31, 2030); $8,589 per unit (from Jan 1, 2031) · charge per apartment unit: $0 per unit (Feb 4, 2026–Dec 31, 2027); $1,142 per unit (Jan 1–Dec 31, 2028); $2,285 per unit (Jan 1–Dec 31, 2029); $3,427 per unit (Jan 1–Dec 31, 2030); $4,569 per unit (from Jan 1, 2031) · non-residential charge: $0.00 per m² (Feb 4, 2026–Dec 31, 2027); $7.85 per m² (Jan 1–Dec 31, 2028); $15.71 per m² (Jan 1–Dec 31, 2029); $23.56 per m² (Jan 1–Dec 31, 2030); $31.41 per m² (from Jan 1, 2031) | 2026-10-19 |
| Fort Erie Town |
Town of Fort Erie By-law 20-2024, Development Charges By-law for General Services
+3 more adopted 2024-02-26 |
charge per single-detached home: $41,723 per unit (Jan 1 2026 to Dec 31 2026) [Town total: Municipal-Wide $18,816 + Urban Serviced Area $22,907] · charge per apartment unit: Apartments 2+ bedrooms: $27,822/unit; Apartments bachelor or 1 bedroom: $18,005/unit; Multiples: $30,276/unit (Jan 1 2026 to Dec 31 2026) · non-residential charge: $167.76/m2 total (Commercial, Industrial, and Institutional) [Municipal-Wide $56.27/m2 + Urban Serviced Area $111.49/m2] (Jan 1 2026 to Dec 31 2026) | 2026-10-23 |
| Gananoque Town |
Development Charges rates pamphlet, Jan 1 2026 (Schedule B)
+1 more |
charge per single-detached home: Single and Semi-Detach Dwelling: $1,835.42 rural area; $3,417.75 urban area per unit (Jan 1 2026) · charge per apartment unit: Apartment 2 Bedrooms +: $1,168.67 rural area; $2,177.71 urban area per unit. Apartment Bachelor and 1 Bedroom: $794.47 rural area; $1,480.00 urban area per unit (Jan 1 2026) · non-residential charge: Non-residential: $0.83 per sq.ft. of Gross Floor Area (rural area); $1.93 per sq.ft. of Gross Floor Area (urban area) (Jan 1 2026) | 2026-10-19 |
| Georgian Bay Township |
2026 Development Charges Pamphlet, Township of Georgian Bay
+1 more |
charge per single-detached home: $10,102 for Singles & Semis (Effective Date: January 1, 2026) · charge per apartment unit: $5,682 for Apartment - Large; $4,420 for Apartment - Small (Effective Date: January 1, 2026) · non-residential charge: $43.68 per square metre; $4.06 per square foot (Total Township Charge; Effective Date: January 1, 2026) | 2026-10-19 |
| Georgina Town |
By-law 2025-0053 (AD-5), A By-law to Impose Development Charges in the Town of Georgina
+1 more adopted 2025-08-13 |
charge per single-detached home: Town-wide $33,255; Keswick $36,729; Sutton $35,849; Sutton High Street Sewer $36,088; Queensway East and West $40,496 per single/semi-detached unit (effective Sept 1, 2025) · charge per apartment unit: Apartments >700 sq.ft.: $23,279 town-wide (Keswick $25,711; Sutton $25,095); <700 sq.ft.: $16,073 town-wide (Keswick $17,752; Sutton $17,327) per unit (effective Sept 1, 2025) · non-residential charge: Town-wide $32.23/sq.m; Keswick $49.52/sq.m; Sutton $45.01/sq.m; Sutton High Street Sewer $45.01/sq.m; Queensway East and West $80.92/sq.m | 2026-10-19 |
| Goderich Town |
Development Charges effective July 1, 2026 (annual adjustment 2.9%) | — | 2026-10-19 |
| Grand Valley Town |
Development Charges By-law No. 2024-33
+1 more adopted 2024-07-16 |
services covered: Road and Related Services; Fire Protection Services; Parks and Recreation Services; Library Services; Septage Treatment Services; Wastewater Services; Water Services; Growth-Related Studies. · exemptions: Existing dwelling enlargement; second/third units in single/semi/row; industrial enlargement ≤50%; farm buildings; places of worship; affordable/attainable units; rental housing discounts. · payable: calculated, payable, and collected upon issuance of a building permit; rental/institutional in 6 installments from occupancy; agreements may defer. | 2026-10-26 |
| Gravenhurst Town |
By-law No. 2024-110, Being a By-law with Respect to Development Charges for The Town of Gravenhurst
adopted 2024-11-19 |
charge per single-detached home: Single detached/duplex/semi-detached: $7,308 per unit (Jan 1 2025); $8,849 per unit (Jan 1 2026); $10,389 per unit (Jan 1 2027) · charge per apartment unit: Apartments 2+ bedrooms/sleeping areas: $5,830 per unit (Jan 1 2025), $6,816 (Jan 1 2026), $7,801 (Jan 1 2027); 1 bedroom or less/<2 sleeping areas: $3,265 (Jan 1 2025), $4,301 (Jan 1 2026), $5,337 (Jan 1 2027) · non-residential charge: General non-residential: $0.00 per square metre (Jan 1 2025; Jan 1 2026; Jan 1 2027) | 2026-10-23 |
| Greater Madawaska Township |
By-law 26-2022, Being a By-Law with respect to Development Charges (Township of Greater Madawaska)
+1 more adopted 2022-04-19 |
charge per single-detached home: $7,610 per single/semi unit (by-law schedule from Jan 1, 2025, final phase-in step; indexed annually) · charge per apartment unit: Apartments 2+ bedrooms: $5,326; bachelor/1 bedroom: $3,617 per unit (by-law schedule from Jan 1, 2025; indexed annually) · non-residential charge: $4.66 per sq.ft. GFA (by-law schedule from Jan 1, 2025; indexed annually) | 2026-10-19 |
| Greater Napanee Town |
Development Charges By-law No. 2022-0059 (consolidated to July 15, 2026)
adopted 2022-09-13 |
charge per single-detached home: Single and Semi-Detached Dwelling: $23,279 per unit (Urban Area); $7,760 per unit (Rural Area) · charge per apartment unit: Apartments - 2 Bedrooms +: $15,350/unit urban, $5,117/unit rural; Apartments - Bachelor and 1 Bedroom: $10,291/unit urban, $3,431/unit rural · non-residential charge: Rural Area: $3.48/sq.ft ($37.46/sq.m); Urban Area: $11.29/sq.ft ($121.52/sq.m) | 2026-10-22 |
| Greater Sudbury City |
Development Charges By-law 2024-105
+3 more |
services covered: General Government, Library, Fire, Police, Parks and Recreation, Ambulance, Emergency Preparedness, Transit, Roads and Related, Water, Wastewater, Drains and Stormwater Services · exemptions: Board of Education, municipal/Local Board, colleges, garden suites, non-profit/affordable housing, universities (50% non-academic), hospices/long-term care, brownfields, LEED rebates, rental reductions, intensification, industrial expansion. · payable: Upon building permit issuance; Institutional and Rental Housing Developments in six equal annual payments commencing at occupancy/permit. | 2026-10-23 |
| Grey County County |
By-Law 5127-22, A By-Law to Establish Development Charges for the County of Grey (County-Wide Roads and Related Charges)
+2 more adopted 2021-12-09 |
services covered: Services Related to a Highway: Public Works; Services Related to a Highway: Roads & Related Works · exemptions: Additional dwelling units; municipal/board/hospital/church/farm/agricultural labourer uses; not-for-profit housing; purpose-built rental and CIP-incentivized development (agreement); temporary buildings; redevelopment credits · payable: Payable when building permit is ready to be issued; deferral via Deferral and Conditional Exemption Agreement | 2026-10-19 |
| Grey Highlands Municipality |
By-law No. 2026-102, A by-law to establish Area-Specific Development Charges for the Markdale Lagoon Expansion Area
+2 more adopted 2026-09-16 |
services covered: Wastewater services, including sewers and treatment services. · exemptions: Exempt: residential unit enlargement; affordable/attainable, non-profit, inclusionary-zoning, long-term care; certain institutional/farm lands; industrial expansion ≤50%; rental housing discounts. · payable: Rental/institutional: equal annual instalments over 5 years from occupancy; other residential: in full at occupancy; non-residential: in full at building permit. | 2026-10-19 |
| Grimsby Town |
2026 Development Charges Fees Schedule (Jan 1 - Dec 31, 2026)
+2 more |
charge per single-detached home: Rural Area: $22,254 per unit; Urban Area: $25,576 per unit (Jan 1 – Dec 31, 2026) · charge per apartment unit: Apartments 2 Bedrooms+: Rural $14,115 / Urban $16,223; Bachelor & 1 Bedroom: Rural $8,627 / Urban $9,913 per unit (Jan 1 – Dec 31, 2026) · non-residential charge: Industrial: Rural $3.37/ft² / Urban $4.01/ft²; Non-Industrial: Rural $7.17/ft² / Urban $8.52/ft² of Gross Floor Area (Jan 1 – Dec 31, 2026) | 2026-10-23 |
| Guelph City |
Development Charges By-law (2024)-20866
+2 more adopted 2024-01-16 |
charge per single-detached home: $66,977 per unit (sum of Schedule A charges; by-law in effect March 2, 2024; Growth Studies in effect November 20, 2024) · charge per apartment unit: $40,094 per 2-bedroom+ apartment; $29,383 per studio/1-bedroom apartment (sum of Schedule A charges; by-law in effect March 2, 2024; Growth Studies in effect November 20, 2024) · non-residential charge: $27.04 per sq.ft. of Gross Floor Area (sum of Schedule A charges; by-law in effect March 2, 2024; Growth Studies in effect November 20, 2024) | 2026-10-19 |
| Guelph/Eramosa Township |
By-law 24/2023 Development Charges - Fire Protection
+6 more adopted 2023-05-08 |
charge per single-detached home: $1,194 per single/semi unit (fire protection service only; By-law 24/2023 Schedule B) · charge per apartment unit: 2+ bedrooms $702; bachelor/1 bedroom $450 per unit (fire protection service only; Schedule B) · non-residential charge: $0.36 per sq ft of GFA (fire protection service only; Schedule B) | 2026-10-23 |
| Haldimand City |
Development Charges By-law No. 2042-19
adopted 2019-05-13 |
charge per single-detached home: Rural Area: $18,890 per unit; Urban Area: $31,552 per unit · charge per apartment unit: Rural Area: $14,094 per unit (2 Bedrooms +), $9,068 per unit (Bachelor and 1 Bedroom); Urban Area: $23,535 per unit (2 Bedrooms +), $15,146 per unit (Bachelor and 1 Bedroom) · non-residential charge: Rural Area: $3.09/ft2 ($33.30/m2); Urban Area: $7.96/ft2 ($85.68/m2) of gross floor area | 2026-10-26 |
| Halton Hills Town |
By-law No. 2022-0042 - A By-law to Establish Development Charges for the Town of Halton Hills
+3 more adopted 2022-07-04 |
charge per single-detached home: $32,070 per single and semi-detached dwelling unit (by-law effective Sept 1, 2022) · charge per apartment unit: Apartments 2 Bedrooms+: $16,542 per unit; Apartments Bachelor and 1 Bedroom: $12,197 per unit (by-law effective Sept 1, 2022) · non-residential charge: Industrial: $34.44/m²; Non-Industrial: $95.59/m² (Schedule "B") | 2026-10-22 |
| Hamilton City |
By-law No. 24-072 - Being a By-Law Respecting Development Charges on Lands within the City of Hamilton (office consolidation, June 1, 2026)
+4 more adopted 2024-05-08 |
charge per single-detached home: $37,863 per unit city-wide services, plus area-specific: wastewater $17,755 (Urban Area A), water $6,856 (Area A), W/WW studies $543, stormwater by sewer area (full rate, unindexed, June 1, 2024) · charge per apartment unit: 2+ bedrooms $23,215; bachelor/1 bedroom $14,381 per unit city-wide services, plus area-specific water, wastewater and stormwater charges (full rate, unindexed, June 1, 2024) · non-residential charge: $18.00 per sq ft of GFA city-wide services, plus area-specific: wastewater $11.28 (Urban Area A), water $4.36 (Area A), W/WW studies $0.35, stormwater (full rate, unindexed, June 1, 2024) | 2026-10-19 |
| Hamilton Township |
By-law Number 2024-60 - Being A By-law to Establish and Impose Development Charges for the Township of Hamilton
+1 more adopted 2024-11-19 |
charge per single-detached home: $14,116 per unit municipal-wide; $25,820 in Creighton Heights/Camborne water area (2026); $29,336 total incl. Northumberland County DC · charge per apartment unit: 2 bedrooms+: $8,076; bachelor/1 bedroom: $6,399 per unit municipal-wide (2026); $14,772 / $11,706 with Creighton Heights/Camborne water; totals incl. County $17,106 / $13,482 · non-residential charge: $7.19 per sq.ft. GFA municipal-wide; $11.86 with Creighton Heights/Camborne water (2026); $13.81 total incl. County DC | 2026-10-26 |
| Havelock-Belmont-Methuen Township |
Development Charges By-law No. 2025-043
adopted 2025-06-03 |
charge per single-detached home: $12,388 per single/semi unit township-wide; $18,088 incl. urban-area wastewater (By-law 2025-043 Schedule B; indexed annually from Jan 1, 2026) · charge per apartment unit: 2+ bedrooms $10,983 / bachelor-1 bedroom $5,792 per unit township-wide; $16,037 / $8,457 incl. urban-area wastewater (Schedule B) · non-residential charge: $4.45 per sq ft of GFA township-wide; $7.97 incl. urban-area wastewater (Schedule B) | 2026-10-19 |
| Huntsville Town |
Development Charges (Town of Huntsville rates page)
+2 more |
charge per single-detached home: Single & Semis total charge: $9,734 (January 1, 2026 - December 31, 2026) · charge per apartment unit: 2+ Bedroom Apartments: $6,734; Bachelor or 1 Bedroom Apartments: $4,481 (January 1, 2026 - December 31, 2026) · non-residential charge: Per Square Foot of Gross Floor Area: $4.24; Per Square Metre of Gross Floor Area: $45.57 (January 1, 2026 - December 31, 2026) | 2026-10-19 |
| Huron-Kinloss Township |
Development Charges By-law No. 2024-103 (with Schedule A, indexed to 2026)
+1 more adopted 2024-11-18 |
charge per single-detached home: Lucknow $5,201; Ripley $5,965; Finlay St. $66,203; Lakeshore $5,460; Huron $1,431; Kinloss $1,772 per single & semi detached unit (Indexed to 2026 rates - Nov 2025) · charge per apartment unit: Lucknow 2+ bed $2,761 / 1 bed or bachelor $2,520; Ripley $3,168 / $2,891; Finlay St. $35,153 / $32,076; Lakeshore $2,898 / $2,646; Huron $759 / $694; Kinloss $940 / $859 per apartment unit (Indexed to 2026 rates - Nov 2025) · services covered: sanitary sewage, water, stormwater, roads, fire protection, parks and recreation, septage, administration | 2026-10-19 |
| Ingersoll Town |
Town of Ingersoll Development Charges summary, effective June 13, 2026
+2 more |
parkland dedication: Residential 5% of gross land area; commercial/industrial 2%; other/institutional 5%; cash-in-lieu 2% (commercial/industrial) or 5% (residential/all other) of appraised value; $600/lot for specified consent/ZBA units, increased annually · services covered: Acquisition of land for public parks; capital projects for new public parks, facilities, site preparation/drainage; increasing capacity of existing public parks · exemptions: Additional residential dwelling; replacement after acts of nature/catastrophe (same GFA); Town/County; public utility buildings; additions/interior renovations not increasing dwelling units; minor commercial/industrial additions/alterations | 2026-10-23 |
| Innisfil Town |
Development Charges By-law 013-25 (Wastewater Treatment Plant)
+7 more adopted 2025-02-12 |
charge per apartment unit: $800 per dwelling unit Community Benefits Charge (not a DC; applies to buildings of 5+ storeys adding 10+ units); Orbit area rises to $900, then $950, at Major Transit Station milestones; indexed April 1 · services covered: Capital costs of facilities, services, and matters required for Development or Redevelopment · exemptions: Land or buildings owned or used for purposes of the Town or County; in-kind contributions may reduce charge | 2026-10-19 |
| Kawartha Lakes City |
By-Law 2025-139, A By-Law to Impose Development Charges in the City of Kawartha Lakes
+3 more adopted 2025-11-18 |
services covered: public health, by-law enforcement, parks/recreation, library, growth studies, fire, fire-rural, paramedic, police, transit, roads, water treatment/distribution, wastewater treatment/collection · exemptions: Legislated exemptions; places of worship, non-profit hospice, public hospital, cemetery/burial/crematorium, agricultural buildings, park model trailers; temporary building refunds; redevelopment credits · payable: Payable on permit issuance if permit withheld; otherwise on first approval/action; s.27 agreement may vary | 2026-10-19 |
| Kincardine Municipality |
Development Charges (Municipality of Kincardine web page)
+3 more |
levy per hectare: $236,151 per net hectare · services covered: Storm water, wastewater infrastructure, water infrastructure, and services related to a highway: roads and related infrastructure. · exemptions: Exemptions for intensification of existing and new housing per Act; land owned by board of education or municipality/local board; local services; redevelopment credits. | 2026-10-26 |
| King Township |
By-Law Number 2026-050, A By-law for the Imposition of Development Charges (Township of King)
+1 more adopted 2026-06-15 |
services covered: Water and wastewater studies; water distribution; wastewater services King City/Nobleton; services related to a highway; fire protection; library; parks and recreation; growth studies; land. · exemptions: Existing residential enlargement; additional residential units; municipal/board/education/region; places of worship; cemeteries; agricultural buildings; universities; non-profit/affordable/attainable housing; temporary structures; industrial enlargement; rental housing reductions. · payable: Payable on first building permit; engineered services on agreement; rental/institutional in 6 annual instalments from first occupancy; non-profit in 21 annual instalments; small office deferral; agreements may alter. | 2026-10-19 |
| Kingston City |
City of Kingston Development Charges Bylaw 2025-142
+1 more adopted 2025-05-20 |
charge per single-detached home: Grand Total Rural Area $18,703; Grand Total Urban Area $32,980 per single and semi-detached dwelling (Schedule B; effective May 20, 2025) · charge per apartment unit: Apartments - 2 Bedrooms+: $12,644 rural / $22,295 urban; Apartments - Bachelor and 1 Bedroom: $8,563 rural / $15,100 urban per unit (Schedule B) · non-residential charge: Industrial: $2.42 rural / $8.03 urban per sq.ft.; Non-industrial: $7.21 rural / $24.40 urban per sq.ft. (Schedule B) | 2026-10-19 |
| Kingsville Town |
By-law 4-2023, Being a By-law to establish development charges for the Town of Kingsville
+1 more adopted 2023-01-25 |
charge per single-detached home: $9,002 rural / $17,282 urban per single/semi-detached unit (Schedule B; Year 1 80% to Year 5-10 100%, indexed annually from Jan 1 2023) · charge per apartment unit: Apartments - 2 Bedrooms +: $6,119 rural / $11,747 urban; Bachelor and 1 Bedroom: $4,307 rural / $8,269 urban (Schedule B; subject to s. 3.17 phase-in and s. 5.1 indexing) · non-residential charge: Industrial, Commercial & Institutional: $3.012/sq.ft. rural / $6.791/sq.ft. urban; Greenhouses: $0.117/sq.ft. rural / $0.264/sq.ft. urban (Schedule B; subject to s. 3.17 phase-in and s. 5.1 indexing) | 2026-10-19 |
| Kitchener City |
By-law Number 2022-071, Being a by-law to establish development charges for the City of Kitchener and to repeal By-law 2019-086
+2 more adopted 2022-05-30 |
charge per single-detached home: $20,403 (suburban partial services, no sanitary sewer); $19,977 (no sewer or water) per single/semi unit — 2022 base rates, indexed Dec 1; other area rows not legible · non-residential charge: $48.55/m² (suburban partial services, no sanitary sewer); $45.87/m² (no sewer or water) — 2022 base rates, indexed Dec 1; other area rows not legible · services covered: Sanitary servicing, highway services (public works, roads), watermains, engineering studies, storm/watercourse, intensification allowance, fire protection, growth studies, library, indoor/outdoor recreation. | 2026-10-26 |
| LaSalle Town |
By-law Number 2026-031 - A By-Law to Impose Development Charges on certain Residential and Non-Residential Development within the Town of LaSalle
+2 more adopted 2026-04-28 |
parkland dedication: 5% of land residential/other, 2% commercial/industrial; payment in lieu per unit 2026 (Schedule A): single-detached rural $4,650, urban $9,850; semi/multiples $2,300; apartments $1,000 · services covered: Park or other public recreational purposes; acquiring and providing parkland for residents. · exemptions: Town; Board of Education with Shared Use Agreement; fire/demolition replacement without intensification; residential enlargement without additional units; institutional; temporary construction; second/third/ancillary units. Affordable/attainable units reduced by A/B ratio. | 2026-10-22 |
| Lakeshore Town |
By-law 89-2020 - Being a By-law for the Imposition of Development Charges
+1 more adopted 2020-12-15 |
charge per single-detached home: $11,576 rural / $26,189 urban per single/semi unit (Schedule B, 2021 base rates; by-law set to expire Jan 1, 2025) · charge per apartment unit: 2+ bedrooms: $5,918 rural / $13,389 urban; bachelor & 1 bedroom: $4,574 rural / $10,347 urban per unit (Schedule B, 2021 base rates) · non-residential charge: $3.63 rural / $9.90 urban per sq ft (Schedule B, 2021 base rates; by-law set to expire Jan 1, 2025) | 2026-10-26 |
| Lambton Shores Municipality |
2026 Development Charges Information Pamphlet
+1 more |
charge per single-detached home: $7,876.26 per unit municipal-wide; $13,020.62 in the Grand Bend wastewater area (2026) · charge per apartment unit: 1 bedroom or less: $4,192.20; 2+ bedrooms: $5,578.10 per unit municipal-wide; $6,930.33 / $9,221.40 in the Grand Bend wastewater area (2026) · non-residential charge: $37.74 per m² GFA municipal-wide; $67.82 in the Grand Bend wastewater area (2026) | 2026-10-26 |
| Laurentian Valley Township |
By-law Number 2020-09-039 - A By-law with respect to Development Charges
+2 more adopted 2020-09-01 |
charge per single-detached home: $2,786.00 per single detached unit (general, 2020); plus $1,845.00 where sewer & water serviced; Pleasant View full services total $4,635 · charge per apartment unit: $2,212.00 per unit (general, 2020); plus $1,450.00 where sewer & water serviced; Pleasant View full services total $3,694 · non-residential charge: Commercial/industrial $4.20 per m² GFA (general, 2020); plus $4.99 where sewer & water serviced; Pleasant View full services total $9.19/m² | 2026-10-26 |
| Leamington Municipality |
Development Charges Pamphlet 2026 - By-law 49-22 (Leamington) | charge per single-detached home: Municipal-wide $8,979.90; water serviced area $12,232.30; urban water & wastewater serviced area $13,029.48 per single/semi unit (2026 rates) · charge per apartment unit: 2+ bedrooms: $4,558.92 municipal-wide / $6,210.33 water serviced / $6,614.89 urban water & wastewater; bachelor/1 bed: $3,522.99 / $4,799.00 / $5,112.04 (2026) · non-residential charge: ICI per sq ft: $2.748 municipal-wide / $4.138 water serviced / $4.465 urban water & wastewater; greenhouse $0.110 / $0.638 / $0.638 (2026 rates) | 2026-10-23 |
| Lincoln Town |
2026 Development Charges Pamphlet, eff. Jan 1, 2026 (Lincoln)
+8 more |
charge per single-detached home: $51,853 per unit Grand Total Municipal + Urban (Jan 1 2026); Campden area adds $21,532/unit stormwater surcharge · charge per apartment unit: Apartments 2+ bedrooms: $36,693/unit; studio & 1 bedroom: $23,778/unit (Grand Total Municipal + Urban, Jan 1 2026); municipal-wide only: $26,542 / $17,200 · non-residential charge: Commercial: $367.34/sq.m.; Industrial: $152.96/sq.m.; Institutional: $272.20/sq.m. (Grand Total Municipal + Urban, Jan 1 2026) | 2026-10-19 |
| London City |
2026 Development Charges rates (effective Jan 1 - Dec 31, 2026)
+2 more |
charge per single-detached home: $50,564 per unit inside Urban Growth Area; $32,483 outside (excl. wastewater, stormwater, water) (Jan 1–Dec 31, 2026) · charge per apartment unit: Apartments < 2 Bedrooms: $22,364 inside UGA, $14,368 outside UGA; Apartments >= 2 Bedrooms: $30,306 inside UGA, $19,471 outside UGA (per dwelling unit, Jan 1–Dec 31, 2026) · non-residential charge: Commercial: $428.30/m2 inside UGA, $260.91/m2 outside UGA; Institutional: $264.21/m2 inside UGA; 50% Institutional: $132.10/m2; Industrial: $305.33/m2 inside UGA (gross floor area basis) | 2026-10-19 |
| Lucan Biddulph Township |
Development Charges By-law No. 26-2023
+1 more adopted 2023-06-06 |
charge per single-detached home: Schedule A: $35,260/unit Lucan Urban Area; $6,841/unit Granton Urban Area; $3,631/unit Remainder of Township; phased per s.14 (Year 1 80%, Year 2 85%, Year 3 90%, Year 4 95%, Year 5 to expiry 100%) · charge per apartment unit: Schedule A: Lucan Urban Area $19,233/unit (2+ bedrooms), $14,104/unit (1 bedroom/bachelor); Granton Urban Area $3,732/unit (2+), $2,737/unit (1/bachelor); Remainder $1,981/unit (2+), $1,453/unit (1/bachelor); phased per s.14 · non-residential charge: Schedule A: $6.17/sq ft Lucan Urban Area; $0.64/sq ft Granton Urban Area; $0.46/sq ft Remainder of Township; phased per s.14 | 2026-10-19 |
| Mapleton Township |
Development Charges By-law 2024-033 (Township of Mapleton), updated Schedule B 2026
adopted 2024-07-09 |
charge per single-detached home: $34,420 per unit · charge per apartment unit: $17,210 per apartment unit · non-residential charge: $84.09 per m2; $7.81 per ft2 | 2026-10-23 |
| Markham City |
Development Charges By-law 2022-49 (City-wide hard services)
+4 more adopted 2022-05-31 |
services covered: capital costs of facilities, services, and matters required for Development or Redevelopment · exemptions: Does not apply to Municipality/Region land; reduced proportionately for O. Reg. 509/20 s. 1 types. · payable: Payable prior to issuance of first Building Permit; each phase separate. | 2026-10-28 |
| McNab/Braeside Township |
Development Charges By-law No. 2019-42 | charge per single-detached home: $3,954.00 per single detached unit (general, township-wide, 2019); plus $230.00 in Jedd Creek/Campbell Drain or $298 in Dochart Creek stormwater areas · charge per apartment unit: $3,143.00 per unit (general, township-wide, 2019); plus $182.00 in Jedd Creek/Campbell Drain or $237 in Dochart Creek stormwater areas · non-residential charge: Commercial/industrial $9.00 per m² GFA (general, 2019); plus $0.38 in Jedd Creek/Campbell Drain or $0.43 in Dochart Creek stormwater areas | 2026-10-23 |
| Meaford Municipality |
By-law 2024-48, Being a by-law to establish Development Charges for the Municipality of Meaford
+1 more adopted 2024-10-07 |
charge per single-detached home: $45,094 per unit serviced (incl. system-wide water & sewer); $15,923 municipal-wide only (Schedule B, 2024 base, indexed) · non-residential charge: Other non-residential $287.24/m² serviced ($65.48 municipal-wide only); industrial $150.39/m² serviced ($39.50) (Schedule B, 2024 base) · services covered: Public Library; Fire Protection Services; Parks and Recreation; Highway: Public Works; Development-Related Studies; Highway: Roads and Related; System-Wide Water; System-Wide Sewer; Stormwater Drainage and Control | 2026-10-23 |
| Melancthon Township |
Development Charges By-law 30-2024
adopted 2024-07-18 |
charge per single-detached home: $17,534 per single/semi-detached unit (Schedule B grand total incl. growth studies; by-law in force July 18, 2024) · non-residential charge: $4.28 per sq.ft. of gross floor area (Schedule B grand total; by-law in force July 18, 2024) · services covered: Highway; fire protection; parks and recreation; library; growth-related studies | 2026-10-26 |
| Merrickville–Wolford Village |
By-law No. 45-2026, A By-law for the Imposition of Development Charges | charge per single-detached home: $6,991 rural / $8,497 urban per unit (July 28, 2026 to Jan 27, 2027); phases up to $20,976 rural / $25,494 urban from July 28, 2027 · charge per apartment unit: 2+ bed: $4,587 rural / $5,575 urban; bachelor/1 bed: $3,379 rural / $4,107 urban per unit (July 28, 2026 to Jan 27, 2027); higher phases from Jan 28, 2027 · non-residential charge: $4.84 rural / $6.14 urban per sq.ft. GFA (July 28, 2026 to July 27, 2027); rising to $14.50 rural / $18.39 urban from July 28, 2028 | 2026-10-19 |
| Middlesex Centre Municipality |
Development Charges Imposed under By-law 2024-064 - Rates for 2026 (brochure)
+1 more |
charge per single-detached home: Single and Semi-Detached Dwelling: $14,358 rural / $38,926 urban per unit (Schedule A; effective July 11, 2024) · charge per apartment unit: Apartments - 2 Bedrooms +: $10,016 rural / $27,155 urban per unit; Apartments - Bachelor and 1 Bedroom: $6,378 rural / $17,291 urban per unit (Schedule A; effective July 11, 2024) · non-residential charge: Other Non-Residential: $34.69 rural / $134.69 urban per sq.m. GFA; Agricultural: $22.62 per sq.m. GFA (Schedule A; effective July 11, 2024) | 2026-10-19 |
| Middlesex County County |
2026 Development Charges Brochure
+1 more |
charge per single-detached home: $5,902.90 per unit (2026) · charge per apartment unit: Apartments 2+ bedrooms: $4,083.81 per unit; Apartments bachelor and 1 bedroom: $2,599.47 per unit (2026) · non-residential charge: $3.93 per sq. ft. of gross floor area (2026) | 2026-10-19 |
| Midland Town |
By-law 2025-21, Town of Midland Development Charges By-law
+2 more adopted 2025-03-19 |
charge per single-detached home: $2,495 per unit: Tiffin by the Bay area-specific roads charge only (Schedule C), on top of town-wide charges; town-wide Schedule B not in this transcript · charge per apartment unit: 2+ bed $1,941; bachelor/1 bed $1,277 per unit: Tiffin by the Bay area-specific roads charge only (Schedule C), on top of town-wide charges · services covered: Highway, fire, police, parks/recreation, library, growth-related studies, water, wastewater; area-specific roads (Tiffin) and water/wastewater (Balm Beach). | 2026-10-22 |
| Milton Town |
Development Charge By-law No. 045-2021
+2 more adopted 2021-05-31 |
services covered: Parkland Acquisition; Community Benefits Charge Strategy · exemptions: Long-term care, retirement homes, post-secondary institutions, Royal Canadian Legion, hospices, non-profit housing; fewer than 5 storeys or 10 residential units; government/parkland-agreement lands · payable: Paid prior to issuance of the building permit | 2026-10-28 |
| Minto Town |
Town of Minto Development Charges 2026 rate sheet | charge per single-detached home: Town of Minto: Urban $16,584/unit, Rural $4,284/unit (effective June 2, 2026); Wellington County: $11,916/unit (effective Jan 1, 2026) · charge per apartment unit: Town of Minto (effective June 2, 2026): 2+ Bedroom – Urban $11,633/unit, Rural $3,006/unit; Bachelor and 1 Bedroom – Urban $8,483/unit, Rural $2,191/unit; Wellington County (effective Jan 1, 2026): 2+ Bedroom $6,359/unit, Bachelor and 1 Bedroom $5,186/unit · non-residential charge: Town of Minto (effective June 2, 2026): Urban $5.82/sq ft, Rural $1.44/sq ft; Solar Farms $1.43/sq ft (Urban/Rural); Wellington County (effective Jan 1, 2026): $3.29/sq ft | 2026-10-19 |
| Mississauga City |
Mississauga Development Charges By-law 0133-2022 (as amended by OLT, March 7, 2025)
+1 more adopted 2022-06-22 |
charge per single-detached home: $53,363.00 per unit (City of Mississauga, Aug 1, 2026–Jan 31, 2027); $139,019.54 total incl. Region of Peel and school boards · charge per apartment unit: City of Mississauga: apartments $36,371.00; small units (≤65 m²) $19,816.00 per unit (Aug 1, 2026–Jan 31, 2027); totals incl. Peel Region & schools $100,062.43 / $56,174.75 · non-residential charge: City of Mississauga: industrial $133.19/m², non-industrial $158.50/m² of TFA (Aug 1, 2026–Jan 31, 2027); totals incl. Peel Region & schools $395.79 / $495.69 | 2026-10-28 |
| Mississippi Mills Town |
Mississippi Mills 2023 Development Charges By-laws 23-081 to 23-088
+2 more adopted 2023-12-05 |
charge per single-detached home: Per-service by-laws, Jan 1, 2024: highway $4,945; fire $430; parks $3,427; library $2,912; child care $165; septage $60; wastewater $7,219 per single/semi (water 23-088 rate not in transcript) · charge per apartment unit: 2+ bed / bachelor-1 bed, Jan 1, 2024: highway $2,913/$2,103; fire $253/$183; parks $2,019/$1,457; library $1,716/$1,238; child care $97/$70; septage $35/$26; wastewater $4,253/$3,070 · non-residential charge: Highway $3.26; Fire $0.22; Parks $0.39; Library $0.33; Child Care $0.00; Septage $0.03; Wastewater $1.83 per sq.ft. of gross floor area (By-laws 23-081 to 23-087; water 23-088 schedule not in transcript) | 2026-10-19 |
| Mono Town |
Development Charges Bylaw 2024-28
+1 more adopted 2024-07-16 |
charge per single-detached home: $34,781 per unit (4+ bedrooms); $29,976 per unit (3 bedrooms); $26,676 per unit (2 or less bedrooms) (effective July 16, 2024) · charge per apartment unit: $11,175 per unit (Bachelor and 1 Bedroom); $17,158 per unit (2 Bedrooms +) · non-residential charge: $14.10 per sq.ft. of Gross Floor Area | 2026-10-26 |
| Mulmur Township |
Development Charges By-law No. 22-2024
+2 more adopted 2024-07-03 |
charge per single-detached home: $19,858 (Single and Semi-Detached Dwelling; Schedule B total) · charge per apartment unit: Apartments - 2 Bedrooms +: $14,736; Apartments - Bachelor and 1 Bedroom: $7,326 (Schedule B totals) · non-residential charge: $4.20 per sq.ft. of Gross Floor Area (Township-Wide Services/Class of Services total) | 2026-10-26 |
| Muskoka Lakes Township |
Development Charges (By-law 2024-055) - Township building page rates, indexed January 1, 2026
+2 more adopted 2024-06-12 |
charge per single-detached home: $18,367.00 per unit (Jan 1 2026); Rows and other multiples: $12,554.00 per unit (Jan 1 2026) · charge per apartment unit: Apartments (2 or more bedrooms): $10,178.00; Apartments (Bachelor or 1 bedroom): $6,786.00 (Jan 1 2026) · non-residential charge: $5.00 per square foot of building space (Jan 1 2026) | 2026-10-26 |
| New Tecumseth Town |
Development Charges page
+2 more |
charge per single-detached home: $74,403 per unit (Jan 1, 2022) · charge per apartment unit: 2+ bedrooms: $53,493 per unit; bachelor/1 bedroom: $34,039 per unit (Jan 1, 2022) · non-residential charge: Industrial: $302.95/m²; non-industrial: $370.53/m² | 2026-10-19 |
| Newmarket Town |
Development Charges By-law 2019-46 (Non-Discounted Services, Town-Wide excluding Northwest Quadrant)
+5 more adopted 2019-07-18 |
charge per single-detached home: $12,793 per unit (non-discounted services only: fire, waste diversion, highway/water/wastewater/storm; from Sep 1, 2019, before annual indexing; excl. Northwest Quadrant) · charge per apartment unit: $7,595 (700 sq ft or greater) / $5,425 (under 700 sq ft) per unit (non-discounted services only; from Sep 1, 2019, before annual indexing) · non-residential charge: $66.09 per square metre (non-discounted services only; from Sep 1, 2019, before annual indexing) | 2026-10-19 |
| Niagara Falls City |
2026 Development Charges pamphlet (effective Sept 1, 2026)
+2 more |
charge per single-detached home: $37,362 per unit (effective September 1, 2026) · charge per apartment unit: $18,538 per apartment unit (effective September 1, 2026) · non-residential charge: $150.16 per square metre / $13.95 per square foot (effective September 1, 2026) | 2026-10-28 |
| Niagara-on-the-Lake Town |
By-law No. 5072-18 - Town-wide Development Charge By-law
adopted 2018-07-16 |
services covered: Roads, fire protection, parking, by-law, indoor/outdoor recreation, library, administration, stormwater, wastewater, and water services. · exemptions: Board of education, municipality/local board, farm building, place of worship; industrial expansion ≤50%; one unit on pre-1991 vacant lot; 50% for non-profit special care/retirement homes. · payable: Payable in full on first building permit issuance; agreement may allow payment before or later. | 2026-10-23 |
| Norfolk City |
Development Charges By-law 2019-100
+2 more adopted 2019-10-15 |
services covered: Roads and Related; Fire Protection; Parking; Parks and Recreation; Library; Administration; Ambulance; Waste Diversion; Water; Wastewater · exemptions: Additional units/enlargements; industrial, roofed accommodation, temporary, farm help/farming, affordable housing, parking, places of worship, boards/local boards, Central Business Districts, brownfields. · payable: At building permit issuance; prepayment/deferral agreements may be authorized. | 2026-10-19 |
| North Bay City |
By-law No. 2019-72 - Development Charges By-law
+1 more adopted 2019-10-08 |
non-residential charge: $4.28 per sq.ft. of GFA (Schedules B1+B2 non-discounted services; rates in force Oct 9, 2019 to Oct 8, 2024) · services covered: Parks and Recreation; Transit; Fire and Police; Public Works; Roads and Related; Water; Sanitary Sewer. · exemptions: Board of Education, Municipality/Local Board, place of worship, universities/colleges, public hospital, Non-Profit Housing, Group Homes, Industrial Uses; Downtown Improvement Area; additional residential units (conditions); rural area excludes water/sewer. | 2026-10-19 |
| North Dumfries Township |
Township of North Dumfries 2026 Development Charges rate sheet | charge per single-detached home: $17,743 per unit, Township municipal-wide services (2026 rates, effective Dec 1, 2025) · charge per apartment unit: Apartments 2+ bedrooms: $11,766 per unit; bachelor and 1 bedroom: $7,277 per unit (effective Dec 1, 2025) · non-residential charge: $4.00 per sq ft (effective Dec 1, 2025) | 2026-10-19 |
| North Dundas Township |
Bylaw 2022-35 To Establish Development Charges
+1 more adopted 2022-05-03 |
charge per single-detached home: $12,228 per unit · charge per apartment unit: Bachelor & 1 Bedroom: $5,189 per unit; 2 Bedrooms+: $7,822 per unit · services covered: Fire Protection; Highway; Parks and Recreation; Waste Diversion; Growth-Related Studies; Pumping Station (area-specific) | 2026-10-23 |
| North Huron Township |
Township of North Huron Development Charges By-law 74-2021 (consolidated with 65-2026)
+1 more adopted 2021-09-20 |
parkland dedication: Residential: 5% of Gross Land Area (cash-in-lieu 5% of appraised value); commercial/industrial: 2% (cash-in-lieu 2%); other: 5% (cash-in-lieu 5%); consents: prescribed set fee. · services covered: Acquisition of parkland; capital projects for new/increased-capacity public parks; park facilities such as play equipment, sports fields, trails, splash pads, site furniture. · exemptions: Enlargement of existing dwelling; up to two additional residential units in existing dwelling/accessory building; fire/other-cause replacement without intensification; prior cash-in-lieu paid; affordable/attainable unit ratio reduction. | 2026-10-26 |
| North Middlesex Municipality |
By-law 041 of 2022 Development Charges (as amended by 014/2024, 058/2024, 067/2026)
adopted 2022-04-20 |
charge per single-detached home: Rural $3,533; Urban $24,754 (2022) · charge per apartment unit: Apartments - 2 Bedrooms +: Rural $2,405; Urban $16,854. Apartments - Bachelor and 1 Bedroom: Rural $1,517; Urban $10,626 (2022) · non-residential charge: Commercial, Institutional, and Small Industrial: Rural $1.11/sq.ft.; Urban $9.03/sq.ft. Large Industrial: Rural $1.11/sq.ft.; Urban $17.33/sq.ft. (2022) | 2026-10-23 |
| North Perth Municipality |
2026 Development Charges information sheet (By-laws 53-2024 & 74-2024)
+2 more |
charge per single-detached home: $23,724 per dwelling unit (Municipal Wide Total, Jan 1–Dec 31 2026); additional Urban Area-Specific and NEMP Area-Specific charges may apply · charge per apartment unit: Apartments with 2+ bedrooms: $13,699/unit; Apartments with 1 & less bedrooms: $9,184/unit (Municipal Wide Total, Jan 1–Dec 31 2026); additional area-specific and utility charges may apply · non-residential charge: $48.44/m² (Municipal Wide Total, Jan 1–Dec 31 2026); Non-Residential NEMP Area-Specific Total: $159.43/m²; based on Gross Floor Area | 2026-10-23 |
| Northumberland County County |
Countywide Development Charges By-law 2020-36 (Northumberland County)
+1 more adopted 2020-08-26 |
charge per single-detached home: $2,994 per unit outside Port Hope Rural Ward II; $2,931 in Port Hope Rural Ward II (County By-law 2020-36, effective Oct 1, 2020; indexed annually) · charge per apartment unit: Apartments - 2 Bedrooms +: 1,946 per unit in Port Hope Rural Ward II; 1,988 per unit outside Port Hope Rural Ward II. Apartments - Bachelor and 1 Bedroom: 1,480 per unit in Port Hope Rural Ward II; 1,512 per unit outside Port Hope Rural Ward II · non-residential charge: 1.41 per sq.ft. of Gross Floor Area in Port Hope Rural Ward II; 1.45 per sq.ft. of Gross Floor Area outside Port Hope Rural Ward II | 2026-10-19 |
| Norwich Township |
Development Charges By-law No. 32-2024 (Township of Norwich)
adopted 2024-06-04 |
services covered: Services Related to a Highway; Fire Protection Services; Parks and Recreation Services · exemptions: Farm buildings, private schools, temporary buildings/dwelling units, affordable housing, long-term care homes; industrial expansion up to 50%; additional residential units under s.4. · payable: Payable in full on date first building permit is issued; permit not issued until paid. Rental housing and institutional developments payable in 6 equal installments commencing at occupancy, then annually with interest. | 2026-10-23 |
| Oakville Town |
Development Charges By-law 2022-068 (Town of Oakville)
+1 more adopted 2022-07-12 |
services covered: capital costs of facilities, services and matters required for development and redevelopment · exemptions: Excludes long-term care, retirement homes, post-secondary institutions, Royal Canadian Legion, hospices, non-profit housing; land owned by school boards, crown agencies, public colleges/universities, municipality/Region/local boards. · payable: Payable in full the day before building permit issuance; permit not issued until paid; in-kind contributions may be permitted in lieu. | 2026-10-28 |
| Orangeville Town |
Development Charges (rates page) - Town of Orangeville
+1 more |
charge per single-detached home: $50,862.09/unit (Town wide total for single and semi-detached homes) · charge per apartment unit: $32,057.89/unit (2+ bedrooms); $17,695.14/unit (bachelor and 1 bedroom units) (Town wide total) · non-residential charge: $182.26/building m2 (Town wide total) | 2026-10-23 |
| Orillia City |
Development Charges By-law No. 2023-009
+1 more adopted 2023-02-13 |
charge per single-detached home: $26,586 per unit (effective Feb 13, 2023) · charge per apartment unit: Bachelor & 1 Bedroom: $14,601 per unit; 2 Bedrooms +: $20,856 per unit (effective Feb 13, 2023) · non-residential charge: $108.25 per square metre (effective Feb 13, 2023) | 2026-10-19 |
| Oro-Medonte Township |
Development Charges - Complete Package effective January 1, 2026
+2 more |
charge per single-detached home: $20,187 per unit township-wide; $31,482 in urban (water) area (Township of Oro-Medonte, Jan 1, 2026); County of Simcoe charges $14,975 per unit separately · charge per apartment unit: 2+ bedrooms $12,300 per unit township-wide / $19,182 urban; bachelor/1-bed $8,016 / $12,501 (Township of Oro-Medonte, Jan 1, 2026); County of Simcoe $8,029 extra · non-residential charge: $5.19 per sq ft GFA township-wide; $11.47 urban area (Township of Oro-Medonte, Jan 1, 2026); County of Simcoe $63.01 per sq m extra | 2026-10-26 |
| Oshawa City |
Development Charges - City of Oshawa (rates page)
+3 more |
charge per apartment unit: Community benefits charge (not a DC), buildings 5+ storeys & 10+ units: $147 per 2+ bed unit; $90 per bachelor/1-bed (from May 1, 2023; +3%/yr) · services covered: Parkland in excess of Planning Act dedications; municipal-wide services (parking, by-law, corporate initiatives, IT, workforce planning); animal control; Community Benefits Charge Strategies; library; solid waste · exemptions: City/Board/Region lands; buildings <5 storeys or <10 units; long-term care, retirement, post-secondary, Legion, hospice, non-profit housing; affordable/inclusionary/attainable units | 2026-10-28 |
| Ottawa City |
Development Charges By-law No. 2024-218
adopted 2024-05-15 |
charge per single-detached home: Inside Greenbelt $48,265; Outside Greenbelt $57,596; Rural unserviced $40,597 per single/semi (effective May 15, 2024) · charge per apartment unit: 2+ bed / <2 bed per unit: Inside Greenbelt $26,516 / $18,850; Outside $30,976 / $22,019; Rural serviced $23,128 / $16,441; Rural unserviced $22,063 / $15,683 (May 15, 2024) · non-residential charge: City-wide: Industrial $15.59/sq ft; Non-Industrial $35.73/sq ft (effective May 15, 2024) | 2026-10-25 |
| Owen Sound City |
Development Charges By-law No. 2023-106
adopted 2023-10-23 |
charge per single-detached home: $16,221 per unit city-wide; Sydenham Heights adds $1,456 (By-law 2023-106 rates as enacted Oct 2023; indexed annually) · charge per apartment unit: $9,732 per apartment city-wide; Sydenham Heights adds $874 (By-law 2023-106 rates as enacted Oct 2023; indexed annually) · non-residential charge: $52.48 per sq m city-wide; Sydenham Heights adds $15.32 (By-law 2023-106 rates as enacted Oct 2023; indexed annually) | 2026-10-19 |
| Oxford County Regional municipality |
Development Charges By-law No. 6639-2024
+1 more adopted 2024-06-12 |
services covered: Highway, waste diversion, ambulance, long-term care, growth studies, library, and area-specific water/wastewater services (Schedule A). · exemptions: Exemptions: farm buildings, industrial buildings (except wind turbines), private schools, temporary buildings, affordable housing, temporary dwelling units, long-term care homes, intensification units; industrial expansion 50 percent or less exempt. · payable: Payable on first building permit issuance; rental housing and institutional developments in 6 equal annual installments from occupancy. | 2026-10-19 |
| Parry Sound Town |
Notice of Passing: Development Charge By-laws 2023-7346 to 2023-7351
adopted 2023-06-06 |
charge per single-detached home: $7,495 total development charge for Single and Semi-Detached Dwelling (effective June 6, 2023) · charge per apartment unit: Apartments - 2 Bedrooms +: $5,590; Apartments - Bachelor and 1 Bedroom: $3,323 (effective June 6, 2023) · non-residential charge: $2.82 per sq.ft. of Gross Floor Area (effective June 6, 2023) | 2026-10-23 |
| Pelham Town |
Development Charge By-law No. 83-2024
+2 more adopted 2024-12-04 |
parkland dedication: 2% for commercial/industrial; 5% in all other cases; up to 1 hectare per 300 dwelling units · services covered: park or other public recreational purposes · exemptions: Structural improvements/repairs not substantially increasing size/usability; vacant agricultural lands for agricultural buildings excluding residential; previous parkland conveyance/cash-in-lieu credited. | 2026-10-23 |
| Pembroke City |
Development Charges By-law 2021-26
adopted 2021-05-04 |
charge per single-detached home: $4,089 per unit (Single & Semi-Detached) · charge per apartment unit: $2,399 per unit (Apartments) · non-residential charge: $10.52 per sq. m (Non-Residential) | 2026-10-19 |
| Penetanguishene Town |
2025 Development Charges rates sheet (Jan 1, 2025)
+1 more |
charge per single-detached home: $26,141 per unit full service; $19,865 water no sewers; $18,279 unserviced (Town, Jan 1, 2025); $45,996 full-service total incl. Simcoe County and school boards · charge per apartment unit: $17,253 per unit full service; $13,111 water no sewers; $12,064 unserviced (Town, Jan 1, 2025) · non-residential charge: $147.43 per sq m GFA full service; $80.98 water no sewers; $64.19 unserviced (Town, Jan 1, 2025); eligible commercial/industrial exempt from Town charge | 2026-10-23 |
| Perth Town |
2026 Development Charges (By-law 4839 Schedule B, indexed)
+1 more |
charge per single-detached home: $15,563.29 per unit (South of Highway #7, 2026 Charge); $21,617.58 per unit (North of Highway #7, 2026 Charge) · charge per apartment unit: Apt - 2 Bedrooms Apartment: $8,733.85 per unit (South, 2026 Charge), $12,131.43 per unit (North, 2026 Charge); Apt - 1 Bedroom & bachelor Apartment: $8,242.65 per unit (South, 2026 Charge), $11,449.30 per unit (North, 2026 Charge) · non-residential charge: $11.07 per sq. ft. (South of Highway #7, 2026 Charge); $13.58 per sq. ft. (North of Highway #7, 2026 Charge) | 2026-10-26 |
| Perth East Township |
By-law Number 59-2021 - Development Charges By-law
+1 more adopted 2021-11-02 |
services covered: Fire, library, parks and recreation, development-related studies, public works, roads and related, water, wastewater. · exemptions: Additional residential units/enlargements; industrial expansion up to 50%; places of worship, cemeteries, public hospitals, temporary buildings, bona fide farm uses, accessory buildings; redevelopment credits. · payable: Calculated and payable at first building permit; permit not issued until paid; agreement may defer; if no permit, at approval. | 2026-10-19 |
| Petawawa Town |
Development Charges By-law 1675/24
adopted 2024-07-08 |
charge per single-detached home: $5,236 per unit (rural); $7,131 per unit (urban water only); $10,858 per unit (urban) [By-law effective July 9, 2024] · charge per apartment unit: Apartments 2 Bedrooms+: $2,814 per unit (rural); $3,832 per unit (urban water only); $5,835 per unit (urban). Bachelor/1 Bedroom: $2,067 per unit (rural); $2,815 per unit (urban water only); $4,286 per unit (urban) · non-residential charge: $2.46/sq.ft. (rural); $3.73/sq.ft. (urban water only); $5.91/sq.ft. (urban) of gross floor area | 2026-10-23 |
| Peterborough City |
By-law Number 25-100 - City-wide Development Charges By-law
+1 more adopted 2025-09-03 |
charge per single-detached home: $68,604 per single/semi (Schedule B as passed, in force Sept 3, 2025); the City's rates page lists a lower current charge · charge per apartment unit: $42,555 per apartment unit (Residential C; Schedule B as passed Sept 3, 2025) · non-residential charge: $257.29 per square metre (Schedule C as passed Sept 3, 2025) | 2026-10-28 |
| Peterborough County County |
By-law No. 2022-35 - Development Charges By-law
adopted 2022-05-02 |
charge per single-detached home: $10,957 per single/semi/duplex over 103 m2 GFA; $9,299 under 103 m2 (County charge, in force May 2, 2022; indexed annually from Jan 1, 2023) · charge per apartment unit: $6,752 per multiple/apartment unit under 93 m2 GFA (County charge, May 2, 2022; indexed annually) · non-residential charge: $39.61 per m2 (County charge, May 2, 2022; indexed annually from Jan 1, 2023) | 2026-10-19 |
| Pickering City |
Development Charges By-law No. 8190/25
+3 more adopted 2025-06-23 |
services covered: Parks Services; Arts, Culture, and Museum; Animal Services; Administration. · exemptions: No charge for <5 storeys or <10 residential units; exemptions: long-term care, retirement homes, post-secondary, Legion, hospice, non-profit housing, affordable/attainable/inclusionary units. · payable: Payable prior to issuance of any building permit unless an agreement establishes an alternative timeline; City and Owner may agree to defer payment. | 2026-10-19 |
| Port Colborne City |
Development Charges By-law No. 7278/100/24
+2 more adopted 2024-10-22 |
parkland dedication: 2% of land for commercial/industrial; 5% of land in all other cases · services covered: Park or other public recreational purposes; acquisition, development, maintenance of parkland, and park maintenance equipment · exemptions: Structural improvement/repair/replacement/enlargement not substantially increasing size/usability; vacant agricultural lands (excluding residential) no cash-in-lieu; prior non-parkland conveyances not credited | 2026-10-19 |
| Port Hope Municipality |
Development Charges (current 2026 rates) | charge per single-detached home: Urban: $35,509 per unit; Rural: $17,705 per unit (2026) · charge per apartment unit: Urban: 2+ bedrooms $26,138/unit; Bachelor and 1 bedroom $25,984/unit; Rural: 2+ bedrooms $13,031/unit; Bachelor and 1 bedroom $12,956/unit (2026) · non-residential charge: $5.87 per sq ft GFA municipal-wide (2026); urban areas add $0.37 police and $13.78 water/wastewater per sq ft | 2026-10-26 |
| Prince Township |
By-law 2026-22 Parkland Dedication By-law (conveyance of land / cash-in-lieu)
adopted 2026-05-12 |
parkland dedication: Conveyance: 2% commercial/industrial lands; 5% all other uses. Cash-in-lieu: 5% appraised value; 2% commercial/industrial. · services covered: parks or other public recreational purposes · exemptions: Township does not require conveyance of parkland or cash-in-lieu for development or redevelopment projects | 2026-10-26 |
| Prince Edward City |
2026 Development Charges (rate sheet)
+3 more |
charge per single-detached home: 17,294 (> 2 bedrooms); 12,493 (=<2 bedrooms) (January 1, 2026 - December 31, 2026) · charge per apartment unit: 15,123 (2 Bedrooms+); 8,285 (Bachelor & 1 Bedroom) (January 1, 2026 - December 31, 2026) · non-residential charge: 7.29 (Industrial, Commercial, & Institutional); 2.13 (Agricultural Buildings) (January 1, 2026 - December 31, 2026) | 2026-10-19 |
| Puslinch Township |
By-law Number 053-2024 Development Charges By-law
+2 more adopted 2024-09-03 |
parkland dedication: 5% of Net Area of the Lands for residential/institutional; 2% for commercial/industrial; mixed-use prorated by Building Floor Area · services covered: public park or other public recreational purposes · exemptions: Public Use; residential addition/alteration with no increase in dwelling units; enlargement by not more than 50% or 230 m2, whichever is less | 2026-10-23 |
| Quinte West City |
Development Charges (City of Quinte West web page; 2026 Schedule A to By-law 24-130)
adopted 2024-10-30 |
charge per single-detached home: $35,539 per unit (urban services area, Jan. 1–Dec. 31 2026); $10,716 rural; $14,779 water only · charge per apartment unit: Apartments 2 bedrooms+: $27,194 urban / $8,200 rural (Jan. 1–Dec. 31 2026); Apartments bachelor & 1 bedroom: $15,456 urban / $4,660 rural (Jan. 1–Dec. 31 2026) · non-residential charge: $182.82 per sq.m. gross floor area (urban services area, Jan. 1–Dec. 31 2026); $53.50 rural; $74.14 water only | 2026-10-28 |
| Ramara Township |
Township-wide Development Charges By-law 2020.21
+3 more adopted 2020-03-23 |
charge per single-detached home: $29,805 per single-detached unit (Bayshore Village area-specific sewer $27,256 + water $2,549; 2024 schedule; in addition to township-wide DCs) · services covered: Bayshore Village Sanitary Sewer Services; Bayshore Village Water Services · exemptions: Township/local board, County of Simcoe, Board of Education; enlargement of existing dwelling unit/additional dwelling units; other Act/Regulation exemptions | 2026-10-19 |
| Regional Municipality of Durham Regional municipality |
Regional Residential and Non-residential Development Charges By-law No. 42-2023
+2 more adopted 2023-06-14 |
charge per single-detached home: $75,081 per detached/semi unit (July 1, 2026–June 30, 2027, 95% phase-in); $79,033 from July 1, 2027 (by-law schedule, before annual July 1 indexing) · charge per apartment unit: 2+ bedrooms $43,713; 1 bedroom & smaller $26,849 per unit (July 1, 2026–June 30, 2027, 95% phase-in; before annual indexing) · non-residential charge: Commercial $39.41; institutional $20.48; industrial $18.53 per sq ft GFA (July 1, 2026–June 30, 2027, 95% phase-in; before annual indexing) | 2026-10-19 |
| Regional Municipality of Halton Regional municipality |
Development Charges By-law No. 25-22 (Built Boundary and Greenfield Areas)
adopted 2022-05-25 |
charge per single-detached home: $42,933.94 per unit Built Boundary Total Urban; $62,249.53 per unit Greenfield Total Urban; $32,712.98 per unit Rural Total Rural (effective Sept. 1, 2022; indexed Apr. 1 annually from 2023) · charge per apartment unit: Apartment Dwelling (2+ bedrooms): $20,856.51 Built Boundary; $30,228.64 Greenfield; $15,880.88 Rural. Apartment Dwelling (<2 bedrooms): $15,442.03 Built Boundary; $22,381.11 Greenfield; $11,758.10 Rural · non-residential charge: Built Boundary Total Urban: Retail $49.647/sq ft ($534.394/m²), Non-Retail $12.260/sq ft ($131.964/m²); Greenfield Total Urban: Retail $55.396/sq ft ($596.277/m²), Non-Retail $18.009/sq ft ($193.847/m²); Rural: Retail $46.254/sq ft ($497.873/m²), Non-Retail $8.867/sq ft ($95.443/m²) | 2026-10-19 |
| Regional Municipality of Niagara Regional municipality |
Regional Municipality of Niagara Development Charges By-law No. 2022-71
+1 more adopted 2022-08-25 |
charge per single-detached home: Single and Semi-Detached Dwelling: Total Rural Area 14,272; Total Urban Area 25,785 (Sep 1, 2022 - Aug 31, 2027) · charge per apartment unit: Apartments 2+ Bedrooms: Total Rural Area 9,702; Total Urban Area 17,528; Apartments 1 Bedroom: Total Rural Area 5,915; Total Urban Area 10,687 (Sep 1, 2022 - Aug 31, 2027) · non-residential charge: Commercial (per sq.ft.): Total Rural Area 8.16; Total Urban Area 16.35; Industrial (per sq.ft.): Total Rural Area 2.68; Total Urban Area 6.13; Institutional (per sq.ft.): Total Rural Area 6.03; Total Urban Area 12.07 (Sep 1, 2022 - Aug 31, 2027) | 2026-10-19 |
| Regional Municipality of Peel Regional municipality |
Region of Peel Development Charges By-law 77-2020
adopted 2020-12-10 |
services covered: highway-transportation; wastewater; water supply; Peel Regional Police; O.P.P.; long term care; housing services; public health; paramedics; waste diversion; public works; growth studies · exemptions: Hospitals; municipal/local board land; school board; college/university; agricultural society; mobile sales trailers; agricultural/on-farm diversified uses; 25% religious assembly; industrial enlargement; up to two additional residential units. · payable: Payable on first Building Code Act permit; subdivision/consent hard services at agreement; annual instalments under s.26.1; deferral agreements up to four years. | 2026-10-19 |
| Regional Municipality of Waterloo Regional municipality |
By-law 19-037, A By-law to Establish Development Charges for The Regional Municipality of Waterloo and to Repeal By-law 14-046
+1 more adopted 2019-06-26 |
charge per single-detached home: Single/Semi Detached: $28,056 per unit (City); $25,630 per unit (Township), effective August 1, 2019 · charge per apartment unit: Apartment Dwelling: $15,278 per unit (City); $13,957 per unit (Township), effective August 1, 2019 · non-residential charge: $16.07 (City) / $14.17 (Township) per sq ft GFA, full services, effective August 1, 2019 (indexed each Dec 1) | 2026-10-19 |
| Regional Municipality of York Regional municipality |
Development Charges Bylaw No. 2026-20
+3 more adopted 2026-05-21 |
services covered: water, wastewater, roads, transit, subway extensions, police, ambulance, public health, waste diversion, public works, court services, growth studies, land acquisition, long-term care/seniors · exemptions: heritage relocation, non-profit community use, hospice, private school, cemetery, agricultural uses, accessory use <=100 m², public hospital, farm worker dwelling, additional residential units; redevelopment credits; non-residential expansion <=50% exempt · payable: Payable on date building permit is issued, unless otherwise specified in a Regional policy or the Act; subdivision charges determined upon DC agreement, future development blocks at building permit. | 2026-10-19 |
| Renfrew Town |
Town of Renfrew By-law Number 77-2025 (Parkland Dedication)
adopted 2025-09-23 |
parkland dedication: Residential: 5% of total area; commercial: 2%; industrial: no dedication; mixed-use prorated by GFA; consent cash-in-lieu flat rates: non-waterfront residential $3,500, waterfront residential $5,000, agricultural severance $3,000 · services covered: park or other public recreational purposes · exemptions: Industrial: no parkland dedication; previously satisfied requirements exempt unless density increases or commercial/industrial land changes use; provisionally/draft approved applications exempt. | 2026-10-26 |
| Richmond Hill City |
City of Richmond Hill By-law 10-24 (City-wide Library Services Development Charges)
+7 more adopted 2024-03-27 |
charge per single-detached home: $3,169 per single/semi unit (library services only; 2023 $, indexed July 1) · charge per apartment unit: Large (>=700 sq.ft.) $2,001; small (<700 sq.ft.) $1,421 per unit (library services only; 2023 $) · non-residential charge: Retail $0.57; non-retail $0.43 per sq ft GFA (library services only; 2023 $) | 2026-10-25 |
| Rideau Lakes Township |
Township of Rideau Lakes By-law 2024-105, Development Charges By-law, 2024
+1 more |
charge per single-detached home: 7,358 per unit (2026 Update) · charge per apartment unit: Apartments - 2 Bedrooms+: 5,058 per unit; Apartments - Bachelor and 1 Bedroom: 3,798 per unit (2026 Update) · non-residential charge: Industrial, Commercial, Institutional: 2.42 per sq.ft. of Gross Floor Area; Agricultural: 0.56 per sq.ft. of Gross Floor Area (2026 Update) | 2026-10-23 |
| Russell Township |
Township of Russell Development Charges By-law 2026-007
adopted 2026-01-26 |
charge per single-detached home: $18,808 per unit un-serviced; $36,726 per unit serviced (Effective January 1, 2026) · charge per apartment unit: Apartments (2 Bedroom +): $11,124 un-serviced / $21,721 serviced; Apartments (Bachelor & 1 Bedroom): $7,945 un-serviced / $15,515 serviced (Effective January 1, 2026) · non-residential charge: $26.33 per sq. m. un-serviced; $146.14 per sq. m. serviced (Effective January 1, 2026) | 2026-10-23 |
| Sarnia City |
Development Charges By-Law No. 1 of 2024
+1 more |
services covered: Highway, County Roads, fire, police, parks/recreation, library, storm drainage/control, wastewater, water. · exemptions: Farm buildings; no-building uses; specified business parks; temporary/non-serviced storage/airport hangars; non-profit/affordable housing; industrial expansion up to 50%; additional residential units; rental housing discounts. · payable: At first building permit; rental/institutional in 6 equal annual payments from occupancy. | 2026-10-19 |
| Saugeen Shores Town |
Development Charges (Town of Saugeen Shores web page)
+1 more |
charge per single-detached home: $45,021 per unit (2026) · charge per apartment unit: 2+ bedrooms $27,304; bachelor/1-bed $15,987 per unit (2026) · non-residential charge: $152.61 per m² of Gross Floor Area (Commercial/Institutional/Industrial, 2026) | 2026-10-23 |
| Scugog Township |
Scugog Schedule of Development Charges, effective July 1, 2026
+1 more |
charge per single-detached home: $33,581 per unit (Township of Scugog, July 1, 2026); $117,343 total incl. Durham Region and education (serviced lot), $73,581 (unserviced) · charge per apartment unit: $18,721 per unit, any bedroom count (Township of Scugog, July 1, 2026); $37,830 to $70,576 total incl. Durham Region and education · non-residential charge: Per sq m GFA (Township of Scugog, July 1, 2026): commercial $237.13; industrial $99.57; institutional $166.97; Durham Region and education extra | 2026-10-19 |
| Seguin Township |
Development Charges By-law 2024-080 | — | 2026-10-26 |
| Selwyn Township |
Township of Selwyn Development Charges By-law 2023-053 (Roads and Related and Growth-related Studies), consolidated as amended by 2024-070, 2025-026 & 2026-026
+7 more adopted 2023-08-08 |
charge per single-detached home: $2,993 per unit ($2,865 Roads and Related + $128 Growth-related Studies) (Schedule A to By-law No. 2024-070) · charge per apartment unit: 2 Bedrooms+: $2,339 per unit ($2,239 Roads and Related + $100 Growth-related Studies); Bachelor and 1 Bedroom: $1,345 per unit ($1,287 Roads and Related + $58 Growth-related Studies) (Schedule A to By-law No. 2024-070) · non-residential charge: $1.93 per sq.ft. of gross floor area ($1.85 Roads and Related + $0.08 Growth-related Studies) (Schedule A to By-law No. 2024-070) | 2026-10-23 |
| Severn Township |
Township of Severn development charges (municipal-wide and area-specific rates) | charge per single-detached home: $18,331 per single/semi Township-wide (effective September 5, 2026); area-specific water/wastewater adds $36,020 (Westshore) or $22,247 (Coldwater) · charge per apartment unit: Township-wide: $11,906 (2+ bedrooms); $7,834 (1 bedroom/bachelor) (effective Sept 5, 2026); Westshore adds $23,394/$15,393, Coldwater $14,448/$9,507 · non-residential charge: $11.11 per sq.ft. of GFA Township-wide (effective September 5, 2026); Westshore adds $36.42, Coldwater $13.28 per sq.ft. | 2026-10-19 |
| Shelburne Town |
Town of Shelburne Development Charges pamphlet (revised January 28, 2026)
+3 more |
charge per single-detached home: Single & Semi-Detached: $51,480/unit (fully serviced, without wastewater financing charge); $58,662/unit (fully serviced, with wastewater financing charge) — revised Jan 28, 2026 · charge per apartment unit: Apartments 2+ bedrooms: $30,491/unit (without financing) / $34,746/unit (with financing); Apartments ≤1 bedroom: $19,886/unit (without financing) / $22,661/unit (with financing) · non-residential charge: $139.83/sq.m (fully serviced, without wastewater financing charge); $167.63/sq.m (fully serviced, with wastewater financing charge) | 2026-10-26 |
| Simcoe County County |
County of Simcoe Development Charges rates, effective January 1, 2026 (By-law 6930) | charge per single-detached home: $14,975 per unit (Jan 1 2026) · charge per apartment unit: $8,029 per unit (Jan 1 2026) · non-residential charge: $63.01 per sq.m of gross floor area (Jan 1 2026) | 2026-10-19 |
| Smiths Falls Town |
Development Charges By-law No. 10324-2022
adopted 2022-03-21 |
charge per single-detached home: $12,530 per unit (effective June 1, 2022) · charge per apartment unit: $7,516 per unit (effective June 1, 2022) · non-residential charge: $78.52 per sq.m (effective June 1, 2022) | 2026-10-19 |
| South Bruce Municipality |
By-Law 2025-36, Being a By-Law to Impose Development Charges (Municipality of South Bruce)
adopted 2025-06-24 |
charge per single-detached home: Singles & Semi: $3,206/unit Municipal-Wide; $9,327/unit Mildmay; $10,309/unit Teeswater (full Schedule C; 33% in 2025, 66% in 2026, 100% from 2027) · charge per apartment unit: 1-bed/bachelor: $1,603 municipal-wide, $4,663 Mildmay, $5,154 Teeswater; 2+ bed: $1,961, $5,706 Mildmay, $6,308 Teeswater (full Schedule C; phased 33%/66%/100%) · non-residential charge: No development charges imposed on non-residential uses | 2026-10-23 |
| South Bruce Peninsula Town |
Development Charges By-Law 30-2022 (Town of South Bruce Peninsula)
adopted 2022-04-19 |
charge per single-detached home: $7,885 per unit (South Wiarton Service Area); $10,708 per unit (Outside of South Wiarton Service Area) (effective April 20, 2022) · charge per apartment unit: $4,472 per unit (South Wiarton Service Area); $6,072 per unit (Outside of South Wiarton Service Area) · non-residential charge: $4.76 per sq ft of GFA (South Wiarton Service Area); $9.14 per sq ft of GFA (Outside of South Wiarton Service Area) | 2026-10-26 |
| South Frontenac Township |
Development Charges By-Law 2024-53 (Township of South Frontenac)
+1 more adopted 2024-07-16 |
services covered: Highway; fire protection; policing; parks and recreation; library; waste diversion; growth-related studies. · exemptions: Exempt: education, municipal, agricultural, worship; certain additional residential units; non-profit, affordable, attainable housing; first industrial expansion 50% or less. Rental housing reduced 15–25% by bedrooms. · payable: Payable on first building permit; rental/institutional in 6 equal installments from occupancy; agreement may alter. | 2026-10-23 |
| South Huron Municipality |
Development Charges By-Law 17-2020 (consolidated with 68-2020 and 14-2025), Municipality of South Huron
+1 more adopted 2020-03-16 |
charge per single-detached home: $2,801 rural; $3,717 partially serviced (water only); $4,368 urban per single/semi (Schedule B as amended by 68-2020; 2020 base, indexed Jan 1) · charge per apartment unit: 2+ bedrooms: $1,937 rural / $2,570 water-only / $3,020 urban; bachelor & 1 bedroom: $1,051 / $1,395 / $1,639 (2020 base, indexed Jan 1) · non-residential charge: Other non-residential: $0.55/sq ft rural; $0.77 partially serviced (water only); $1.04 urban (2020 base, indexed Jan 1) | 2026-10-19 |
| South Stormont Township |
Development Charges (rates page, 2026)
+1 more |
charge per single-detached home: $9,879 per unit (effective September 15, 2026) · charge per apartment unit: Apartments 2 Bedrooms+: $6,225 per unit; Apartments Bachelor and 1 Bedroom: $4,640 per unit (effective September 15, 2026) · non-residential charge: $0.64 per sq. ft. of Gross Floor Area | 2026-10-23 |
| South-West Oxford Township |
By-law No. 49-2024, A By-law to Establish Township-Wide Development Charges for the Township of South-West Oxford
+1 more adopted 2024-06-18 |
charge per single-detached home: $8,258 per unit (sum of Schedules B1-B4; effective June 18, 2024) · charge per apartment unit: 2 Bedrooms+: $3,935 per unit; Bachelor and 1 Bedroom: $2,498 per unit (sum of Schedules B1-B4; effective June 18, 2024) · non-residential charge: $20.94 per sq.m. of Gross Floor Area (sum of Schedules B1-B4; effective June 18, 2024) | 2026-10-19 |
| Southgate Township |
Development Charges By-law No. 2022-154
+1 more adopted 2022-10-05 |
charge per single-detached home: $8,027 rural; $16,687 urban per single/semi-detached dwelling (Schedule A, in force Oct 6, 2022; 2022 base, indexed Jan 1) · charge per apartment unit: 2+ bedrooms: $5,128 rural / $10,661 urban; bachelor and 1 bedroom: $3,420 / $7,110 (Schedule A, 2022 base, indexed Jan 1) · non-residential charge: $1.96/sq.ft. rural; $6.01/sq.ft. urban of gross floor area (Schedule A, 2022 base, indexed Jan 1) | 2026-10-19 |
| Southwold Township |
Development Charges By-law No. 2020-70 (as amended by By-law 2025-58), Township of Southwold
+1 more adopted 2020-12-14 |
services covered: Roads and Related Services; Fire Services; Parks and Recreation Services; Library Services; Class for Growth Studies · exemptions: Exempt: board of education, municipality/local board, industrial, place of worship, agricultural uses; certain pre-2021/2022 consents/lots; registered pre-by-law subdivisions; additional residential units subject to restrictions · payable: Payable in full when first building permit is issued; rental/institutional in 6 installments from occupancy; non-profit housing in 21 installments from occupancy | 2026-10-23 |
| Springwater Township |
Development Charges By-law No. 2023-070
+1 more adopted 2023-06-21 |
charge per single-detached home: $21,188 Township-wide / $34,558 Elmvale per single/semi (original Schedule B, in force July 1, 2023; indexed annually, since amended) · charge per apartment unit: Township-wide: $11,796 (2+ bedrooms) / $7,691 (bachelor & 1 bedroom); Elmvale: $19,240 / $12,543 (original Schedule B, July 1, 2023) · non-residential charge: $6.15/sq.ft. ($66.20/m²) Township-wide; $12.55/sq.ft. ($135.09/m²) Elmvale (original Schedule B, July 1, 2023) | 2026-10-26 |
| St. Catharines City |
City Development Charges (rates page)
+1 more |
charge per single-detached home: Urban: $14,007 per unit; Rural: $13,598 per unit (Jan. 1, 2026 to Dec. 31, 2026) · charge per apartment unit: Apartments (two plus bedrooms): Urban $10,170 / Rural $9,874; Apartments (Bachelor/One bedroom): Urban $6,954 / Rural $6,751 (Jan. 1, 2026 to Dec. 31, 2026) · non-residential charge: Urban: $2.45 per sq ft / $26.20 per sq metre; Rural: $2.10 per sq ft / $22.38 per sq metre (Jan. 1, 2026 to Dec. 31, 2026) | 2026-10-25 |
| St. Marys Town |
Development Charges By-law 106-2022 (repeals 99-2017)
+1 more adopted 2022-12-13 |
charge per single-detached home: $11,242 per single/semi-detached unit (from Jan 1, 2023, indexed annually); Year-1 (2023) 20% phase-in discount gave $8,994 · charge per apartment unit: $7,202 per unit (2+ bedrooms); $5,255 per unit (bachelor & 1 bedroom) (from Jan 1, 2023, indexed; 2023 phase-in: $5,762 / $4,204) · non-residential charge: $5.00 per sq.ft. of gross floor area (from Jan 1, 2023, indexed; 2023 phase-in: $4.00) | 2026-10-19 |
| St. Thomas City |
By-law 139-2020, Development Charges - South Block Area
+2 more adopted 2020-11-02 |
services covered: Administration, wastewater, water; roads in South Block Sub Area 2 (Schedule A). · exemptions: s.4(2): board of education, municipality/local board, hospital, college/university, cemetery/place of worship, industrial use, second dwelling unit; s.5: intensification of existing housing. · payable: Payable in full when first building permit issued; subdivision on plan registration; rental/institutional 6 annual instalments from occupancy; non-profit housing 21 annual instalments. | 2026-10-19 |
| Stone Mills Township |
Development Charges By-Law 2024-1276
+1 more adopted 2024-11-18 |
charge per single-detached home: $2,274.36 per unit (Jan 1 2025-Dec 31 2025); $3,411.54 per unit (Jan 1 2026-Dec 31 2026); $4,548.72 per unit (Jan 1 2027-Dec 31 2034) · charge per apartment unit: $1,639.90 per unit (Jan 1 2025-Dec 31 2025); $2,459.84 per unit (Jan 1 2026-Dec 31 2026); $3,279.81 per unit (Jan 1 2027-Dec 31 2034) · non-residential charge: Commercial/Institutional and Industrial (per metre 2 of GFA): $10.86 (Jan 1 2025-Dec 31 2025); $16.30 (Jan 1 2026-Dec 31 2026); $21.73 (Jan 1 2027-Dec 31 2034) | 2026-10-23 |
| Stratford City |
2026 Development Charges Brochure (April 2026)
+1 more |
charge per single-detached home: $18,258 per unit (as of April 5, 2026) · charge per apartment unit: Apartments-2 bdrm+: $10,579; Apartments-bach/1bdrm: $7,864; Special Units: $7,268 (as of April 5, 2026) · non-residential charge: $3.20 per sq. ft (as of April 5, 2026) | 2026-10-28 |
| Strathroy-Caradoc Municipality |
Development Charges By-law No. 10-20 (rural and Strathroy area: roads, fire, police)
+2 more adopted 2020-02-18 |
charge per single-detached home: Roads, public works, fire, police: Rural $3,448 per single/semi unit; with water/wastewater/engineering: Strathroy $19,478, Mount Brydges $13,828 (March 2, 2020; excludes parks) · charge per apartment unit: Roads, public works, fire, police: Rural $1,792 per apartment; with water/wastewater: Strathroy $10,122, Mount Brydges $7,186 (March 2, 2020; excludes parks) · non-residential charge: Rural $19.56/sq.m; Strathroy $109.04/sq.m; Mount Brydges $103.28/sq.m (By-law 10-20 services only; March 2, 2020) | 2026-10-25 |
| Tay Township |
By-law No. 2024-04 (Development Charges: General Services and Services Related to a Highway), consolidated to By-law 2024-67
+2 more adopted 2024-01-24 |
charge per single-detached home: $8,707 per single/semi unit (township-wide general services and highways; 2024 base, indexed Jan 1) · charge per apartment unit: $5,543 per apartment unit (township-wide general services and highways; 2024 base) · non-residential charge: $40.28 per sq.m (township-wide general services and highways; 2024 base) | 2026-10-19 |
| Tecumseh Town |
By-law 2014-68 - Development Charges
+2 more |
services covered: roads and related; fire protection; police; library; outdoor recreation; indoor recreation; administration; water; wastewater · exemptions: Non-residential farm buildings; industrial enlargement ≤50% exempt, >50% prorated; Town/board of education/County lands; redevelopment credits. · payable: Payable upon issuance of a building permit with respect to each dwelling unit, building or structure. | 2026-10-23 |
| Thames Centre Municipality |
Municipality of Thames Centre By-law No. 17-2022 - Development Charge By-law, 2022 (consolidated, amended Jan 2026)
+1 more adopted 2022-03-07 |
charge per single-detached home: Rural: $17,350.37 per unit; Urban: $51,083.71 per unit (Jan 1 2026) · charge per apartment unit: Rural: Apartments - 2 Bedrooms+ $10,802.39/unit; Apartments - 1 Bedroom $6,807.29/unit (Jan 1 2026) · non-residential charge: Rural: $3.91 per sq. ft.; Urban: $19.86 per sq. ft. (Jan 1 2026) | 2026-10-23 |
| The Blue Mountains Town |
2026 Development Charges Pamphlet (By-law 2024-29)
+1 more |
charge per single-detached home: Varies by service area: $24,368 (Swiss Meadows) to $108,912 (Osler) per single/semi-detached unit · charge per apartment unit: Varies by service area: $16,402 (Swiss Meadows) to $73,311 (Osler) per apartment unit · non-residential charge: Varies by service area: $95.86/m2 (Swiss Meadows) to $773.04/m2 (Clarksburg) of gross floor area; Town Wide Uniform Charge $95.86/m2 | 2026-10-23 |
| The Nation Municipality |
Development Charges By-law No. 63-2023
adopted 2023-04-03 |
charge per single-detached home: $5,457.92 per unit (2026 schedule rate, from Jan 1, 2026, plus construction-price indexing) · charge per apartment unit: $2,889.49 per unit, apartment or multiple attached (2026 schedule rate, from Jan 1, 2026, plus construction-price indexing) · non-residential charge: $2 per sq ft (since Jan 1, 2024) | 2026-10-23 |
| Thorold City |
2026 Schedule of Development Charges (Schedule B, By-law 41-2024 as revised by 90-2024)
+1 more |
charge per single-detached home: $22,376 per unit city-wide; $27,219 with urban water/wastewater (January 1, 2026); Rolling Meadows area adds $227 · charge per apartment unit: 2+ bedrooms: $14,607 city-wide / $17,768 with urban services; bachelor/1-bed: $9,466 / $11,514 (January 1, 2026) · non-residential charge: Commercial/institutional $9.69/sq.ft. city-wide, $12.65 with urban services; industrial $4.31 / $5.64 per sq.ft. GFA (January 1, 2026) | 2026-10-19 |
| Tillsonburg Town |
Development Charges By-law 2024-067
+1 more adopted 2024-06-12 |
charge per single-detached home: $14,691 per single/semi unit for roads, fire and parks & recreation only (Schedules B1-B3, June 13, 2024); policing and studies amounts not legible in this copy · charge per apartment unit: Apartments 2 Bedrooms+: $2,662 (B1) + $5,828 (B3) per unit; Bachelor and 1 Bedroom: $1,690 (B1) + $3,699 (B3) per unit; B2/B4/B5 apartment amounts not stated/OCR garbled · non-residential charge: $20.98 + $7.01 + $7.66 + $0.03 + $0.33 = $36.01 per sq.m. of Gross Floor Area (Schedules B1-B5; effective June 13, 2024) | 2026-10-26 |
| Tiny Township |
Development Charges By-law 25-054
+1 more |
charge per single-detached home: $10,046 per single/semi unit (Schedule B; by-law in effect on passage, November 2025) · charge per apartment unit: $7,664 (2+ bedrooms); $5,244 (bachelor/1 bedroom) per apartment unit (Schedule B, November 2025) · non-residential charge: $79.38 per square metre | 2026-10-23 |
| Toronto City |
City of Toronto By-law 1137-2022 - Municipal Code Chapter 415, Article I, Development Charges
+1 more adopted 2022-08-15 |
charge per single-detached home: $137,040 per unit (Schedule A-3, effective May 1, 2024; earlier phases $93,978 and $115,509; indexed each May 1) · charge per apartment unit: 2+ bedrooms $80,218; 1 bedroom and bachelor $52,367 per unit (Schedule A-3, effective May 1, 2024) · non-residential charge: $666.90 per sq.m ground-floor GFA (Schedule B-1, effective May 1, 2024); $476.94 for inclusionary zoning buildings | 2026-10-28 |
| Trent Hills Municipality |
Development Charges By-law No. 2024-023 (Highway Services and Growth Related Studies), office consolidation Nov 15, 2024
+4 more |
charge per single-detached home: $1,619 per single/semi unit (highway services and growth studies only; effective Feb 20, 2024) · charge per apartment unit: $1,070 (2+ bedrooms); $859 (bachelor/1 bedroom) per unit (highway services and growth studies only; Feb 20, 2024) · non-residential charge: $8.67 per sq.m GFA (highway $7.67 + studies $1.00; Feb 20, 2024); $1,618.86 per wind turbine or per 500 kW solar | 2026-10-19 |
| Trent Lakes Municipality |
Development Charges page (rates as of April 2, 2026) | charge per single-detached home: $8,777 per unit (Municipality of Trent Lakes, as of April 2, 2026); County of Peterborough charges separately ($13,948 over 1,109 sq ft) · charge per apartment unit: Duplex/multiples $7,394 per unit (Municipality of Trent Lakes, as of April 2, 2026); no separate apartment rate · non-residential charge: $30.14 per m2 (Municipality of Trent Lakes, as of April 2, 2026); County $50.42/m2 and school boards extra | 2026-10-23 |
| Uxbridge Township |
By-law Number 2024-038, Being a By-law Respecting Development Charges (Services Related to a Highway; Storm Water Drainage and Control)
+4 more adopted 2024-05-06 |
charge per single-detached home: $15,134 per single/semi unit (highway and stormwater services only: $2,026 + $9,880 + $3,228; 2024 rates) · charge per apartment unit: $8,018 per apartment unit (highway and stormwater services only: $1,073 + $5,235 + $1,710; 2024 rates) · non-residential charge: $139.86 per sq.m (public works/fleet $18.72 + roads $91.31 + stormwater $29.83; 2024 rates) | 2026-10-19 |
| Vaughan City |
City-Wide Development Charges By-law 109-2022
adopted 2022-06-28 |
charge per single-detached home: $80,420 per unit (effective June 1, 2023 to June 1, 2028; current as of June 1, 2023) · charge per apartment unit: Large Apartments: $49,974 per unit; Small Apartments: $36,016 per unit (effective June 1, 2023 to June 1, 2028) · non-residential charge: $252.66 per square metre of GFA (effective June 1, 2023 to June 1, 2028) | 2026-10-25 |
| Wainfleet Township |
Development Charges By-law 025-2021 as amended by By-law 021-2026
adopted 2021-07-27 |
charge per single-detached home: 8,142 per unit (Total Township-Wide Services/Class of Services) · charge per apartment unit: 5,360 per unit (Apartments - 2 Bedrooms +); 3,276 per unit (Apartments - Bachelor and 1 Bedroom) · non-residential charge: 3.18 per sq.ft. of Gross Floor Area; 6,405 per Wind Turbine unit | 2026-10-19 |
| Wasaga Beach Town |
Development Charges By-law 2026-35 (Town-wide)
+1 more adopted 2026-04-20 |
charge per single-detached home: $39,769 per unit (effective May 24, 2026) · charge per apartment unit: $19,803 per unit (effective May 24, 2026) · non-residential charge: $277.05 per sq.m | 2026-10-19 |
| Waterloo City |
Development Charges Bylaw 2026-019
+2 more adopted 2026-03-23 |
services covered: capital costs of facilities, services and matters required because of development or redevelopment · exemptions: City/local board, Board of Education, Region/local board; long-term care, retirement home, post-secondary, Royal Canadian Legion, hospice, non-profit housing; in-force Section 37 bylaw; in-kind contributions reduce charge · payable: prior to issuance of the first building permit, or in accordance with an alternative arrangement satisfactory to the City | 2026-10-19 |
| Welland City |
Development Charges By-law 2022-165 (Northwest Service Area)
+3 more adopted 2022-08-18 |
charge per single-detached home: $14,759.34 per single/semi/duplex unit (Northwest Service Area stormwater, water, wastewater only; 2022 base rate, indexed annually from Jan 1, 2023) · charge per apartment unit: $6,998.61 per 1-bedroom-or-less apartment; $12,323.34 per 2+ bedroom apartment (Northwest Service Area only; 2022 base rates, indexed annually from Jan 1, 2023) · non-residential charge: $15.30 per sq.ft. GFA (Northwest Service Area only; 2022 base rate, indexed annually from Jan 1, 2023) | 2026-10-19 |
| Wellesley Township |
2026 Development Charges Brochure (rates as of Dec 2025)
+1 more |
charge per single-detached home: $22,359 per unit (December 2025 rates, By-law #48/2024) · charge per apartment unit: $12,994 per unit (2+ bedroom); $8,419 per unit (bachelor & 1 bedroom) (December 2025 rates) · non-residential charge: $25.09 per square metre of floor area (December 2025 rates) | 2026-10-23 |
| Wellington County County |
By-Law No. 5759-22 Consolidated Development Charges for the County of Wellington
+1 more adopted 2022-05-26 |
charge per single-detached home: Single and Semi-Detached Dwelling: $8,984 per unit (effective June 1, 2022) · charge per apartment unit: Apartments - 2 Bedrooms +: $4,793 per unit; Apartments - Bachelor and 1 Bedroom: $3,908 per unit (effective June 1, 2022) · non-residential charge: Total County-Wide Services/Class of Services: $2.50 per sq.ft. of Gross Floor Area (effective June 1, 2022) | 2026-10-19 |
| Wellington North Township |
Development Charges By-law 027-2022 (consolidated incl. 076-2022 and 059-2025)
+1 more adopted 2022-02-22 |
charge per single-detached home: $19,426.01 urban; $4,640.93 rural per single/semi unit (Schedule B base rates from April 1, 2022; indexed annually from Jan 1, 2023) · charge per apartment unit: 2+ bedrooms: $12,605.59 urban / $3,011.51 rural; bachelor/1-bed: $9,195.38 urban / $2,196.80 rural per unit (Schedule B base rates from April 1, 2022; indexed from Jan 1, 2023) · non-residential charge: Commercial/institutional $7.07 urban / $1.29 rural; industrial $3.54 / $0.64; warehouse $1.77 / $0.32 per sq.ft. GFA (Schedule B base rates from April 1, 2022; indexed from Jan 1, 2023) | 2026-10-19 |
| West Grey Municipality |
Development Charges Bylaw No. 31-2020 | charge per single-detached home: $6,176 per single/semi unit (Schedule B full rate, phased in 52.62% to 100% by Jan 1, 2025); By-law 31-2020 expired April 2025 · charge per apartment unit: 2+ bedrooms: $4,163; bachelor/1-bed: $2,777 per unit (Schedule B full rates, 100% from Jan 1, 2025); By-law 31-2020 expired April 2025 · non-residential charge: $3.34 per sq.ft. GFA calculated in Schedule B, but Schedule C phase-in is 0.00% in every year (no non-residential charge); by-law expired April 2025 | 2026-10-19 |
| West Lincoln Township |
By-law 2024-70 Imposition of Development Charges
adopted 2024-10-28 |
charge per single-detached home: $29,160 per unit (rural area); $34,805 per unit (urban area) (Schedule B; initial indexation Jan 1, 2025) · charge per apartment unit: 2+ bedrooms: $18,695 rural / $22,314 urban; bachelor/1-bed: $12,113 rural / $14,458 urban per unit (Schedule B, in force Oct 29, 2024; indexed annually from Jan 1, 2025) · non-residential charge: $9.08 per sq.ft. GFA (rural area); $11.16 per sq.ft. GFA (urban area) (Schedule B; initial indexation Jan 1, 2025) | 2026-10-19 |
| West Perth Municipality |
Development Charges By-law 63-2024
+1 more adopted 2024-11-25 |
charge per single-detached home: $9,157 rural / $19,827 urban per single/semi unit (Schedule B-2, 95% phase-in, Feb 1, 2026 to Jan 31, 2027, before indexing); $9,638 / $20,870 from Feb 1, 2027 · charge per apartment unit: 2+ bedrooms: $5,291 rural / $11,457 urban; bachelor/1-bed: $3,485 / $7,546 per unit (Schedule B-2, Feb 1, 2026 to Jan 31, 2027, before indexing) · non-residential charge: $2.75 rural / $6.82 urban per sq.ft. GFA (Schedule B-2, Feb 1, 2026 to Jan 31, 2027, before indexing); $2.88 / $7.17 from Feb 1, 2027 | 2026-10-23 |
| Whitby Town |
Town of Whitby Development Charges Rate Schedule, February 1, 2026
+1 more |
services covered: Parking, Community Benefits Charge administration, culture/tourism infrastructure, roads/active transportation, public hospital, climate change, town facilities, parkland/community facilities, public art/heritage · charge per single-detached home: $53,022.00 per unit (Rate A, as of February 1, 2026) · charge per apartment unit: Apartment 2 or more bedrooms: $22,259.91 per unit (Rate C); Apartment 1 or fewer bedrooms: $17,010.26 per unit (Rate D); as of February 1, 2026 | 2026-10-28 |
| Whitchurch-Stouffville Town |
By-law 2023-146-FI (Consolidated) - Development Charges, Parks and Recreation Services
+4 more adopted 2023-12-06 |
non-residential charge: $1.161 per sq.ft. GFA (parks and recreation service only; effective Jan 1, 2024) · services covered: Parks and Recreation Services · exemptions: Additional residential units; rental housing bedroom reductions; affordable/attainable units; industrial enlargement ≤50%; non-residential farm buildings. | 2026-10-19 |
| Wilmot Township |
Development Charges (Township of Wilmot page) | charge per single-detached home: $24,566 per single/semi unit township-wide; $36,291 in New Hamburg/Baden (adds water and wastewater) (Dec 1, 2025 to Dec 1, 2026) · charge per apartment unit: 2+ bedrooms: $16,719 township-wide / $24,700 New Hamburg/Baden; under 2 bedrooms: $10,346 / $15,282 per unit (Dec 1, 2025 to Dec 1, 2026) · non-residential charge: Industrial: $7.13 township-wide / $10.26 New Hamburg/Baden; commercial/institutional: $9.59 / $16.17 per sq.ft. GFA (Dec 1, 2025 to Dec 1, 2026) | 2026-10-23 |
| Windsor City |
Development Charges (City of Windsor page)
+3 more |
charge per single-detached home: $45,064 per single-detached unit city-wide; $70,646 in Sandwich South Planning District; $0 in the DC Exemption Area (Nov 1, 2025 to Oct 31, 2026) · non-residential charge: Non-industrial: $20.14 per sq.ft. GFA city-wide; $29.16 in Sandwich South; industrial $0 (exempt); $0 in the DC Exemption Area (Nov 1, 2025 to Oct 31, 2026) · exemptions: Industrial $0 (exempt); Development Charge Exemption Area: all residential and non-residential $0 (exempt). | 2026-10-19 |
| Woodstock City |
By-law 9538-22 - A by-law to establish development charges for the City of Woodstock
+2 more adopted 2022-06-16 |
charge per single-detached home: $15,134 per unit (Effective January 1, 2023) · charge per apartment unit: $8,454 per unit (2+ bedrooms); $6,887 per unit (bachelor or 1 bedroom) (Effective January 1, 2023) · non-residential charge: $36.07 per square metre (non-industrial); $20.55 per square metre (industrial) (Effective January 1, 2023) | 2026-10-26 |
| Woolwich Township |
By-law 39-2024 - A By-law for the Imposition of Development Charges
+1 more adopted 2024-07-02 |
charge per single-detached home: $18,759 rural; $27,764 urban; $32,081 Breslau Sanitary Servicing Area per single and semi-detached dwelling (By-law effective July 2, 2024) · charge per apartment unit: Apartments - 2 Bedrooms +: $11,993 rural; $17,750 urban; $19,496 Breslau. Apartments - Bachelor and 1 Bedroom: $7,770 rural; $11,500 urban; $13,136 Breslau per unit · non-residential charge: $5.49/sq.ft. rural; $8.96/sq.ft. urban; $11.48/sq.ft. Breslau Sanitary Servicing Area (per sq.ft. of Gross Floor Area) | 2026-10-23 |
| Zorra Township |
Development Charges (Township of Zorra page)
+3 more |
parkland dedication: Up to 5% of land (residential), up to 2% (commercial/industrial); cash in lieu for a new residential lot by consent: $5,500.00 in 2026, rising to $6,000.00 in 2028 (Schedule A) · services covered: land for park or other public recreational purposes · exemptions: Additional dwelling unit, home occupation, bed and breakfast, home industry/custom workshop; one commercial accessory apartment; non-profit housing; Planning Act exemptions (Additional Residential Units); sustainability criteria reduction. | 2026-10-19 |
Nothing on file for development charges & levies
Absence here is explicit, not a gap: each municipality below was checked, and its status says why there is no document.
Checked, nothing adopted (25) — Admaston/Bromley (2026-10-26), Armstrong (2026-10-26), Asphodel–Norwood (2026-10-19), Augusta (2026-10-19), Callander (2026-10-19), Frontenac Islands (2026-10-23), Hawkesbury (2026-10-23), Lake of Bays (2026-10-23), Loyalist (2026-10-26), Malahide (2026-10-23), North Grenville (2026-10-23), North Kawartha (2026-10-19), Northern Bruce Peninsula (2026-10-26), Otonabee–South Monaghan (2026-10-23), Petrolia (2026-10-23), Plympton–Wyoming (2026-10-23), Prescott (2026-10-23), South Dundas (2026-10-19), St. Clair (2026-10-26), Tudor and Cashel (2026-10-26), Tweed (2026-10-26), Tyendinaga (2026-10-23), Westport (2026-10-26), Whitestone (2026-10-19), Whitewater (2026-10-23).
Other bylaws on file, none on this topic (202) — Addington Highlands, Alberton, Algonquin Highlands, Armour, Arran–Elderslie, Assiginack, Athens, Atikokan, Baldwin, Bancroft, Billings, Black River-Matheson, Blind River, Bonfield, Bonnechere Valley, Brooke-Alvinston, Bruce Mines, Brudenell, Lyndoch and Raglan, Burk's Falls, Burpee and Mills, Calvin, Carling, Carlow/Mayo, Casey, Central Frontenac, Central Huron, Central Manitoulin, Champlain, Chapleau, Chapple, Charlton and Dack, Chatsworth, Chisholm, Cobalt, Cochrane, Cockburn Island, Coleman, Conmee, Dawn-Euphemia, Dawson, Deep River, Deseronto, Dorion, Dryden, Dubreuilville, Dysart et al, Ear Falls, East Ferris, East Hawkesbury, Edwardsburgh/Cardinal, Elgin County, Elizabethtown-Kitley, Elliot Lake, Emo, Englehart, Enniskillen, Espanola, Evanturel, Faraday, Fauquier-Strickland, Fort Frances, French River, Front of Yonge, Frontenac County, Georgian Bluffs, Gillies, Gordon/Barrie Island, Gore Bay, Greenstone, Haliburton County, Hanover, Harley, Harris, Hastings County, Hastings Highlands, Head, Clara and Maria, Hearst, Highlands East, Hilliard, Hilton, Hilton Beach, Hornepayne, Horton, Howick, Hudson, Huron County, Huron East, Huron Shores, Ignace, Iroquois Falls, James, Jocelyn, Johnson, Joly, Kapuskasing, Kearney, Kenora, Kerns, Killaloe, Hagarty and Richards, Killarney, Kirkland Lake, La Vallee, Laird, Lake of the Woods, Lambton County, Lanark County, Lanark Highlands, Larder Lake, Latchford, Laurentian Hills, Leeds and the Thousand Islands, Lennox and Addington County, Limerick, Macdonald, Meredith and Aberdeen Additional, Machar, Machin, Madawaska Valley, Madoc, Magnetawan, Manitouwadge, Marathon, Markstay-Warren, Marmora and Lake, Matachewan, Mattawa, Mattawan, Mattice-Val Côté, McDougall, McGarry, McKellar, McMurrich/Monteith, Minden Hills, Montague, Moonbeam, Moosonee, Morris-Turnberry, Nairn and Hyman, Neebing, Newbury, Nipigon, Nipissing, North Algona Wilberforce, North Frontenac, North Glengarry, North Stormont, Northeastern Manitoulin and the Islands, O'Connor, Oil Springs, Oliver Paipoonge, Opasatika, Papineau-Cameron, Pelee, Perry, Perth County, Perth South, Pickle Lake, Plummer Additional, Point Edward, Powassan, Prescott and Russell, Rainy River, Red Lake, Red Rock, Renfrew County, Ryerson, Sables-Spanish Rivers, Sault Ste. Marie, Schreiber, Shuniah, Sioux Lookout, Sioux Narrows-Nestor Falls, Smooth Rock Falls, South Algonquin, South Glengarry, South River, Southwest Middlesex, Spanish, St. Joseph, St.-Charles, Stirling-Rawdon, Strong, Sundridge, Tarbutt, Tay Valley, Tehkummah, Temagami, Temiskaming Shores, Terrace Bay, The Archipelago, The North Shore, Thessalon, Thunder Bay, Timmins, United Counties of Leeds and Grenville, United Counties of Stormont, Dundas and Glengarry, Val Rita-Harty, Warwick, Wawa, West Elgin, West Nipissing, White River, Wollaston.
No bylaws published online (3, verified negatives) — Chamberlain, Gauthier, Thornloe.
Unconfirmed (2, leads but nothing verified) — Brethour, Morley.